    STUDENTS NAME: ABHIRUP BHATTACHARYA

    PROJECT TITLE: 5S IMPLEMENTATION IN STORES AND CUTTING SECTION

    Project Guide: Mr.B.Banerjee

    Background: The 5S technique is implemented in Velocity Apparelz Company (ESC), an 100 % export oriented garment

    manufacturing facility located in Egypt. It was felt necessary to select the required areas, which form the initial part in the process flow.

    This is highly important as it sets the proper tone for implementation, as it can be used to streamline the process flow and helps in easy

    trackingof the objects.

    Objective: To successfully implement 5s and achieve a visually organized workplace.

    Methodology : Based on questionnaires and personal observations and suggestions & improvements.

    Findings: Checklist to ascertain 5S condition prepared and audit being done after implementation fetching good score. SOP prepared

    and some tools were modified.

    Conclusion: The project helped me face the practical challenges of 5S implementation and brought a greater practical insight about its

    relevance in the industry.

  • 8/4/2019 Kolkatta 2009 B.F

    2/30

    STUDENTS NAME: ABHISHEK KUMAR, MANISH RAJ GUNJAN & BIRJU MURMU

    Project Title: AUDIO-VISUAL Operator Training Module

    Project Guide: Mr.S.S.Ray

    Background: There exists a scope of visual learning in Apparel Manufacturing Technology education. Visual learning is always better

    than learning from books. Moreover, an operator training method based on visual learning may be more beneficial as the operator can

    see the method of performing an operationagain and again without actually wasting the raw materials required for demonstration

    Objective: To development the training material for the sewing operators of the knitwear industry and convert it into audio-visual

    mode.

    Methodology: Identify what learners want or need to know and decide what type of training can meet their learning needs. Plan the

    training so that learning is likely to take place.

    Deliver the training so that the learning does take place. Evaluate the training so that there is evidence that learning has taken place.

    Findings: Audio- visual training module prepared for operators, delivered and evaluated.

    Conclusion: The training module was completed and will now be changed into flash version with local language voice over.

  • 8/4/2019 Kolkatta 2009 B.F

    3/30

    STUDENTS NAME: AKASH MITRA & RAHUL SINGH

    Project Title: Study of Production system for implementation of Quick Response

    Project Guide: Prof.T.Bhattacharya

    Background: The project was undertaken to determine the structure and the operational production/ inventory policies of apparel

    supply system suited best to support rapid replenishment to retail in order to maximize performance.

    Objective: Objective is to cut lead times- for the time-to market is very low in this case-this could be achieved by enhancing

    information- flow by installing a seamless system

    Methodology: Study of various production systems.

    Study of role QRM methodology.

    Study of Product characteristics and demand uncertainty.

    Evaluating various manufacturing systems.Comparison of various manufacturing system w.r.t. to QRM

    Proposed new production system which is a hybrid of UPS & MODULAR.

    Findings: Analysis of QRM, UPS, PBS, SKU showed QRM is best suited.

    Conclusion: It has been found out by us during this research work that among the three Production systems, modular has the best

    advantage over the other two production systems in QRM implementation.

  • 8/4/2019 Kolkatta 2009 B.F

    4/30

    STUDENTS NAME :ALARI BRAHMA & ANKITA SAHAY

    Project Title: To develop a Quality Manual & Comprehensive Quality system

    Project Guide: S.S.Ray

    Background: A retail house catering to the premium market should have procedures in line with the companys standards for meeting

    customers satisfaction. The standards and specifications set should not depend on the in-house or out-sourced manufacturing for a

    consistency in the final merchandise. Thus the project was framed to develop a standard quality manual.

    Objective:To develop a comprehensive quality bible aiming at product integrity and overall consistency in all operations.

    Methodology: Based on the study of the existing

    Methods & acting on the difference to achieve the ideal procedures for a zero defect merchandise.

    Findings:Quality manual developed featuring Product Quality Rating System (PQRS), Defect Library, Quality Index, o AQL, Zero Re-Work.

    Conclusion: This manual will act as a guideline for all QA Personnel, Garment Vendors & other concerned heads to understand

    companys standard in line with customers standard in line with customers expectations.

