    Knowledge of boiler factory pipeline,and Method of use

    China - central Asian gas pipeline on the right bank of the amu darya from turkmenistan and

    uzbekistan border, the central and southern kazakhstan, uzbekistan, entering China from ala

    shan kou to become "the second line of west-east gas". Pipeline total length of ten thousand km,

    including 188 km long in turkmenistan, uzbekistan is 530 kilometers long, kazakhstan 1300 km

    long, about 8000 km in the rest of China. Pipeline AB double wire laying, single line 1833

    kilometers long, is the world's longest gas pipeline.

    China - central Asian gas pipe line in early December 2009 A trial shipment to production. B line,

    will finish all the welding work at the end of 2009, is expected in 2010, 4, 5 months to achieve

    ventilation. Project fully completed, after 30 years of operation, stable conveying from central Asia

    to China each year about 30 billion cubic meters of natural gas, equivalent to about half of the

    domestic natural gas production in China in 2007.

    Edit this section

    Paragraphs of

    The territory of China

    Turkmenistan gas through the pipeline after entering China, and at the same time the construction

    of the second line of west-east gas cohesion, the total length of more than 10000 kilometers, is by

    far the world's longest gas artery. In the second line of west-east gas in our country the first stop

    for xinjiang huoerguos, through xinjiang, hubei, zhejiang and other provinces, the east arrived in

    Shanghai, arrived in guangzhou to the south, and finally arrived in Hong Kong, for China's

    economic and social development and people's life more clean and efficient natural gas resources

    in [1].

    Central Asian gas pipeline pipe route mapCentral Asia - China gas pipeline is composed of Petroleum & Natural Gas pipeline phase I and

    phase ii project. Issue the uzbek side of the border, starting point is located in the soil and soil

    within the territory of the proposed export natural gas pipeline (2) cohesion, receive from

    turkmenistan 300 x 10 ^ 8 m ^ 3 / a gas; Phase ii starting point is located in the territory of

    kazakhstan has built QiZhan - say goodbye to central Asia pipeline of the central government in

    accordance with the USA's pressure, and the pressure QiZhan pipeline connection, receive from

    kazakhstan 100 x 10 ^ 8 m ^ 3 / a gas. From two directions of pipeline in kazakhstan's Kent

    rendezvous, northwest finally arrived in China's western border port huoerguos. Pipe lines a total

    length of 3298 km, of which the line length of 525 km within the territory of uzbekistan, kazakhstan

    line length of 2773 km.

    Within the territory of kazakhstan

    Total length of 1293 km, of which the black border - qi, in line with line's Kent - odd Kent gas pipe

    laying, through tin along the river, the town, Barrett, even Mr Stowe don't strange, Kent, this

    section of the line length of 337 km. Strange, Kent - almaty (uzbek, ghazi) line up the odd, kelly

    Kent kuyt town I breathe meeting, laying line road, along the way by wan's card, tara, lugo and,

    chu, Mr Mittal, almaty uzbek naga, this section of the line length of 596 km. Almaty (uzbek, ghazi)

    - huoerguos pipeline from almaty uzbek naga qi xiangdong, laying along the way by don't lick,

    barr kinnock, akshay, lick, Ryan, across a big river in ili river, after the town of PanFeiLuoFu

    huoerguos port terminal, this line is 360 km long.

    Within the territory of uzbekistan

    http://www.bohaihip.com/http://www.bohaihip.com/
  • 7/27/2019 Knowledge of Boiler Factory Pipelineand Method of Use1213scribd

    2/2

    East west high low, terrain along pipeline is Flanges given priority to with plains, desert terrain,

    relief, local area for hills, plains of the proportion is 79.1%, the hills the proportion is 20.9%. Soil

    wu border points - na [karsh library cloth division north line is 415 km long, for the desert plain

    terrain, surface soil salinization phenomenon. Cloth division north, [karsh library - the black border

    line is 110 km long, low to high terrain, concomitant with this odd mu Kent in the pipeline on both

    sides of desertification is serious, pipeline partner on the road covered by dunes, poor traffic

    conditions. About the seismic fortification intensity according to the Russian state standard pipe

    laying area is divided into 7 to 9 degrees, the specific distribution is not provided.