kovair alm application on model based process improvement
TRANSCRIPT
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
17-05-2017 www.kovair.com 1
Configured for
Model Based Process Improvement for
CMMI® - Development Version 1.3
Presented by :
Shibaji GuptaDirector, Kovair Software
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
A Real-life Application Development Scenario
17-05-2017 www.kovair.com 2
RequirementsManagement
Design /Coding
ConfigurationManagement
Build Management
(Manual Process)
TestManagement
DefectManagement
RiskManagement
ProjectManagement
Lack of Visibility, Process Automation and
Traceability
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
What is Required?
17-05-2017 www.kovair.com 3
• Connect Software Teams & Tools to achieve• Real-time collaboration• Automated Task Based workflow• Real-time visibility on project and release
progress
A centralized system that helps you
• Where do I start from?
Process Improvement
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Process Improvement - Approaches
17-05-2017 www.kovair.com 4
Model Based Process Improvement Is the type of approach that CMMI uses.
The other models available are ISO and Malcolm Baldidge.
CMMI based Process Improvement is more focused towards a specific industry whereas the others are generic in nature and can be adopted by any industry.
Although there are difference in approaches, there are also similarities as follows:
Each approach select a process and not product to be improved. The result is an improved product. Each approach use team either formally or informally having planning and research in common. Definition of current process and the proposed changes are documented. Results are communicated between stake holders.
Kovair Supports all the approaches
Business Process Re-engineering
[BPR]
Benchmarking
Model Based
Process Improvement
Process
Improvement5 Approaches
Reverse Engineering
Process
Engineering / work Flow management
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Capability Maturity Model Integration – CMMI (Dev) V 1.3 - why?
17-05-2017 www.kovair.com 5
What is your Motive behind selecting a Model ?
Did you understand the Model before selecting the same ?
Process Improvement
Tried other Process improvement
strategies, not liked or tired of that
approach
Customer is asking you to be
CMMICMMI covers
systems, software, hardware
engineering along with integrated
team dev.CMMI covers systems, to reduce
the cost and confusion
The Appraisal
View
The Process Improvement
View3% to 5 % of tech. staffing
Views Initiator
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
CMMI (Dev) V 1.3 - Two Major Terms and Definition
17-05-2017 www.kovair.com 6
IMPLEMENTATION
Is simply performing a task within the process area.(A process area is an area that CMMi has selected where your organization needs to focus on, such as Project Planning or Configuration Management. It is a set of related task that addresses a common area).
INSTITUTIONALIZATION
Implies that the process is ingrained in the way the work is performed and there is commitment & consistency to performing (i.e., executing) the process. It ensures that the process will also continue in the absence of those how has created it .
Kovair Facilitates uniform implementation to
institutionalization of Process Area across all Projects in the organization.
Configured to ensure activities done as per CMMI Dev 1.3 Model to satisfy the GG & GP of different maturity level.
Proving the ROI for the Model and the tool.
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
SURVIVAL PROCESS
Organizational goal
Cmmi institute partner
Organization
Process consultant Transition partners
EPG & PAT
Identifying the AS IS process
May be in the Scope of
work
May be in the Scope of
work
Identifying the TO BE process
Implementation & organizational plan
Action PlanModel
Overview
Training of ATMs
Training on CMMI Model & appraisal
method
Implementation & Institutionalization of
the process
APPRISAL
SCAMPI AFor Mat Level
Achieving Maturity / capability Level
Model Overview
CMMI (Dev) V --- 1.3 ----- How do you get the Maturity Level
17-05-2017 www.kovair.com 7
Kovair Ensures Planning of Processes and Monitoring
the changes in Process improvement (PI) plan .
Predefined Processes as per CMMI are
configured to enable you “Plug & Play”
Changes in the process definition or procedures
can be tracked and configured in the Tool.
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
CMMI (Dev) V 1.3 ---- Model and Process Area Over View
17-05-2017 www.kovair.com 8
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
CMMI (Dev) V 1.3 ---- Process Areas and their Relations and Impacts
17-05-2017 www.kovair.com 9
How do you maintain these impactso Manually Through Document?o Through Excel sheets?
Can you Achieve accuracy Aren't you leaving yourself open for surprises?
BASIC PROCESS MANAGEMENT PA
OPF OPD
OT
Resources & coordination
Org process needs & objectives
Standard Process& other assets
ADVANCED PROCESS MANAGEMENT PA
OPM
OPP
CommonMeasuresAbility to develop and deploy
Standard process and other assets
SR MANGM
ENT
Business Objectives
Quality & ProcessObjectives
Performancecapability
organization
Improvements
Basic Project management
Advanced Project management
Supplier
MA
PPQA
CM
DAR
CAR
SAM
Supplier Agrement
PP PlansREQM
Product & component req.