  • 8/4/2019 Kolkatta 2009 B.F

    5/30

    STUDENTS NAME: AMIT RANJAN PRASAD & GAURAV KUMAR

    Project Title: 2 in 1 presser foot for single needle flat bed

    Project Guide:Mr.S.S.Ray & Prof. B.Banerjee

    Background: From previous studies it was observed that there is a unique problem regarding use of single presser foot in the assembly

    line production. Whenever it was needed for attaching the concealed zipper or attaching the piping, the bundle was directed to that

    particular machine consuming a lot of time as well as breaking the co-ordination of production. Keeping these elements into

    consideration the project of making 2-in-1 presser foot was designed which can solve this problem to some extent.

    Objective:To make a 2-in-1 presser foot which can be used like the single (right or left) presser foot and also like the normal foot.

    Methodology: The proposed mechanics of the presser foot to be made is the basic hinge system followed by the spring system to

    support the rigid position of presser foot. The presser foot must not move even a little or vibrate when either side of the shank is lifted

    for the use single presser foot.

    Findings: The 2 in 1 presser foot for single needle flat bed developed & total cost amounts to Rs.294.50/- beneficial for sampling

    department and time saving.

    Conclusion: The presser foot made is very significant to the garment industry as it will not only help to save the time of many

    operations but also help to assemble those machines which are dedicated to the operation made by the single foot, to the main line

    assemble.

  • 8/4/2019 Kolkatta 2009 B.F

    6/30

    STUDENTS NAME: ANANT BIBHORE & RAVI BHUSAN SHARMA

    Project Title: Flat bed attachment for feed off-the arm

    Project Guide:Mr.B.Agrawal & Mr.Sandip Mukherjee

    Background: Sampling room activities for small manufacturers can not afford specialized machines. The use of limited machines

    dynamically to rapidly changing styles by some small and cost effective modifications was felt necessary. Thus the attachment was

    developed in the project work aims to provide multiple uses of FOA as DNCS/SNCS in sampling activities with minimum installation

    time.

    Objective: To develop an attachment for feed off-the arm sewing machine that converts it into a flat bed double needle chain stitch

    machine which can be used in sampling rooms. The attachment developed should be :

    i) Easy to install and remove

    ii) Provides flat bed for stitch non-tubular seams thereby increasing utility of FOA in cases of idle times.

    iii) Save on the cost of investment for DNCS/SNCS wherever possible

    Methodology:Information on feed off-the arm and dncs, conceptual designing of the product, material study and selection, functional

    designing, product development, product testing, scope of implementation and limitations.

    Findings: Attachment can be assembled and removed from the machine in 10 minutes and 8 minutes respectively.

    Cost saving : Rs 33000/-

    Space savings : 398 sq.in.

    Conclusion: The study resulted in development of a fully functional flat bed attachment for feed-off-the arm sewing machine.

  • 8/4/2019 Kolkatta 2009 B.F

    7/30

    STUDENTS NAME: ARCHIT MISHRA, PRANAV KUMAR & VIRENDERA

    Project Title: Finishing of Cotton based Garments with Acrylic Acid in Absence of Phosphorus based catalyst

    Project Guide: Dr.Debasish Das, Mr.Bikas Agrawal

    Background: Finishing of cotton using resins from methylolated urea derivatives such as DMDHEU results in some disadvantages in

    respect of formaldehyde splitting during processing and use endangering the health of processors and users. Use of poly

    (polycarboxylic acid) such as Butance Tetracarboxylic acid and Cyclopentane Tetracarboxylic acid etc. as substitude finishing agents

    appears to be much more prospective in this respect. But they are prohibitively expensive and their application is associated with use of

    phosphorous based catalyst which again has environmental problem.

    Objective: To improve wrinkle recovery of cotton based garments by applying acrylic acid as formaldehyde-free chemical agent in

    presence of combinations of either of

    1. K2S208 and sodium format as catalyst

    2. K2S208 and sodium citrate as catalyst

    Methodology:Cotton based garment duly manufactured by us will be finished with acrylic acid in presence of K2S2O8 and some

    Organic acid following dip-spin-tumble dry-iron-cure technique and attainable changes in the properties of garment including wrinkle

    recovery, strength etc were assessed.

    Findings:Application of 8% AA in presence of 0.5% K2S208, 6% Sodium citrate produced improvements in tensile strength, tear

    strength, flexibility, MR% for substantial improvement in wrinkle recovery comparable to that obtained in DMDHEU finish.

    Conclusion: Acrylic Acid finish was found to bring improvement in WRA, retaining the other physical properties.

