EQUIPMENT CLIENT: SITE: AMOUNT: START DATE CAMPAIGN: END DATE CAMPAIGN: OPERATIONAL DAYS: SCOPE OF WORKS: Dredging International Control y Prospecciones IGEOTEST S.L has been contracted by DREDGING INTERNATIONAL to carry out a geotechnical survey in Kuwait for the new refinery project. The site location is proposed at the west side of the Al-Zour Power Plant and the south west end of the Texaco Oil Facilities. In the south we find the Al Khiran Pearl City. To allow construction of the plant, a total of 70 million m_ of sand needs to be dredged and reclaimed. For this a sand search campaign has been set up as part of a SIB. This comprises seabed surficial boreholes executed with a Seabed Minidrill. MINIDRILL MDS-6000 Dimensions: 7510x2400x2350 (l x w x h) Surface weight: 5600 kg Sampler Diameter (mm): 120 int./146 ext . Sampler length (m): 6,0 m Max. water depth: 300 m Thrust capacity: 35 kN Electrical power: 15kw/400V Refrigeration pump 60l/min - 50 bar Drilling tool:bit widia SEA WAVE TYPE: offshore tug / supply ship SIZE: 61 x 12 m DRAUGHT: 4,90 m 30/08/2013 10 Days 24/09/2013 The total geotechnical surveys was performed in 30 days with the Prepaparation phase, Mobilization phase, Survey performace phase offshore (geotechnical) and data procesing phase and the interpretation and reporting phase. MARINE SPREADS Al Zour - Kuwait 217,000.00 € KNPC New Refinery Project Al Zour

Upload: others

Post on 13-May-2020

35 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: KNPC New Refinery Project Al Zour - Igeotest · KNPC New Refinery Project Al Zour. Title: 2013.019 QI Kuwait Dredging Author: salvi Created Date: 20140324145043Z

06/01/14

2,200,000.00€

21/10/12

Vigo-España

EQUIPMENT

CLIENT:

SITE:

AMOUNT:

START DATE CAMPAIGN:

END DATE CAMPAIGN:

OPERATIONAL DAYS:

SCOPE OF WORKS:

Geophysicalsurveyusingthefollowingequipment:

-BathymetryMultibea-Sidescansonar.-Sub-bottomprofiler.Pinger.-Seismichighandlowresolution.-Magnetometryhighresolution.

Geotechnicalsurvey:

2boreholeusingdrillrigandcontinoussamplingupto30mbsf.

2CPTUindown-the-holeupto30mbsf.

DredgingInternational

ControlyProspeccionesIGEOTESTS.LhasbeencontractedbyDREDGINGINTERNATIONALtocarryoutageotechnicalsurveyinKuwaitforthenewrefineryproject.ThesitelocationisproposedatthewestsideoftheAl-ZourPowerPlantandthesouthwestendoftheTexacoOilFacilities.InthesouthwefindtheAlKhiranPearlCity.Toallowconstructionoftheplant,atotalof70millionm_ofsandneedstobedredgedandreclaimed.ForthisasandsearchcampaignhasbeensetupaspartofaSIB.ThiscomprisesseabedsurficialboreholesexecutedwithaSeabedMinidrill.

•1sondeotestificaciónhasta15m(instalaciondepiezom.yarqueta)•3sondeosatestificaciónhasta5m

MINIDRILL MDS-6000Dimensions: 7510x2400x2350 (l x w x h)Surface weight: 5600 kgSampler Diameter (mm): 120 int./146 ext .Sampler length (m): 6,0 mMax. water depth: 300 mThrust capacity: 35 kNElectrical power: 15kw/400VRefrigeration pump 60l/min - 50 barDrilling tool:bit widia

Totalde27presiómetrosentierra

Campañageotécnicamarinaconsistenteenlarealizaciónde:

SEA WAVETYPE: offshore tug / supply shipSIZE: 61 x 12 mDRAUGHT: 4,90 m

•8sondeosdestructivosc/presiómetroc/1,5m(endossondeoscaladode5m)hastacota-30m.Totalde108presiómetrosenmar

*Sondeosdestructivosconregistrodeparámetros*Detectarinstalacionesenterradas*30mldetuberiapiezométricay2arquetas.

30/08/2013

10Days

24/09/2013

Thetotalgeotechnicalsurveyswasperformedin30dayswiththePrepaparationphase,Mobilizationphase,Surveyperformacephaseoffshore(geotechnical)anddataprocesingphaseandtheinterpretationandreportingphase.

MARINE SPREADS

AlZour-Kuwait

217,000.00€

KNPC New Refinery Project Al Zour