PMC
Status , issues and resultsOf reviews and monitoring
Corrective Action
What to Monitor
Replan
Project Shared Vision
IPM
Project Performance
Data
RSKM
Risk taxonomies& parameters
Risk status, riskMitigation plans,
& corrective action
QPM
Project Compose and Defined process
Identified Risk
Team Learning &Guidelines
Organization's standardProcess work Environment
Standards and supporting assets
Statistical Management Data
Process performanceObjective baseline
And models
Engineering process Area
RD TS PI
VALVER
Requirments
Product and componentsRequitments
Alternative Solution
Requirements
Product Componets
Customer
Customer Needs
Requirement, productComponent, work
Product ver & val rpt
ALL PROCESS
AREAS
TS RD
VA
L
VER
PI
REQ
M
QP
M
IPM
RSK
M
PP
SAM
PM
C
OP
M
OP
P
OT
OP
F
OP
D
CA
R
DA
R
CM
PP
QA
MA
TS
RD
VAL
VER
PI
REQM
QPM
IPM
RSKM
PP
SAM
PMC
OPM
OPP
OT
OPF
OPD
CAR
DAR
CM
PPQA
MA
IMPACT OF PROCESS AREAS ON EACH OTHER
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Kovair value propositions
17-05-2017 www.kovair.com 10
Establishing Your Process Improvement Organization
Required Documentations or Work Products
SETUPDESIG
NPILOT
IMPLEMENT
Defect Rectification Predefined Processes as per CMMI are
configured to enable you “Plug & Play”
People, Roles and Responsibilities
Create The Engineering Process Group(EPG) with their roles & responsibilities and access rights
Create Process Area Team (PATs) with their roles & responsibility and access rights
Group & Role based access rights
Predefined Templates, auto loaded attributes as the users moves over the steps of the process
To create a document the same attributes can be edited and saved as the latest version
Change tracing and version controlling of the documents.
Defining Processes, procedures, policies and Charters
Tool Configured as per the defined Process and procedure in “Plug & Play” manner through workflows
Changes can be made and tracked on the Process and Procedures Templates
Changes can be implemented in Work Flow after impact analysis of the changes.
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Measurement!! a Boatload of Metrics and Statistical Process Control
17-05-2017 www.kovair.com 11
CMMI focuses on measurement throughout the model
The Generic Practices (GP) in all Process areas for GP 2.8,
2.10 and 3.2 covers the same
Kovair has 202 Metrics preconfigured at different PA’s, The
user has the choice to select the Metrics he needs at the
Project level or the Organization level
Example : REQM PA
1. Requirement Volatility (Percentage of Requirement change)
2. Number of Requirement by Type or Status (Defined, reviewed,
approved and implemented) …. etc.
PA LEVEL 2 LEVEL 3 LEVEL 4 LEVEL 5
TS 25
RD 8
VAL 3
VER 7
PI 3
REQM 10
QPM 23
IPM 7
RSKM 10
PP 7
SAM 18
PMC 8
OPM 14
OPP 4
OT 6
OPF 4
OPD 5
CAR 8
DAR 2
CM 14
PPQA 14
MA 2
TOTAL 73 80 27 22
202
NUMBER OF METRICS AT DIFFERENT LEVEL
SPC In SPC Kovair has the capability of showing representation in
Check sheets
Run Chart
Histogram
Pareto Chart
Control Chart
Users can configure their dashboards as per their requirements
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Sample Screen - Cross Tool End to End Traceability
17-05-2017 www.kovair.com 12
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Kovair value propositions
17-05-2017 www.kovair.com 13
“It takes at least few renditions to make an indelible mark on a learned mind.” As Kovair has the CMMI® practices ingrained in it, its use automates institutionalisation of the
practices across all projects Training will be necessary to create the awareness, but will reduce the need of renditions Impact:
o Reduces the learning curveo Saves about 75% of cost towards process training
Improving Effectiveness of Process Training
Managing Impacts on Changes
“Change is the only constant thing in life.” Changes impact work products - interlinked and bound by a maze of processes – integrity of work
products may be easily compromised Having Kovair helps you to:
o Trace links among processes vis-à-vis work products & automates change managemento Maintain traceability of work productso Save from rework /damages from inadvertent mistakes while implementing change requests
Evidence of practice implementations are captured in real time manner Facilitates continuous monitoring of process implementation & their effectiveness Benefits:
o You can preview where it all stands before the appraisal is actually conductedo Keeps the organization in “appraisal-ready state”
Keeps You Ready for SCAMPI®
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
PIIDs and Data Consolidation Sheets
17-05-2017 www.kovair.com 14
Status of practice implementations are captured in real time in the PIID and can be drilled down to view the evidences
Mapping of all practices – SPs and GPs – for all PAs - done across all projects – Run Time!