  • 8/4/2019 Kolkatta 2009 B.F

    8/30

    STUDENTS NAME: CHANDAN KUMAR & SWAGAT DAS

    Project Title: Implementation of Lean in Finishing

    Project Guide: Mr.D.Das

    Background: Garment Industries is facing a challenge in international market to respond to speed and quick changes in accordance

    with the demand of the consumer. The project was conducted at TCNS Ltd. It has identifiable waste (non value added activity) in

    accordancewith the definition of lean which if removed will reduce the production cost.

    Objective:To apply some of the concepts of lean manufacturing in the organization to eliminate waste assessed in respect of non value

    added activity in the finishing that would lead to lowering of cost per unit of the item produced.

    Methodology:Studying the entire finishing floor and the existing system. Short-listing the faults in the system and highlighting the

    areas where improvement can be done.

    Findings:Lean manufacturing, 5s, visual control, productivity implemented in the finishing department of the garment industry.

    Conclusion: A systematic approach to identifying and eliminating waste (non-value added activities) through continues improvement

    by flowing the product at the pull of customer in pursuit of perfection.

  • 8/4/2019 Kolkatta 2009 B.F

    9/30

    STUDENTS NAME: DEEPIKA RAJ & KRITI SISODIA

    Project Title: Implementation of Plan Do-Check-Act Cycle.

    Project Guide: Prof.B.Banerjee

    Background: The project was conducted at Alok Industry Ltd Garments made up at Silvassa. While having an overview of the

    organization, the areas where long term improvement was needed in fabric store and quality assurance. The unit being new and due to

    change in the management time and again, the identified areas were highly unorganized and PDCA method was desirable to implement

    to streamline the process.

    Objective:Improve the quality system and hence, move towards perfection

    Methodology:PDCA cycle is a continuous improvement cycle. It targets specific problems and provides solutions. The performances

    are tested from time to time and changes are made to achieve the desired result.

    Findings:Quality training module developed, questionnaire prepared, rating of the quality checkers made, analyzed and training

    session conducted. Significant amount of decrease in number of defects found in the end line inspection in the month of April.

    Conclusion: Positive change in the quality assurance system of Alok Industries Ltd. Garments & made up div.

  • 8/4/2019 Kolkatta 2009 B.F

    10/30

    STUDENTS NAME: GARGI BHADURI & SAHELI GOSWAMI

    Project Title: Applicability of CRM for Benetton India Pvt.

    Project Guide:Prof.T.Bhattacharyya

    Background: The CRM programme undertaken previously at Benetton India Pvt. Ltd. was disorganized, and the satisfaction level of

    the customers was low. The need was felt to improve the CRM programme and make it integrated. The project aimed at studying the

    appropriateness of the existing CRM programme and to incorporate changes required.

    Objective:The objective of the project was to develop more profitable relationships with customers and having a 360 degree view of

    the customer helped. This meant that all touch points-salesperson, call centre agent, field service personnel must have access to the

    right information to enable them to interact effectively with the customer, whatever the preferred mode of communication-face-to face,

    phone, fax or email.

    Methodology:The first step was learning theories, research works, and ideal conditions, rules about the CRM. The next part wasmodifying the existing CRM programs keeping in mind the ones used by competitions and considering customers views. Then came

    the implementation of suggestions and improvements of the program at the personnel and software level and evaluating the changes

    and their fetched results last part was incorporating the changed frame of CRM into system and getting people adapted to them and

    tracking down the further problems.

    Findings:Changes were made in the store ambience, loyalty promotion scheme, customer feedback book. An online link was created

    for enrollment of new members. A user interface was created for members to check individual account status.

    Conclusion: Several changes were incorporated starting from the shop floor, the personnel, the policies and even to the software. Theaim was to retain best customers, converting good customers into high profit earning customers and dealing with unprofitable

    customer.

  • 8/4/2019 Kolkatta 2009 B.F

    11/30

    STUDENTS NAME: GUNJAN KUMARI & RAVI KRISHNA PRAKASH

    Project Title: Kaizen an Approach towards value loss analysis

    Project Guide: Prof. B.Banerjee

    Background: The challenge of globalization has magnified the economy of most of the developed and developing nations. The

    business has become more competitive and the requirement to improve the quality and productivity is one of the highest priorities.

    Thus the Kaizen approach was selected for the current project which can indeed achieve and develop an organized work place to attain

    the best market result.

    Objective:With the Kaizen the goals are different. Naturally one tries to optimize the profit.

    This is possible however only with high customer satisfaction, since customer production is more expensive than customer connection.

    In order to ensure customer satisfaction, three factors are the center of attention: Reduction of costs, Quality assurance and speed.

