    SHOP FLOOR CONTROLSHOP FLOOR CONTROL

    SYSTEMSYSTEM

    Presented by:Presented by:--

    KISHOR L. DADMALKISHOR L. DADMALRoll no. 20,Roll no. 20,

    Marathwada Institute of Technology,Marathwada Institute of Technology,

    Aurangabad.Aurangabad.

  • 8/7/2019 kishor dadmal sfcs

    2/21

    Introduction:Introduction:--

    Production management systems are concernedProduction management systems are concernedwith two related objectives; planning and controlwith two related objectives; planning and controlof the manufacturing operations. The functionsof the manufacturing operations. The functionsof production planning, development of theof production planning, development of themaster schedule, capacity planning and MRP allmaster schedule, capacity planning and MRP all

    deal with planning objective. System thatdeal with planning objective. System thataccomplished this objective termed as Shopaccomplished this objective termed as Shopfloor control .floor control .

    Shop Floor Control System

  • 8/7/2019 kishor dadmal sfcs

    3/21

    Major FunctionsMajor Functions

    1. Assigning priority of each shop order1. Assigning priority of each shop order

    2. Maintaining work2. Maintaining work--inin--process quantityprocess quantityinformationinformation

    3. Conveying shop3. Conveying shop--order status information to theorder status information to the

    officeoffice

  • 8/7/2019 kishor dadmal sfcs

    4/21

    Major FunctionsMajor Functions

    4. Providing actual output data for capacity control4. Providing actual output data for capacity control

    purposespurposes

    5. Providing quantity by location by shop order for5. Providing quantity by location by shop order for

    WIP inventory and accounting purposesWIP inventory and accounting purposes

    6. Providing measurement of efficiency, utilization,6. Providing measurement of efficiency, utilization,

    and productivity of manpower and machinesand productivity of manpower and machines

  • 8/7/2019 kishor dadmal sfcs

    5/21

    Shop floor control systemShop floor control system

    The shop floor control system consists of threeThe shop floor control system consists of three

    steps.steps.

    1.Order release.1.Order release.

    2.Order scheduling2.Order scheduling

    3.Order progress.3.Order progress.

  • 8/7/2019 kishor dadmal sfcs

    6/21

    Order ReleaseOrder Release

    The purpose of order release is to provide theThe purpose of order release is to provide thenecessary documentation that accompanies annecessary documentation that accompanies anorder as it is processed through the shop.order as it is processed through the shop.

    The shop packet for an order consists of :The shop packet for an order consists of :

    1.Route sheet.1.Route sheet.

    2.Material requisitions.2.Material requisitions.

    3.Job cards.3.Job cards.

    4.Move ticket.4.Move ticket.

    5.Parts list.5.Parts list.

  • 8/7/2019 kishor dadmal sfcs

    7/21

    Order SchedulingOrder Scheduling

    The purpose is to make assignment of the order toThe purpose is to make assignment of the order tothe various machines in the factory.the various machines in the factory.

    It is the function of priority control to schedule theIt is the function of priority control to schedule theorder for production according to their priorities.order for production according to their priorities.

    The basic document prepared by the orderThe basic document prepared by the orderscheduling module is dispatch list.scheduling module is dispatch list.

  • 8/7/2019 kishor dadmal sfcs

    8/21

    Order ProgressOrder Progress

    The purpose of the order progress module is toThe purpose of the order progress module is to

    accomplish the remaining three function of shopaccomplish the remaining three function of shop

    floor control;floor control;

    To provide data relative to work in progress.To provide data relative to work in progress.

    Shop order status.Shop order status.

    Capacity control.Capacity control.

  • 8/7/2019 kishor dadmal sfcs

    9/21

    Order SchedulingOrder Scheduling

    It reports the job that should be done at each workIt reports the job that should be done at each work

    center and certain details about the routing of the part.center and certain details about the routing of the part.

    The dispatch list is generated each day or each shiftThe dispatch list is generated each day or each shift

    In an effective shop floor control system, documentsIn an effective shop floor control system, documents

    represents to the foreman or production supervisor therepresents to the foreman or production supervisor thebest way for accomplishing the master schedulebest way for accomplishing the master schedule

  • 8/7/2019 kishor dadmal sfcs

    10/21

    Order ProgressOrder Progress

    The order progress module is designed to accept dataThe order progress module is designed to accept data

    collected from the shop floor and to generate reports thatcollected from the shop floor and to generate reports that

    can be assist production management.can be assist production management.

    The various documents contained in the shop packetThe various documents contained in the shop packetprovide the means to identify the jobs.provide the means to identify the jobs.

    When a machine operator completes a particular processWhen a machine operator completes a particular process

    specified in the root sheet, relevant data to indicate thespecified in the root sheet, relevant data to indicate the

    completion are entered into the order progress module.completion are entered into the order progress module.

    The order progress module maintains a file of theThe order progress module maintains a file of the

    transactions reported on each of the uncompleted jobs.transactions reported on each of the uncompleted jobs.