Facilitates continuous monitoring of process implementation & their effectiveness
Benefits:o Saves the Man-hour invested in
preparation of the PIIDs
Practise implementation Indicators Description
Data Consolidation Sheet.
22 PIIDs from the process areas are be consolidated
Facilitates Sponsor to have a view on the INSTITUTIONALIZATION of the model on real time
basis
PROCESS AREA GP SP PROJECT TOTAL FIELDHOURS
@ 15MIN
MAN
DAYS
REQM 10 5 5 75 18.75 2.34
PP 10 14 5 120 30.00 3.75
PMC 10 10 5 100 25.00 3.13
SAM 10 6 5 80 20.00 2.50
MA 10 8 5 90 22.50 2.81
PPQA 10 4 5 70 17.50 2.19
CM 10 7 5 85 21.25 2.66
DAR 12 6 5 90 22.50 2.81
OPF 12 9 5 105 26.25 3.28
OPD 12 7 5 95 23.75 2.97
OT 12 7 5 95 23.75 2.97
RD 12 10 5 110 27.50 3.44
TS 12 8 5 100 25.00 3.13
PI 12 9 5 105 26.25 3.28
VER 12 8 5 100 25.00 3.13
VAL 12 5 5 85 21.25 2.66
IPM 12 10 5 110 27.50 3.44
RSKM 12 7 5 95 23.75 2.97
OPP 12 5 5 85 21.25 2.66
QPM 12 7 5 95 23.75 2.97
OPM 12 10 5 110 27.50 3.44
CAR 12 5 5 85 21.25 2.66
INVESTMENT IN CREATING A PIIDs
LEVEL 3 LEVEL 5
MANDAY EMP MON MANDAY EMP MON
53.44 2.43 65.16 2.96
EPG can focus on innovation and decisions rather than data collections.
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Kovair value propositions
17-05-2017 www.kovair.com 15
User has the option to select the methodology for the Project
Organisation can have multiple project on different methodology.
All activities performed under chosen Methodology are mapped with CMMI generic and specific practices , and thereby supporting the PIIDs.
Kovair support your Model Irrespective of Methodology
22 Pre configured Process Areas as per the CMMI – Dev V 1.3 Model Organization level processes are defined in the Work Space
o Changes if required in the process flow can be easily done as per requirement.o Customer Accounts can be created
• Multiple Projects under the Accounts can be created • Project level PA’s are automatically configured on their creation.• Centralized support processes for all projects as per the CMMI Model are configured.
Configuration overview
APLICATION LIFE CYCLE
CMMI
WATERFALLOR
AGILE
Philosophy
PI Approach
Methodology
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Stakeholders Benefit
17-05-2017 www.kovair.com 16
Executives/Senior Management
• Easy online access to reports and dashboards
• End to End visibility of projects and portfolio
• Predictable & increased number of releases
• Improved Productivity and Quality
• Satisfied and Happy Customer
Front Line Managers
• Continuous updates on project status any time, any where
• Better visibility of Team and individual performance irrespective of locations
• Real-time update on conformance to the code quality metrics and industry standards with integrations like LDRA, SonarQube, FxCop
• Consolidated and real-time reports and dashboards for project management like EVM
• Real-time communication through task based workflow and notification reducing phone calls, emails and meetings -productivity gain
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Stakeholders Benefit
17-05-2017 www.kovair.com 17
Developers
• Get ‘ALM-In-Place’ within IDE (Eclipse, Visual Studio) – no need to go to any external tool
• Initiate unit testing, code coverage, and code analysis from the IDE
• Traceability view of test artifacts and their execution status from the IDE
• Remain updated with the latest and correct Requirements
• Real-time visibility of defects and related information against their code
• Productivity gain
Testers
• Real-time availability of multiple Test coverage statistics that helps in measuring progress of the ongoing testing activities
• Traceability of testing back to use cases, requirements, design, other artifacts for higher project visibility
• Keep updated with real-time status of the development progress
• Updated about information on Build status – content and defects
• Productivity gain
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
Solution achieved through Kovair
17-05-2017 www.kovair.com 18
RequirementsManagement
Design /Coding
ConfigurationManagement
Build Management
TestManagement
DefectManagement
RiskManagement
ProjectManagement
CentralizedTool
Change Management This is all about changing you organisation culture
Kovair Proprietary information. Not for disclosure or sharing with any other third party without Kovair’s prior written perm ission
17-05-2017 www.kovair.com 19
Thank You
Visit us for more details and Demo of the Tool at
www.Kovair.com
Source and acknowledgements to :Interpreting the CMMI … By Margaret K.Kulpa & Kent A. JohnsonCMMI® for Development, Version 1.3 Ambarnath Chakroborty, Greenfield Solutions.Kovair CMMI® configuration manualMisc Websites