    Methodology:Related articles, case studies etc., Books, Internet Sources, Companies internal experts, Different reports generated bythe company, Observations derived from practical examination of fabric floor, Charts generated by analysis of secondary data, Touch

    History Analysis.

    Findings:In fabric store there is 52.3% reduced material flow and 7.6% increase in storage capacity

    In cutting cost saving made due to elimination of end pieces % and in re-layering. Splicing method introduced to eliminate end pieces.

    Conclusion: The project successfully fulfilled its aim of eliminating waste, by resulting in reduced cost in terms of 3 Ms of the

    organization, material, manpower and money. The project looked at quality and time taken within the framework of the organizations

    existing processes, seeking to enhance these processes to achieve incremental improvement.

  • 8/4/2019 Kolkatta 2009 B.F

    12/30

    STUDENTS NAME: NISHANT KUMAR & VIVEK RAWAT

    Project Title: Development of Sale and Inventory Management software.

    Project Guide: Prof.B.Kaur

    Background: The project is software which can keep records of all the items present in a shopping mall. There is a separate account

    for the administrator of the information system who can insert, update or delete any record according to his/her choice maintaining

    some basic rules whereas the seller can only sell an item by providing the Item No. of the corresponding item. The actual price of the

    item will be calculated automatically by calculating the unit price and discount on the item and the number of item to be sold and the

    final bill will be printed.

    Objective: To study the existing Sale and inventory Management software.

    To analysis of Industry demand

    Selection of right options for small retail store.

    Methodology:Study of Existing Sale and inventory Management software was done.

    Selection of right options for small retail store were analysed.

    Effort to make the software economical.

    Selection of platform independent front end i.e.Java and MS-Access as back end.

    Findings:Retail Store, Sale Software, Bill, Retail Invoice, Inventory management, Vendor Details, Re-order Point.

    Conclusion:We are planning to install our softwares in a Delhi based retail setup which is expected to run successfully. It is expected

    to have an increase in sales, easier inventory handling and reduction in inventory carrying cost in this small span.

  • 8/4/2019 Kolkatta 2009 B.F

    13/30

    STUDENTS NAME:RAJKAMAL CHAUHAN & KAJAL KIRAN TOPPO

    Project Title: Enhancing Productivity by Reducing Lead time

    Project Guide: Mr.B.Agrawal

    Background: In a world where timeline is everything, on-time delivery becomes a critical component of each success story to meet the

    customers requirement. The Indian garment industry has a major problem for exports in the recent economical scenario. So the project

    work carried out in Kandhan Knits, was intended to analyse the lead time and try to find out where the waste exists so that it can be

    eliminated.

    Objective:To be able to understand the delays and its causes and propose a system by which delays can be cushioned

    Methodology:Finding the third kind of activities which is delaying the process in every department of the industry and eliminating

    those kinds of activities within the available resources.

    Findings:Reducing lead time by 3.53 days in cutting and sewing section. Average time delay per style due to waiting for cut pieces is

    reduced by 192.5 mins.

    Conclusion: Almost in every garment industry they are facing the problem of late deliveries of goods. By reducing lead time we save

    time in a particular order and can deliver the goods few days earlier which also saves inventory cost and all other overhead expenses.

  • 8/4/2019 Kolkatta 2009 B.F

    14/30

    STUDENTS NAME: RANAJN PRIYADARSHI

    Project Title: Costing strategy in weak Economy

    Project Guide: Prof.B.Banerjee

    Background: Cost estimation is an important part of product development. The companies which are working as sub contractor of

    organizational companies, cost estimation is basically an agreement between the manufacturer and the customer. The programme was

    prepared as a web application with the aim of wide access to any necessary product information by manufacturers and customers.

    Objective:To develop an alternative solution of costing with extrapolation of the existing methods and detailed analysis of the working

    procedure to help Atraco combat with the existing weak order flow.

    Methodology:Extrapolation of the existing working system keeping in mind the changes going to incur and also without a great

    amount of monetary loss. To develop an alternative costing sheet which can provide a better way to meet the targets.

    Findings: A new way of calculating costs was developed which enabled to manage the order flow at lower margins and quote the best

    prices. Since Bangladesh is the biggest threat, this approach helped Atraco to quote at the prices slightly lower than the target price of

    Bangladesh.

    Conclusion: Several changes in the costing sheet helped to get orders of around 25,0000 pcs for the new season even in this holocaust

    situation.