  • 8/7/2019 kishor dadmal sfcs

    11/21

    Dispatch ListDispatch List

    WORKWORK

    ORDERORDER

    LOTLOT

    QUANTIQUANTI

    TYTY

    PRIORPRIOR

    WORKWORK

    CENTERCENTER

    NEXTNEXT

    WORKWORK

    CENTERCENTER

    STARTSTART

    DATEDATE

    DUEDUE

    DATEDATE

    REMAINREMAIN

    INGING

    HOURSHOURS

    15731573 2525 370370 400400 11--1414 11--2525 27.627.6

    16881688 300300 370370 400400 11--1414 11--2828 40.540.5

    16921692 107107 265265 375375 11--1717 11--3131 13.613.6

    16931693 1414 370370 342342 11--1717 22--44 12.012.0

    20532053 2727 240240 375375 11--2020 11--2828 16.216.2

  • 8/7/2019 kishor dadmal sfcs

    12/21

    Operations SchedulingOperations Scheduling

    The nature and importance of job shopsThe nature and importance of job shops

    JobJob--shop scheduling (shop scheduling (n jobs on one machinen jobs on one machine))

    ShopShop--floor controlfloor control

    Issues in scheduling service personnelIssues in scheduling service personnel

  • 8/7/2019 kishor dadmal sfcs

    13/21

    Principles of SchedulingPrinciples of Scheduling

    1. There is a direct equivalence between work flow1. There is a direct equivalence between work flow

    and cash flow.and cash flow.

    2. The effectiveness of any job shop should be2. The effectiveness of any job shop should bemeasured by speed of flow through the shop.measured by speed of flow through the shop.

    3. Schedule jobs as a string, with process steps3. Schedule jobs as a string, with process steps

    back to back.back to back.

    4. A job once started should not be interrupted.4. A job once started should not be interrupted.

  • 8/7/2019 kishor dadmal sfcs

    14/21

  • 8/7/2019 kishor dadmal sfcs

    15/21

    Principles of SchedulingPrinciples of Scheduling

    9. When seeking improvement in output, look for9. When seeking improvement in output, look for

    incompatibility between engineering design andincompatibility between engineering design and

    process execution.process execution.

    10. Certainty of standards, routings, and so forth is10. Certainty of standards, routings, and so forth is

    not possible in a job shop, but always worknot possible in a job shop, but always worktowards achieving it.towards achieving it.

  • 8/7/2019 kishor dadmal sfcs

    16/21

    Priority Rules for Job SequencingPriority Rules for Job Sequencing

    1. First1. First--come, firstcome, first--served (FCFS)served (FCFS)

    2. Shortest operating time2. Shortest operating time

    3. Earliest due date first3. Earliest due date first

    4. Earliest start date first (due date4. Earliest start date first (due date--lead time)lead time)

    5. Least slack time remaining first5. Least slack time remaining first

  • 8/7/2019 kishor dadmal sfcs

    17/21

    Priority Rules for Job SequencingPriority Rules for Job Sequencing

    6. Least slack time remaining (per operation as6. Least slack time remaining (per operation as

    opposed to per job) firstopposed to per job) first

    7. Smallest critical ratio first7. Smallest critical ratio first(due date(due date--current date)/(number of days remaining)current date)/(number of days remaining)

    8. Smallest queue ratio first8. Smallest queue ratio first

    (slack time remaining in schedule)/(planned remaining queue time)(slack time remaining in schedule)/(planned remaining queue time)

    9. Last come, first served9. Last come, first served

    10. Random order10. Random order

  • 8/7/2019 kishor dadmal sfcs

    18/21

    Job Sequencing ExampleJob Sequencing Example

    FirstFirst--Come FirstCome First--ServedServed

    Jobs (i order Processi g Due Date low Time

    of arrival) Time (days) (days e ce) (days)

    A 4 5 4

    B 7 10 11

    C 3 6 14

    D 1 4 15

    FCFS Schedule

    Late?

    On-Time?

    Orderssubmitted

    at beginning of week

    Jobs (i or er rocessi e te

    of rri l) i e ( s) ( s e ce)

    A 4 5

    B 7 10

    C 3 6

    D 1 4n-jobs on one machine

  • 8/7/2019 kishor dadmal sfcs

    19/21

    Job Sequencing ExampleJob Sequencing Example

    LastLast--Come FirstCome First--ServedServed

    Orderssubmitted

    at beginning of week

    Jobs (i or er rocessi e te

    of rri l) i e ( s) ( s e ce)

    A 4 5

    B 7 10

    C 3 6

    D 1 4n-jobs on one machine

    Last- ome First-Served Schedule

    Jobs (i order Processi g Due Date low Time

    of arrival) Time (days) (days e ce) (days)D 1 4 1

    C 3 6 4

    B 7 10 11

    A 4 5 15

    Late?

    On-Time?

  • 8/7/2019 kishor dadmal sfcs

    20/21

    Job Sequencing ExampleJob Sequencing Example

    Shortest Operating TimeShortest Operating Time

    Orderssubmitted

    at beginning of week

    Jobs (i or er rocessi e te

    of rri l) i e ( s) ( s e ce)

    A 4 5

    B 7 10

    C 3 6

    D 1 4

    Shortest Operating Time Schedule

    Jobs (i or er rocessi e te low i e

    of rri l) i e ( s) ( s e ce) ( s)

    D 1 4 1

    C 3 6 4

    A 4 5 8

    B 7 10 15

    Late?

    On-Time?

    n-jobs on one machine

  • 8/7/2019 kishor dadmal sfcs

    21/21

    Job Sequencing ExampleJob Sequencing Example

    Earliest Due Date FirstEarliest Due Date First

    Orderssubmitted

    at beginning of week

    Jobs (i or er rocessi e te

    of rri l) i e ( s) ( s e ce)

    A 4 5

    B 7 10

    C 3 6

    D 1 4

    Earliest Due Date First

    Jobs (i or er rocessi e te Flow i e

    of rri l) i e ( s) ( s e ce) ( s)D 1 4 1

    A 4 5 5

    C 3 6 8

    B 7 10 15

    Late?

    On-Time?

    n-jobs on one machine