kirloskar ferrous industries limited - kfil. · pdf file29-oct-2014 this is a proprietary...
TRANSCRIPT
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Kirloskar Ferrous Industries Limited
1
Koppal Plant
Solapur Plant
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Koppal Plant Location : Bevinahalli Village Nearest City : Koppal /Hospet (16 KM) Nearest Railway Station : Koppal/Hospet Nearest Airport : Bangalore(325KM) : Hubli (140 KM) Nearest Seaport : Goa (300Kms) Capital City : Bangalore(325KM) State : Karnataka
KFIL Solapur Plant Location : Solapur Nearest City : Pune(250 KM) Nearest Railway Station : Solapur Nearest Airport : Pune(250 KM) Capital City : Mumbai(400 KM) Nearest Seaport : Mumbai(400KM) State : Maharashtra
Geographical Locations
Solapur
Koppal
2
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
KFIL Business Profile
Incorporated in 1991, KFIL is the flagship company of the Kirloskar Group.
KFIL was promoted by Kirloskar Oil Engines Limited (KOEL) and Shivaji Works Limited (SWL).
And later in the year 2007, SWL was acquired by KFIL. KFIL is
incorporated with the objective of catering to the requirement of high quality Pig Iron, Intricate thin walled grey iron castings to the emerging in Tractor, Auto, Engine and other related segments.
KFIL is determined to maintain its position as market leader in Pig Iron and Grey Iron Castings business.
KFIL
Pig Iron Foundry
Koppal Plant
Solapur Plant
GF Line KW Line KW Line
3
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
2 Mini Blast Furnaces
3 Power Plants – 11.5 MW
Sinter Plant
Grades produced –
Foundry Grade,
S.G Grade &
Basic Grade
Preferred Brand with Indian Foundries
Started commercial production in 1994
Capacity – 360,000 Tons per year
KFIL PIG IRON Plant
4
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Koppal Foundry -KW line
Koppal plant KW Line Location : Koppal
Installed : 2013
State : Karnataka
Installed Capacity : 48,000MT(Phase I)
Koppal Foundry -GF line
Solapur Foundry – KW Line
KFIL Foundries
Solapur Plant Location : Solapur
Installed : 2008
State : Maharashtra
Installed Capacity : 40,000MT
Koppal plant GF Line Location : Koppal
Installed : 1994
State : Karnataka
Installed Capacity : 45,000 MT
5
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Koppal Foundry -KW line
Machine Shop – BFW Line 1
Location : Solapur
Installed : 2008
State : Maharashtra
Installed Capacity: 24000 Nos. Heads
Machine Shop - Solapur
6
Solapur Machine Shop – BFW Line 1
Solapur Machine Shop – BFW Line 2
Machine Shop – BFW Line 2
Location : Solapur
Installed : 2013
State : Maharashtra
Installed Capacity: 24000 Nos. Head 48000 Nos. Block
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
KFIL- Performance Overview
0
200
400
600
800
11-12 12-13 13-14 13-14(H1) 14-15(H1)
563 677 717
306 426
Pig Iron Sales Rs. (Cr.)
0
200
400
600
11-12 12-13 13-14 13-14(H1) 14-15(H1)
449 442 460
234 254
Casting Sales Rs. (Cr.)
0
100
200
300
11-12 12-13 13-14 13-14 (H1) 14-15(H1)
198 237
276
120 155
Pig Iron Sales MT '000
0
20
40
60
80
11-12 12-13 13-14 13-14(H1) 14-15(H1)
62 59 60
31 31
Casting Sales MT '000
7
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
KFIL- Performance Overview
0
500
1000
1500
11-12 12-13 13-14 13-14(H1) 14-15(H1)
1090 1198 1232
569 706
Total Sales Rs. (Cr.)
0
20
40
60
80
11-12 12-13 13-14 13-14(H1) 14-15(H1)
56 62 58
28
46
5.1% 5.2% 4.7% 4.9% 6.5%
PBT & % to Sales Rs. (Cr.)
0
50
100
150
11-12 12-13 13-14 13-14(H1) 14-15(H1)
95 111 106
51
80
8.7% 9.2% 8.6% 9.0% 11.3%
EBIDTA & % to Sales Rs. (Cr.)
0
10
20
30
40
11-12 12-13 13-14 13-14(H1) 14-15(H1)
37 39 40
18
32
3.4% 3.3% 3.2% 3.2% 4.5%
PAT & % to Sales Rs. (Cr.)