  • 8/4/2019 Kolkatta 2009 B.F

    15/30

    STUDENTS NAME:SAGORIKA SARKAR & SAURABH KUMAR

    Project Title: Apparel Sarwasva

    Project Guide: Mr.J.P.Behera

    Background: In internet world, its not easy in a single website to find out the entire requirements of a garment industry in terms of the

    machinery available in the market that is used for apparel manufacturing and who provides them.

    Objective:To provide the user with a base to find out the requirements of a garment industry in terms of the machinery available in the

    market that is used for apparel manufacturing and who provides them. To help the user identify his own requirements and find out ways

    to satisfy them.

    Methodology:Gather information about the machinery requirements in the apparel industry. Tabulate the arrange the data collected and

    plan the path and method for data flow

    Decide on the software and install it to develop the web pages and Configure the server to execute dynamic WebPages andLink the web pages to form the website.

    Findings:Garment industry, Garment machinery, Garment industry software solution.

    Conclusion: This project has been developed keeping in mind, the day to day needs of the apparel professionals and I hope that it

    would serve the very purpose it has been created for.

  • 8/4/2019 Kolkatta 2009 B.F

    16/30

    STUDENTS NAME: SAMIR LAKRA & ABHINAV KRISHNA

    Project Title: Development of a sewing guide for buttonhole machine for placket, Fly and cuff.

    Project Guide:Mr.Bikas Agrawal and Mr.Sandip Mukherjee

    Background: In the present scenario of economic crisis the industry is keen to cut the production cost. The cost of labour constitutes amajor part. In order to rationalize the labour cost and increase the workers efficiency ergonomically the device is developed which

    eliminates the marking procedure for buttonholes.

    Objective:Reducing the no. of labours in the line because labour is getting costlier than ever.

    Methodology: Listing out all the available options and choose the best of them. Make proper use of it and customize it for a special

    purpose.

    Findings:Reduction of material wastage, DHU and throughput time. Improved cycle time of button hole stitching and getting the stitchright at the first time. 754 pieces can be produced extra by reducing the total time.

    Conclusion: This sewing guide can save the labor force and decrease the throughput time thereby increasing production and saving

    cost.

  • 8/4/2019 Kolkatta 2009 B.F

    17/30

    STUDENTS NAME: SHWETA NAWANI

    Project Title: Business Improvement Plan

    Project Guide: Mr.Amitava Choudhury

    Background: In these times of global melt down and rising retail space rentals, it is very important to reap the optimum benefits out ofretail space rentals by maximizing space efficiency. This project focuses on reaping the maximum benefits out of the retail space and

    helps pinpoint the exact brands in MBOs that are not performing well.

    Objective:To identify brands/Lobs falling under the Benchmark by calculating return per square foot and recommending a business

    improvement plan.

    Methodology:Based on data obtained from SAP reports and interviews.

    Findings:A business improvement plan was developed based on the return per square foot, sales per square foot. Based on thisparameters bench marks was created and space efficiency and brand performance was studied.

    Conclusion: This project helps analyze brands/LoBs to identify under-performers and suggests strategies to bring them above the

    benchmark.

  • 8/4/2019 Kolkatta 2009 B.F

    18/30

    STUDENTS NAME: ABHISHEK KUMAR JHA & PRAFULLA KR. RAJU

    Project Title: Development of Integrated software of sales forecasting

    Project Guide:Mr.J.P.Behera and Mr.Amitava Choudhury

    Background: The need for predicting the sales of a store and its merchandising planning are very important for a store for its retailgrowth and to effectively manage the store resources. Big retail store have forecasting and merchandising software but they are

    expensive which the smaller stores cannot achieve. So, the project was taken up to develop a forecasting and merchandising software

    for small retailers.

    Objective:The project software developed was named MERCHANT++. It would help retailers to grow by forecasting their sales &

    managing their merchandising budget by using 6 month merchandising tool. It would help retail stores to determine their planned sales,

    BOM stock, retail reductions, purchases at cost, purchases at retail, markup, and gross margin

    Methodology:Market Survey of proposed softwareStudy of 6-month merchandising tool

    Comparative study of forecasting models

    Software Development

    Findings: A Sales forecasting and merchandising software was developed which would enable the small retailers to plan sales and

    merchandising plan enabling them to purchase at lower cost and improve the gross margin.

    Conclusion: Merchant++, software developed was praised by PARICHAY. But, to make it fully commercial more features need to be

    added. This will take more time & effort.

