Page 1: Kickoff Meeting

Kickoff Meeting

April 8, 2016

The Association of Transcribers & Speech-to-

text Providers and The Center on Education and

Training for Employment

Page 2: Kickoff Meeting

Today’s Purpose

Clarify and obtain agreement on...

o Stakeholder roles, responsibilities

o Objectives

o Scope of work

o Research/ work plan and timeline

o Process decisions

o Next steps

CETEcete.osu.edu

Page 3: Kickoff Meeting

Project Stakeholders

ATSP – Project Leads

Karen Walraven

Jodi Tobin

CETE – Project Team

Brooke Parker

Jim Austin

Cara North

Lindsay McCord

SME Panel

TBD

ATSP Partners

TypeWell

C-Print

Subject-Matter Experts (SMEs)

End users

Page 4: Kickoff Meeting

Stakeholder Roles

Subject Matter Experts (SMEs) are extremely important to the process• existing or previous speech-to-text providers “DO the work”

• provide professional expertise to review and revise analysis findings (panel

work) and insights to cross-check results of the study (verify with population)

• Small panel (5-7 SMEs) identified by project sponsor will

• participate in orientation (30 mins)

• review initial job analysis draft (~60 mins)

• attend a web meeting facilitated by CETE to refine draft (~2 - 3 hrs)

• complete online verification survey (15-30 mins)

• participate in linking KSAOs to job duties (~2 hrs)

• Validation/ Verification Panel (population including ATSP members and non

members) will

• complete online survey as QA of panel work (15-30 mins)

Page 5: Kickoff Meeting

Stakeholder Roles

ATSP Project Leads are extremely important in the process to

• make critical decisions (approvals) throughout the research process

• define project parameters

• select and inform SMEs

• filter SME questions to CETE when needed

• champion the project

CETE Staff are process and methodology experts who will

• facilitate the job analysis study

• engage project leads, stakeholders, and SMEs

• ensure the use of sound research methodology and psychometric practices

• produce a publishable final job analysis report

Page 6: Kickoff Meeting

Current Scope of WorkPrimary Objective: conduct and produce a job analysis report describing the

methodology and findings for the role of transcriber to support development of

certification program and possibly other association tools

Clarification: focus is on work performed by transcribers, not including

practices related to specific technology platforms (e.g., TypeWell, C-Print)

Evidence generated to support NCCA 2014 quality standards, specifically #13-14• SME background and experience and role in study

• CETE capacity to perform work (appropriate qualifications, experience)

• Methods used to delineate domains, tasks, and associated KSAOs

• Online survey methodology

• Documentation of survey results and analysis

• Copy of the survey

Secondary Objective: test a “distance” approach; collect feedback for process

improvement

Out of Scope: test specifications are not part of the current scope of work, but

could be created under a separate agreement

Page 7: Kickoff Meeting

What are we creating?

What is job analysis?

… a systematic process for defining and evaluating the important

domains and tasks of a job or job family, in this case

transcriptionist/ captionist

• examines the job and the professional performing the job

• for the purpose of certification the job analysis should define

those tasks, competencies, and KSAOs related to the purpose

of the credential

Page 8: Kickoff Meeting

What are we creating?Elements of a Job Analysis:

• Duties (broad areas of responsibility)

• Tasks (specific goal-directed activities)

• Associated Knowledge, Skills, Abilities, and Other

Characteristics

Basic Scales of Measurement for Tasks / Knowledge-Skills

• Importance

• Frequency (optional)

• Needed at time of certification

Outputs

• Job Analysis Report

• Task Criticality composites

• Linkage of KSAOs to Duties or Tasks (optional)

Page 9: Kickoff Meeting

How do we conduct a Job Analysis?

CETE has delineated a research-

based, experience-proven

methodology for conducting job

analyses at a distance

Page 10: Kickoff Meeting

How do we conduct a Job Analysis?

• ATSP provides documentation• CETE analyzes and creates draft• ATSP reviews/ provides feedback

• ATSP selects SMEs for panel and sends qualifications to CETE

• CETE facilitates virtual meeting to orient SMEs• CETE sends draft to SMEs for

review and additional info• CETE hosts live, virtual meeting

with panel to revise-refine draft• ATSP representative joins session

• CETE programs job analysis draft into survey

• ATSP reviews survey & provides contact list OR sends out survey

• CETE analyzes results, keeps critical duties, tasks, and KSAOs • CETE sends online survey to small

panel to link KSAOs to duties • Potential virtual meeting may be

needed for consensus of SME panel (CETE to advise)

• ATSP reviews findings • CETE produces draft final report• ATSP provides 1 round of feedback• CETE finalizes and publishes results

of study to ATSP

Page 11: Kickoff Meeting

Major Project Deliverables Approx. Timeline Contingencies

1ᅠ Project Management Ongoing n/a

2ᅠ Kickoff Meeting 8-Apr-16 n/a

3ᅠ Initial Draft Complete 15-Apr-16 Receipt of relevant documentation from ATSP

4ᅠ SME Orientation 22-Apr-16 Invitation from ATSP and availability

5ᅠ Additional Task/KSA Survey 26-Apr-16 Orientation, initial job draft

6ᅠ Synchronous Draft Review 6-May-16 Orientation, initial job draft, availability

7ᅠ Verification Survey 11-May-16 Timeliness of review with SMEs and feedback from ATSP

8ᅠ Linkage Meeting 3-Jun-16 Large enough response to survey, availability, timeliness of analysis

9ᅠ Final Draft 10-Jun-16 All of the above

10ᅠ Client Signoff/Meeting 24-Jun-16 Completion of project

11ᅠ Evaluate Pilot 24-Jun-16 Completion of project

High-Level Timeline

Page 12: Kickoff Meeting

Next StepsCETE will make revisions discussed during this meeting to work plan, then

begin reviewing external sources (e.g., O*NET)

ATSP provides CETE with documentation/materials by 4/12

• Via Buckeye Box (CETE will create)

• Existing documentation describing job of transcriber and any

documentation on the contexts, work environment, etc.

• Any available training materials or task-related materials

ATSP identifies and recruits diverse, representative SME panel (~5-7)

• Provide basic information around responsibilities of panel

• CETE can assist in providing recruiting criteria

• Provide contact information and qualifications to CETE

ATSP begins to identify population/ large, representative sample of SMEs

to participate in verification survey – contact information is very important

Page 13: Kickoff Meeting

CETE Staff Contact Information

Brooke Parker

Associate Director, Assessment Services

614-247-8067

[email protected]

Cara North

Program Specialist

614-688-1110