korea east-west power company installs zenon
TRANSCRIPT
The Dangjin Thermal Power Plant in Chungcheongnamdo is op-
erated by Korea East-West Power Company Ltd (EWP). From
the start, it was clear that the extension of the Dangjin Thermal
Power Plant by building units 9 and 10 would require world-
class engineering technologies and next-generation power-
plant design in order to meet the environmental and economic
objectives and deliver high-efficiency operation. Korean Sys-
Korea East-West Power Company Installs zenon
The Dangjin Thermal Power Plant is located in the north-westerly province of Chungcheongnamdo in Korea. It is an established plant with eight active coal-fired units with 500MW. In 2011, work began to scope two new power plant units. These units – Dangjin 9 & 10 – will be Korea’s first 1,000MW USC coal-fired power plants.
An electric partnership: COPA-DATA and NEXPO
tem Integrator, NEXPO, based in Seongnam-Si, has a proven
record of delivering successful automation and engineering
projects in the Korean energy sector and, as a result, began bid-
ding to be involved in the project in 2011. NEXPO was awarded
the contract for supplying the Electrical equipment Control and
Monitoring System (ECMS) for the thermal plant in November
2012.
energy & infrastructure I korea ewp
a need for advanced software Although NEXPO has delivered successful projects for the five
Korean GENCOs since 2003, with two strong references deliv-
ering ECMS systems in similar ‘combined cycle power plants’,
the project team at NEXPO felt that for this project a more ad-
vanced software was needed. Park Mun-Hwan, Engineering De-
partment Leader at NEXPO, explains the situation: “In previous
projects we had designed a solution using a VAMP protection
relay with our own SCADA system. During the commissioning
of these projects we had encountered significant hurdles and
limitations with that software and the team felt they needed to
look again at the market to find a more advanced technical so-
lution. We wanted to find a solution that would make engineer-
ing easier and present a better overall solution for the control
and monitoring of the plant.” After assessing the various tech-
nologies available to them, the NEXPO team decided that the
zenon SCADA software from Austrian software manufacturer
COPA-DATA would best meet the project requirements.
reliable operation and controlChoe, Hyeon-Hui, the project manager at NEXPO with respon-
sibility for the two Dangjin 1000MW thermal power plant pro-
jects, says zenon’s ease of engineering was a key advantage:
“zenon is an impressive tool. The use of parameters instead of
programming and the huge library of pre-configured tools de-
signed for use in the energy industry made it a very compelling
solution. Staff at Dangjin Thermal Power Plant were also very
impressed with the graphical capabilities; zenon makes it very
easy to produce ergonomic user interfaces.”
It was important that the system deployed would:
Improve the balance control, especially for such a
large power plant
Create cost savings by reducing operating manpower
Reduce – or eliminate – the opportunities for human error
Create optimum energy efficiency through effective
protection and power control
Limit any power failure spread to a minimum
Reduce fault analysis time by delivering clear tools
and analysis.
state-of-the-art softwareChoe, Hyeon-Hui: “zenon delivered everything we asked and
more. It is a better quality system than any we have used be-
fore. By using zenon, we were able to ensure the easy operation
and maintenance of the system, easy fault analysis, a stable
communication network and reliable redundancy very simply.
In addition, the excellent technical support – in particular, the
excellent communication with COPA-DATA Korea – has really
zenon provides a clear visual overview of
the entire operation throughout the two new
buildings (Units 9 & 10).
korea ewp I energy & infrastructure
impressed us. zenon offers state-of-the-art software backed up
by a great team.” The scope of the project included the control
and monitoring of all the facilities and devices within the BOP
system, including the IEDs, electrical equipment, IED controller,
generator, transformer, capacitor bank and protection controls.
This meant that any system had to adhere to the IEC 61850
standard.
state-of-the-art servicePark Mun-Hwan describes how COPA-DATA helped the NEXPO
team ensure compliance with the IEC 61850 standard. “COPA-
DATA sent out a zenon Energy Edition expert from its head-
quarters in Salzburg to support us on the project, so we had
significant support ensuring our engineering was IEC 61850
compliant. I think this experience has been indicative of the
support and service we have received from COPA-DATA at all
levels.” Kim Jung-Bae, CEO at NEXPO, concurs: “We’re now
coming to the final stages of this huge project – a milestone
for Korean energy production. For NEXPO, the project has also
been a milestone – we have found a very impressive software
solution in zenon and an impressive partner in COPA-DATA Ko-
rea. I expect this will be just the beginning of a very impressive
partnership between NEXPO and COPA-DATA in the Korean
Energy market.”
Color-coding rapidly communicates
equipment states and operators can drill down
to access more detailed information.
energy & infrastructure I korea ewp
korea ewp dangjin thermal power plant 2 x 1000mw units (units 9 & 10)
Rapid and flexible project engineering
Intuitive and ergonomic graphical
user interface
Simple system operation and
maintenance
zenon Report Generator for powerful
reporting functionality
IEC 61850 compliance
Simple-to-configure and reliable
redundancy
Remote monitoring and control
Optimum reliability and security