  • 8/4/2019 Kolkatta 2009 B.F

    19/30

    STUDENTS NAME: AMIT PRAMANIK & ANAMITRA DAS

    Project Title: Pre Production Planning & scheduling software for easy production

    Project Guide:Mr.J.P.Behera

    Background: In Apparel Industry handles huge variety of work orders and they follow different types of operations, so it is requireplanning them in different process and determining the resource require handling that order. For the manufacturing it is difficult to find

    out proper process which is to be followed in the production floor and there have to maintain lots of paper work for production

    planning.

    Objective:To successfully develop and implement the software in production department so as to smoothen the process and also to

    improve the order handling

    Methodology:Studying the various production related activities and taking the base datas such as time and motion study of each

    operation and developing the process flow.

    Findings:Standard Minute Value, Operator efficiency, Thread consumption, Order analysis, Garment breakdown.

    Conclusion: The project helped in understanding the various production related activities and also gave a brief knowledge in software

    developing. The software is base for production and will form a support in line balancing, calculating thread consumption, and

    identifying bottlenecks.

  • 8/4/2019 Kolkatta 2009 B.F

    20/30

    STUDENTS NAME: ANTAR DUTTA

    Project Title: Lean Manufacturing Implementation

    Project Guide:Mr.S.Mukherjee

    Background: The project is conducted in M/S Arvind Limited, Knits Garment Divison, Ahmedabad with a vision of minimizing thenon value adding activities and create a visually organized workplace by implementing some tools of Lean manufacturing techniques.

    After a thorough brainstorming it was felt that inspite of their technical skills and motivation they are blinded to some of the wasteful

    activities owing to their normal routine work pressurewhich need to be rectified.

    Objective:To successfully implement Lean Production System and achieve better work system and an organized workplace.

    Methodology: Identification of the major problematic areas, developing an action plan, Value stream mapping of the existing system

    and implementation of Lean tools.

    Findings:Value Stream Mapping done, non value adding activities identified and corrective measures suggested, 5s techniques being

    implemented. Average daily production was increased by 12.22%, and missing % reduced from 3% to 1.04% after Kanban.

    Conclusion: Lean Manufacturing tools were implemented successfully but not in all the departments due to time constraint. The

    research work helped me to get a thorough practical insight about its relevance in the apparel industry.

  • 8/4/2019 Kolkatta 2009 B.F

    21/30

    STUDENTS NAME: ANUPAMA ABHILASHA LAKRA AND POOJA KUMARI

    Project Title: Implementation of Statistical Process Control

    Project Guide:Mr.B.Banerjee

    Background: Reducing costs by minimizing scrap and rework is the main goal of using tools of SPC for quality control andimprovement. This is achieved by finding out what a process produces compared to what a product specification are, and then driving

    improvements to the process. It also analyse the process capabilities. With these views the project is undertaken to reduce rework in the

    sewing department by implementing SPC techniques in AMS FASHION-1.

    Objective: To reduce rework/repair level in the sewing department.

    Methodology: Based on data collection and analysis from sewing floor

    Findings:Absenteeism was found to be the root cause for higher defect rate in the sewing floor. After improvement in house keepingthe absenteeism percentage is reduced from 23.1% to 13.37%.

    Conclusion: The purpose of this project lies in lean manufacturing with primary focus on cost cutting by making a visually organized

    workplace reducing absentism of operators.

  • 8/4/2019 Kolkatta 2009 B.F

    22/30

    STUDENTS NAME: BIBHUTI BHUSHAN DAS & NACHIKETA

    Project Title: Process Re-Engineering in sewing basic five pocket jeans

    Project Guide: Mr.S.S.Ray & Mr.B.Banerjee

    Background: The project focuses on reduction of the throughput time in the sewing floor by reducing unnecessary non value addedactivities happening in the sewing floor to increase the overall productivity in Arvind Mills Limited. Since there is a huge deviation

    occurring in the sewing floor between the planned production and actual output it was felt necessary to conduct the project in order to

    re-engineer the present process by mapping the exact areas of the delays in the sewing floor to meet customer demands.

    Objective:To reduce the throughput time and delays occurring in assembly line production of basic five pocket jeans

    Methodology:Analyzing current situation of the sewing floor for the huge deviations between the planned and actual and know-how of

    the unnecessary delays happening in the sewing line. Reducing throughput time of the sewing line and propose solutions to reduce

    unnecessary delays using some of the lean tools.

    Findings: Causes of non value adding activities and idle time breakup identified. Throughput time reduced by 30 mins by changing

    machine lay out.

    Conclusion: Reducing the throughput time and the unnecessary delays leads to a reduced WIP in the sewing floor leading to meet

    customer demands in a more effective manner.

