ADRIANA ADvanced Reactor Initiative And Network Arrangement I. Váša, J. Molnár, J. Dušek Ústav jaderného výzkumu Řež a.s. (Nuclear Research Institute Řež a.s.) Řež, Czech Republic

Upload: others

Post on 26-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

ADRIANAADvanced Reactor Initiative And Network Arrangement

I. Váša, J. Molnár, J. DušekÚstav jaderného výzkumu Řež a.s. (Nuclear Research Institute Řež a.s.)

Řež, Czech Republic

Page 2: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

The basic energy facts

Energy self sufficiency is impossible to achieve

The Union’s growing dependence on external sources of supplyEurope-30: total energy

(reference scenario in mtoe)

0200400600800

10001200140016001800200022002400

1990 2000 2010 2020 2030

production

net imports

consumption

EU 30: external dependence per energy product

0%10%20%30%40%50%60%70%80%90%

100%

Solid fuels Oil Natural gas Total

1990 2000 2010 2020

Impact on the European Union

Page 3: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp
Page 4: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp
Page 5: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

TechnicalTechnical UniversityUniversity –– VRVR 1 Reactor1 Reactor

Page 6: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

EU Structural Funds 1Funding

Total investment costs: 5,5 mil. €

(EU structural funds)

NRI contribution: 1,5 mil. €

Page 7: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp
Page 8: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

MSR fuel assembly in LR-0 reactor

Page 9: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

ADRIANA in brief

• The project ADRIANA (ADvanced Reactor Initiative And Network Arrangement) has been proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission.

• The project define the needed research infrastructures, refurbishment or upgrading of existing facilities, irradiation facilities and hot laboratories or construction of new ones.

• The research leading to these results has received funding from the European Atomic Energy Community’s (Euratom) Seventh Framework Programme FP7/2007-2011 under grant agreement n° 249687.

Page 10: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

ADRIANA in brief

The Project is focused on following reactor systems and connecting technologies:

Sodium Fast Reactor (SFR)

Lead Fast Reactor (LFR)

Gas Fast Reactor (GFR, including very high temperature technologies)

and associated technologies:Instrumentation, diagnostics and experimental devices

Irradiation facilities and hot laboratories

Zero power reactors

Road map of research infrastructures.

Page 11: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

ADRIANA Objectives• To strengthen links between parties involved in RD of new reactor systems

(Regulatory Bodies, utilities, research and technical support organisations, industry and engineering companies, governmental research organisations and universities) and industry.

• To share the experimental equipment and facilities as well as integrate partial research findings for the sake of new types of nuclear energy development.

• To use information available from other EURATOM FP7 projects (ELSY, ESFR, GCFR and others).

• To maintain communication with OECD and IAEA programmes, especially those that imply experimental research achieved outside the EU countries (e.g. Russia).

• To create conditions for efficient exchange of information and cooperation for improved communication in participating organizations.

Page 12: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

Working Packages

WP 1 - Project management

WP 2 - SFR facilities

WP 3 - LFR technologies

WP 4 - GFR

WP 5 - Instr., Diagn. and Exp. Devices

WP 6 - Irradiation facilities, hot labs

WP 7 - Zero Power Reactors

WP 8 - Road map

Page 13: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp
Page 14: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

The Consrotium

FRLGILagrange Sarl15

LVIPULLatvijas Universitates Agenturai LatvijasUniversitates Fizikas Instituts14

SKVUJEVUJE a.s.13

NLNRGNuclear Research and Consultancy Group12

DEJRC-ITUJRC – Joint Research Centre – European Commission11

FRIRSNInstitut de Radioprotection et de SureteNucleaire10

ROINRRegia Autonoma Pentru Activitati NucleareDrobeta Tr. Severin Ra Sucursala CercetariNucleare Pitesti

9

DEFZDForschungszentrum Dresden - Rossendorf EV8

HUAEKIMagyar Tudomanyos Akademia, KFKI Atomenergia Kutatointezet7

CZRC-RezCentrum vyzkumu Rez s.r.o. 6

BESCK-CENStudiecentrum Voor Kernenergie5

DEKIT-GKarlsruher Institut Fuer Technologie4

ITENEAAgenzia Nazionale Per Le Nuove Tecnologie, L'energia e Lo Sviluppo Economico Sostenibile3

FRCEACommissariat A L Energie Atomique Et Aux Energies Alternatives2

CZUJV-RezUstav jaderneho vyzkumu Rez a.s.1

CountryCodeShort NamePartner’s Full Organisation NamePartner

Page 15: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

ADRIANA Funding Scheme

ADRIANA (ADvanced Reactor Initiative And Network Arrangement)

Type of funding scheme:

Coordination and Support Actions: … CSA

Total budget / EU contribution ……… €1.5M / €1.0M

Pre-financing ………………………………. 60%

Starting date and duration …….. 01/02/2010 - 18 months

Reporting periods …………………………. n.1 at 18 months

Coordinating organisation & partners… 15 from 6 EU countries

Work programme topics addressed:

Fission-2009-2.2.2: Network for the development and implementation of the European Industrial Initiative in sustainable nuclear fission energy

Name of the coordinating persons:

UJV Rez: Dr. Ivo Vasa [email protected]

Euratom: Roger Garbil [email protected]

Website http://adriana.ujv.cz/

Page 16: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

Results• A survey of research disciplines and activities needed for the

development of the systems and technologies.

• A survey of the safety issues, research and activities needs for the safety assessment of the future reactor systems

• Specifications of infrastructures and experimental devicesrequired to face the major challenges identified.

• A survey of existing facilities, evaluation of possibilities of their use and/or upgrade, needs of construction of new facilities.

• The upgrade of existing facilities and construction of new ones will be phased in time and consolidated in an infrastructure roadmap on a trans-national basis.

Page 17: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

Main Stages

Month 4: Preliminary reports describing the present situation and future needs.

Month 6: Map of the existing research infrastructure and list of research projects.

Month 12: Project update and project seminar.

Month 14: Reports on future needs and infrastructure road map.

Month 15: Evaluation of existing research infrastructures for long-term vision of sustainable energy.

Month 18: Project final report, Roadmap proposal for building knowledge and facilities needed for new nuclear energy systems development.

Page 18: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

Advisory and End User Group

• The Advisory and End-User Group – specified in Annex I (DoW) to the ADRIANA Grant Agreement - will be set up within the Project to represent the interests of end-users in the Project.

• Its “End-User’s” part will consist of skilled managers and representatives of potential users of the research infrastructure - research institutes and industry. In the “Advisory” part representatives of academic sector, regulators IAEA, NEA experts and ESNII members will be assembled.

• The AEUG group will be set up as soon as possible after the beginning of the Project.

Page 19: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

Project Progress

Project start date: 01/02/2010End of the project: 31/07/2011 (Duration: 18 months)

Meetings:• Kick-off Meeting 01/02/2010 in ÚJV Řež a.s., CZ• 1st Workshop 7-8/06/2010 in ÚJV Řež a.s., CZ• 2nd Workshop 26-27/10/2010, Firenze, It• 3rd Workshop 30-31/5/2011, Brussels, Be• Project Seminar 10-11/3/2011 (T+12), Brussels, Be

Final meeting:• Project Conference (T+18): 11-12/7/ 2011/Rez/CZ

Page 20: Kopie - ADRIANA-Konfojs.ujf.cas.cz/~wagner/transmutace/erinda/presentations/05_ADRIA… · WP 2 - SFR facilities WP 3 - LFR technologies WP 4 - GFR WP 5 - Instr., Diagn. and Exp

ADRIANA public website

http://adriana.ujv.cz/