kick-off meeting - brindisi 21 july 2011 ecoplasbrick work package 4 environmental compatibility...

7
KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBr ick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based on an LCA analysis, will aim at assessing the entire product/process. Overall objective of the work package is to evaluate the applicability for the Eco-label and/or for an Environmental Product Declaration (EPD). Activities will begin from an up-to-date analysis of the current Product Groups and related Criteria for the award of the Eco-label and of Product Categories and related Product Category Rules (PCR) for EPD. The LCA analysis will then be conducted keeping in mind both the product group criteria and the PCR, for the definition of the goals and scope and for the impact assessment and interpretation of the analysis’s results. The last step will be the production of technical documents needed to support the application for the ECO- label certification and/or for the Environmental Product Declaration (EPD), sub-contractors (to be identified) will be hired to support the WP leader in these tasks. Duration: month 1 to month 36 Work Package 4 Environmental compatibility analysis

Upload: benjamin-foster

Post on 31-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based

KICK-OFF MEETING - Brindisi 21 July 2011

EcoPlasBrick

Work Package 4

Environmental compatibility analysis

The environmental compatibility analysis, based on an LCA analysis, will aim at assessing the entire product/process.

Overall objective of the work package is to evaluate the applicability for the Eco-label and/or for an Environmental Product Declaration (EPD).

Activities will begin from an up-to-date analysis of the current Product Groups and related Criteria for the award of the Eco-label and of Product Categories and related Product Category Rules (PCR) for EPD.

The LCA analysis will then be conducted keeping in mind both the product group criteria and the PCR, for the definition of the goals and scope and for the impact assessment and interpretation of the analysis’s results. The last step will be the production of technical documents needed to support the application for the ECO-label certification and/or for the Environmental Product Declaration (EPD), sub-contractors (to be identified) will be hired to support the WP leader in these tasks.

Duration: month 1 to month 36

Partners involved: TRE (WP leader), CETMA, MOTULAB

Work Package 4 Environmental compatibility analysis

Page 2: KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based

KICK-OFF MEETING - Brindisi 21 July 2011

EcoPlasBrick

Work Package 4 Environmental compatibility analysis

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

WP1: Management

                                                                       

WP2: Industrialization activities

                                                                       

WP3: Product design and validation

                                                                       

WP4: Environmental compatibility analysis

4.1                                                

4.2                                                                        

4.3                                                                        

4.4                                                                      

WP5: Exploitation and Business Plan

                                                                       

WP6: Dissemination Activities

                                                                       

Page 3: KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based

KICK-OFF MEETING - Brindisi 21 July 2011

EcoPlasBrick

Work Package 4 Environmental compatibility analysis

4.1 Requirements analysis for Eco-Label and

Environmental Product Declaration (Type I and III).

Analysis of the existing Product Categories and related Product Category Rules (PCR) for Environmental Product Declaration and of Product Groups and related Criteria for the award of the ECO-label certification. The aim is to support and address the definition of the goals and scope for LCA-Analysis.

Duration: month 1 to month 12

Partners involved: TRE

Subcontractor: TBD (TRE)

Deliverable: D4.1 Requirements for Environmental Product Declaration (report)

Page 4: KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based

KICK-OFF MEETING - Brindisi 21 July 2011

EcoPlasBrick

Work Package 4: Environmental compatibility analysis

4.2 LCA

Phase I: Definition of the Goal and Scope for the case and Data Inventory.

These activities will be conducted on the basis of the results of task 4.1 and according to ISO standards, in particular: ISO 14041 Environmental management. Life-cycle assessment. Goal and scope definition and inventory analysis

Phase II: Impact assessment

Impact will be assessed through the evaluation of the selected indicators and according to ISO standards, in particular: ISO 14042 Environmental management. Life-cycle assessment. Life-cycle impact assessment

Duration: month 12 to month 24

Partners involved: TRE, MOTULAB (Support the data collection for the LCA inventory)

Deliverables: D4.2.1 LCA phase I: Definition of goal and scope, Data inventory

D4.2.2 LCA phase II: Impact assessment

(reports)

Page 5: KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based

KICK-OFF MEETING - Brindisi 21 July 2011

EcoPlasBrick

Work Package 4 Environmental compatibility analysis

4.3 LCA - phase III: Interpretation

The interpretation of the results will be conducted according to ISO standards, in particular:

ISO 14043 Environmental management. Life-cycle assessment. Life-cycle Interpretation

Duration: month 18 to month 30

Partners involved: TRE

Deliverable: D4.3 LCA phase III: Interpretation of results (report)

Page 6: KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based

KICK-OFF MEETING - Brindisi 21 July 2011

EcoPlasBrick

Work Package 4 Environmental compatibility analysis

4.4 Environmental Product Declaration Documentation

The aim of this task is to produce the requested technical documentation to support the application for the award of the Eco-label and/or for the production of Environmental Product Declaration. Such documentation will be in accordance with the results of the previous tasks, and based on the existing Product Categories for the EPD and Product Groups for Eco-label.

The results of the present task will be the:Product related information;Environmental performance related information;Additional environmental information.

The activities will be carried out complying to the ISO standards, in particular:- ISO 14024 Type I environmental labelling – Principles and procedures for the Eco-label ;- ISO 14025 Environmental labels and declarations – Type III - ISO 21930 Sustainability in building construction - Environmental declaration of

building products for the Environmental Product Declaration .

In case the proposed solution should not fit the existing Product Categories for the Environmental Product Declaration (Type III) or the Product Groups for Eco-label (Type I), activities will focus on the production of a Type II Environmental Label according to the standard:

ISO 14021 Environmental labels and declarations – Self-declared environmental claims (Type

II environmental labelling).

Page 7: KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based

KICK-OFF MEETING - Brindisi 21 July 2011

EcoPlasBrick

Work Package 4 Environmental compatibility analysis

4.4 Environmental Product Declaration Documentation

Duration: month 24 to month 36

Partners involved: TRE

Subcontractor: TBD (TRE)

Deliverable: D4.4 Technical documentation for Environmental Product Declaration (report eng/ita )