  • 8/4/2019 Kolkatta 2009 B.F

    23/30

    STUDENTS NAME: BINAMRA PAUL SOY

    Project Title: Reducing the delays in the Pre-Production activities

    Project Guide:Mr.Bikas Agrawal

    Background: It is important to note that the pre-production process networks are unique for every single enterprise., every singlebuyer and even for every single order. In the absence of a standardized pre-production process network, elimination, concurrence and

    integration approach will be too specific to be applicable across industry. Based on this the project is undertaken to explore generalized

    or standardizedsolutions/techniques that can be applied.

    Objective:To successfully trace out the reasons of delays in the pre-production activities, and finding solutions to these problems.

    Methodology:Detailed study of the department concerned with the pre-production activities, personal observations, questionnaire and

    interviews.

    Findings:Pre-production activities sheet developed for different lead time category and a master sheet was developed for PPC

    department for auto generation of planned dates.

    Conclusion: This project helped to face the practical challenges in the industry and gave me a deeper insight of the complete business

    process.

  • 8/4/2019 Kolkatta 2009 B.F

    24/30

    STUDENTS NAME: DEBANJAN DAS & VINOD KUMAR

    Project Title: Use of statistical quality control tools for quality improvement

    Project Guide: Mr.S.Mukherjee

    Background: In the present global market certain aspects like quality assurance that are essential ingredients in the manufacture ofapparel are taken for granted. Thus it was felt to effectively start a quality assurance program to have a good mix of internal efforts as

    well as outsourcing some of the inspection and testing activities in order to strengthen the existing quality system in the particular

    Organisation (Kandhan knits). In order to control the defects it is important to identify their root cause and find a measure for their

    rectification.

    Objective:To improve the quality by using statistical quality control tools so as to identify the cause of defect formation and to find

    suitable solutions to eradicate them through process improvement

    Methodology: Study of the present system Using SQC Tools to identify the cause of the AnomaliesImplementing Process changes to Eradicate the anomalies

    Studying the implemented process & using SQC tools to identify any further anomalies. To lay down guidelines to

    prevent any further deviations from formation.

    Findings:Inline inspection reduced the rework formation from 30% to 12%. After print and embroidery checking the rejection rate is

    reduced from 8% to 4.2%. The excess percentage was also reduced to 8%.

    Conclusion: The quality was improved but along with it the production rate was also increased due to reduction in reworks. Moreover

    various key areas were identified for quality improvement using SQC tools and also process changes implemented.

  • 8/4/2019 Kolkatta 2009 B.F

    25/30

    STUDENTS NAME: NISHANT RAI & PAWAN KR. MISHRA

    Project Title: Indigenous trimmer for SNLS Machine

    Project Guide:Mr.B.Banerjee & Mr.S.SRay

    Background: Operators working on the sewing floor use hand trimmers or scissors for the purpose of thread trimming. The operatorhas to reach out for cutting device, make the cut and then place it back to its initial position which is time consuming. The other option

    being the use of UBT which is very costly. Keeping these things into consideration the project aims at designing a machine which has

    integratedtrimmer.

    Objective:To integrate a low cost thread trimming device so as to eliminate the use of pair of scissors and thus reduce the machine

    time.

    Methodology:The project is aimed to be done in different phases. The first phase being the planning, research and study of previous

    works. The second phase being the implementation of the study then remove the pitfalls. Phase three constitutes of developing aworking model and finally concluding the project.

    Findings: Total time saved for sewing a run stitch on a collar using the over bed trimmer is 3.0 seconds. Total Cost of the device is Rs.

    2300/-.

  • 8/4/2019 Kolkatta 2009 B.F

    26/30

    STUDENTS NAME: PRAGATI AGARWAL & VINEET GUPTA

    Project Title: Delay Reduction in Lean Merchandising

    Project Guide:Mr.B.Agrawal & Mr.A.Choudhury

    Background: The maximum time is allotted to pre production activities. The actual garmenting process does not increase the lead timeas much as the pre production activities Here comes the need to implement quick response system in apparel manufacturing with the

    aim of shortening the pipeline by eliminating unnecessary inventory and WIP time.

    Objective: To reduce the delays in several orders by analyzing the delay factors and giving suggestions for them.

    Methodology: To determine the workflow in the merchandising dept. and finding out the reasons for delays in it and then giving

    suggestions for them so that the delay decreases.

    Findings: The most of the critical factors of delay is due to pre production activities. So. A merchant can manage the order better byfollowing the planned time and action calendar right the first time.

