Page 1: King Street Station Utilities Installation 2.20.11 slide show

Phase 2AIn this slide show:

Utilities Installation

February 22, 2011

Page 2: King Street Station Utilities Installation 2.20.11 slide show

All HVAC duct ends are sealed before installation to maintain air sanitization according to LEED standards.

Page 3: King Street Station Utilities Installation 2.20.11 slide show

HVAC ducts are first installed to the plaza open air mechanical vault.

Page 4: King Street Station Utilities Installation 2.20.11 slide show

The network progressed southward to various locations.

Page 5: King Street Station Utilities Installation 2.20.11 slide show

HVAC ducts shown here are connected to the nearly completed elevator.

Page 6: King Street Station Utilities Installation 2.20.11 slide show

Other utilities network such as water and electricity are installed within a similar time frame.

Page 7: King Street Station Utilities Installation 2.20.11 slide show

Large original windows on the east wall below the plaza are freshly restored and installed.

Page 8: King Street Station Utilities Installation 2.20.11 slide show

Geothermal well pipes are installed to its mechanical network. This system will provide efficient heating and cooling for the entire building.

Page 9: King Street Station Utilities Installation 2.20.11 slide show

The left side original terminal ceiling contrasts with the new plaza steel.

Page 10: King Street Station Utilities Installation 2.20.11 slide show

Northeast corner of plaza still awaits structural beam and column.

Page 11: King Street Station Utilities Installation 2.20.11 slide show

Open air mechanical vault shown from top of plaza. HVAC ducts are connected to this vault to extract clean air for the entire station.

Page 12: King Street Station Utilities Installation 2.20.11 slide show

Concrete trench drains for the plaza were casted. The blankets shown help to insulate and cure the concrete.

Page 13: King Street Station Utilities Installation 2.20.11 slide show

North side canopy trusses were also painted and restored.