8
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Highlights
Pig Iron Plant:
• Demand for Pig Iron remained stable which helped to maintain
realisation with minor price corrections.
• Prices of input materials other than Iron ore is stable. Prices of
Iron ore in Karnataka remain at higher level inspite of
international prices having come down, because of local supply
problems due to Mines closure.
• Stability in Exchange Rates.
9
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Highlights
Foundry :
• Inspite of downward trend in both Auto and Tractor segments,
we were able to maintain good order position Foundry.
• Working on ramping up of volumes for new moulding line at
Koppal plant.
• Settled the price negotiation with most of the casting customers.
• Machining facilities enhanced at Solapur plant to cater to the
needs of customers. Installation of additional Semi-finished
Machining Facility is in progress at Solapur plant
10
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Financials
Particulars FY
2014 2013 2014 2013 2013-14
Revenue from Operations 368.7 307.0 20% 706.0 569.5 24% 1,232.2
Raw Material Consumption 218.7 198.8 425.6 358.3 796.2
% to Revenue 59.3% 64.7% 60.3% 62.9% 64.6%
Employee cost 15.4 12.8 29.6 24.5 49.6
% to Revenue 4.2% 4.2% 4.2% 4.3% 4.0%
Other Expenditure 88.3 66.6 172.0 137.1 283.4
% to Revenue 23.9% 21.7% 24.4% 24.1% 23.0%
EBITDA 47.0 29.9 57% 80.1 51.3 56% 106.1
% to Revenue 12.8% 9.7% 11.3% 9.0% 8.6%
Depreciation 10.7 8.5 21.3 17.1 33.8
% to Revenue 2.9% 2.8% 3.0% 3.0% 2.7%
PBIT 36.3 21.4 69% 58.8 34.1 72% 72.3
% to Revenue 9.8% 7.0% 8.3% 6.0% 5.9%
Interest 6.2 3.5 12.7 6.4 14.3
% to Revenue 1.7% 1.1% 1.8% 1.1% 1.2%
Profit before Tax 30.1 17.9 68% 46.1 27.7 66% 58.0
% to Revenue 8.2% 5.8% 6.5% 4.9% 4.7%
Profit After Tax 20.2 11.8 71% 32.0 18.1 77% 39.8
% to Revenue 5.5% 3.9% 4.5% 3.2% 3.2%
%
Growth
%
Growth
Half Year ended
30-SepJul-Sep (QII) Rs Crore
11
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Working Capital Management
Particulars UOM
Half Year
ended
30-Sep-2014 2013-14
Inventory Rs. Crores 140.5 162.3
(Days) 60 74
Receivables Rs. Crores 197.4 190.3
(Days) 45 49
Payables Rs. Crores 202.5 247.6
(Days) 87 113
12
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Key Financial Ratio
Particulars
Capital Employed Turnover 2.2 2.0
Fixed Asset Turns 2.5 2.2
ROCE 18.4% 11.7%
Debt to Equity Ratio 0.2 0.2
EPS (Rs. / Share) 2.3 2.9
* Annualised for comparison with 2013-14
# Not Annualised
Half Year
ended
30-Sep-2014
2013-14
*
*
#
*
13
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Dental Camp
Stree Shakti-Seed Money
Road Construction
Medical center at Nearby Village
Tree Plantation Water conservation
Green Plant
Environment rally
Yoga Camp Cultural Programme
Environment and Safety
CSR, Environment, Health and Safety
Barricading for Dust
14
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Environment and Safety
Go Green:
• Around 1,30,000 trees have been planted in and around the factory premises.
• Mesh of around 270 m along the north boundary & raw material yards 1 & 2 to prevent dust going out of factory premises.
• Monthly training given to all operators and chargemens regarding safety & firefighting.
• Safety quizzes and slogan competition conducted to create awareness.
KFIL is ISO 14001:2004 and OHSAS 18001:2007 certified company
15
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
Statements in this presentation, particularly those which relate to management’s views and analysis, describing the Company’s objectives, projections, estimates and expectations may constitute “forward looking statements” within the meaning of applicable laws and regulations. Actual results might differ materially from those either expressed or implied.
Disclaimer
16
This is a proprietary document of Kirloskar Ferrous Industries Limited 29-Oct-2014
THANK YOU
17