    Conclusion: Made a manual swatch cutter gum sheets & checklist for the merchandising department so as to make work easy for them

    Numerous suggestions given in respect to the delays found.

  • 8/4/2019 Kolkatta 2009 B.F

    27/30

    STUDENTS NAME: RAKESH RANJAN

    Project Title: Category Performance analysis and Visual Merchandise maintenance issues

    Project Guide:Mr.Amitava Choudhury

    Background: Category Management plays a huge role in enhancing store performance. Analysis needs to be done to find out thecategories that are not performing and the reasons for it. The steps needs to be taken to enhance the performance of non performing

    categories and decision needs to be taken on which category is to be retained and which category needs replacement and also find out

    the correct replacement.

    Objective:To enhance the sales by category analysis and VM maintenance issues.

    Methodology: Based on the basis of analysis of primary data and secondary data.

    Findings: Accessory sales need to be promoted as sales from this category is low. The displays used in the store should be compatibleand blend properly.

    Conclusion: VM standard should be up to the mark to attract the customer and ultimately enhancing the sales.

  • 8/4/2019 Kolkatta 2009 B.F

    28/30

    STUDENTS NAME: ROHITASHW TRIVEDI & SHURJO JHA

    Project Title: Introducing Hop-Wait HOP Production System

    Project Guide: Mr.S.S.Ray & T. Bhattacharya

    Background: Every organization wants to increase productivity. Different approaches are made to reach the goal of increasingproductivity. One of the way viz. Hop-Wait HOP Production System is also may be tried to reduce waste and increase productivity.

    Objective:With the kaizen the goals are different. Naturally one tries to optimize the profit. This is possible however only with high

    customer satisfaction, since customer production is more expensive than customer connection. In order to ensure customer satisfaction,

    three factors are the centre of attention. Reduction of costs, Quality assurance and speed.

    Methodology: Related articles, cases studies etc.Books, Internet sources, Companies internal experts, Different reports generated by

    the company, observations derived from practical examination of fabric floor, Charts generated by analysis of secondary data, touch

    history analysis.

    Findings: Value Loss, Muda Muri, Efficiency, Process Improvement.

    Conclusion: The project successfully fulfilled its aim of eliminating waste, by resulting in reduced cost in terms of 3 Ms of the

    organization, material, manpower and money. The project looked at quality and time taken within the framework

  • 8/4/2019 Kolkatta 2009 B.F

    29/30

    STUDENTS NAME: ROMIKA BHOWMIK

    Project Title: To develop a strategic sourcing model

    Project Guide: Prof.T.Bhattacharya

    Background: Strategic sourcing is a disciplined, systematic process for reducing the total costs of externally purchased materials,products and services while maintaining or improving levels of quality, service and technology. There are competitive as well as

    customer pressure to reduce costs. The project was taken up to develop a strategic sourcing model which would ensure sourcing

    decisions to suppor5t supply chain and business objectives.;

    Objective:To make sourcing decisions such that they support supply chain and business objectives in garment industry.

    Methodology: Based on collection of data from the central warehouse and following supply chain management norms.

    Findings:Analysis of various sourcing models were studied a new fabric sourcing model was developed with the emphasis on thereduction in lead time.

    Conclusion: The project therefore helped to make a quantitative evaluation system for suppliers in Prateek Apparels Pvt.Ltd. and made

    sourcing decisions simpler and logical.

  • 8/4/2019 Kolkatta 2009 B.F

    30/30

    STUDENTS NAME: SHAHNAWAZ AKHTAR

    Project Title: E-Learning For Fashion Technology

    Project Guide: Mr.S.S.Ray

    Background: The project was undertaken to understand the meaning of e-learning, its components, its advantages , importance and itsmajor features that can make it useful tool in fashion technology education in India. The project also analyses a survey conducted on

    fashion technology student and faculty in major colleges to identify problem with traditional learning methods and there awareness

    level about e-learning.

    Objective:To assess the requirement of E-learning for fashion technology research and suggest the features required for the product to

    be developed and develop a pilot version for the same.

    Methodology:.Research was carried out in major fashion colleges in India like NIFT, Pearl and ATDC to find requirement of E-

    Learning for Fashion Technology. Various features required for E-Learning was found out and finally a pilot version was developed.

    Findings: E-Learning, Online Leaning, Scheme adopted.

    Conclusion: The study shows that E-learning has wide scope in the field of fashion education and it could be very successful if

    property developed and implemented.