Mix and Spoon
Oven
Cool
Pack
Pay
9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
GANTT CHART
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
Mix
Spoon
Load &
Bake
Cool
Pack
Pay
7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
Bottleneck
1 dozen takes – 26 minutes2 dozen takes – 16 + 10 (2) = 36 minutes
Time taken for other activities Time taken for baking
Hence we arrive at the formula16 + 10 (n )
Where ‘n’ is no of orders
Hence in 4 hours i.e. 240 minutes we can fill
240 = 16 + 10 (n)
n = 22.4 orders i.e. 22 orders
3. How much of your and your room
mates time will it take to fill each
order
3. How much of your and your room mates time will it take to fill each order
1 2 3 4 5 6 7 8
Mix and Spoon
Oven
Cool
Pack
Pay
9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
YOU
R.M
R.M
R.M
YOU
Activity Cycle TimeWash Bowl, Mix: 6 minutesFill Tray: 2 minutes
Total 8 minutes
R.M (Roommate)
Activity Cycle TimePrepare Oven: 1 minuteRemove: 0 minutePack: 2 minutes Collect Money: 1 minute
Total 4 minutes
4. Should you give any discounts
4. Will it take any time longer to fill
two dozen cookies
First we look at the costNo electricity cost – as its paid by the landlordVariable costs include:Cost of ingredients $0.60/dozenCost of packing $0.10/dozenCost of time $ 15 per hour
1 dozen 2 dozen 3 dozen
Self 8 10 12
Roommate 4 7 10
Total time 12 17 22
Cost ($) 3 4.25 5.5
Cost per dozen ($)
3 2.125 1.83
If our time is worth 15$ per hour
Selling price of the cookie per dozenCost of ingredient 0.60Cost of packing 0.10Cost of time 3.00Profit margin ??
Selling Price ??
It looks like you could afford to give a discount for two- and three-dozen orders. A two-dozen order doesn't cost twice as much as a one-dozen order.
So on a purchase of 2 dozen cookies we give a discount of 10%And on 3 dozen and above 15%
1 dozen 2 dozen 3 dozen
Cost price per dozen ($)
3 2.125 1.83
Selling price ($) 10 20 30
Discount offered
- 10% 15%
Cost after discount
10 18 25.5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
Mix
Spoon
Load &
Bake
Cool
Pack
Pay
7 8 9 0 1 2 3 4 5 6
4. Will it take any time longer to fill two dozen cookies
Cookie 1 & 2
1
Cookie 1
Cookie 1
1
Cookie 2
1&2
Cookie 2
2
2
This answer is to be explained only by using pictures.
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
Mix
Spoon
Load &
Bake
Cool
Pack
Pay
7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
This answer needs to be explained with pictures. Every cell will have pictures showing what they would be doing. Delete this part once u r done adding pictures.
Our bottleneck operation is the oven, hence here would be no point in expanding or investingin other resources until the operations baking concept is expanded further to two ovens.
If we purchase another oven the time taken for producing 2 orders is 28 minutesExpanding the number of ovens helps us in reducing our time to around 8 minutes per dozen.
Hence it is beneficial for us to add another oven to our capacity.
6. How do we change the production process??? Do we add another oven to our capacity???
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
Mix
Spoon
Load &
Bake
Cool
Pack
Pay
7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
7. What without d roommate ?
8. Should you offer special rates for a crash priority order…..?
Trick question