KRUPP (K10001) 1000 ton Lattice Boom Mobile/Pedestal Crane
Delivered new : 1971 (ref. 1993 + 2002) Main Boom : 81 meter, with 1000 ton head Luffing fly jib : 99 meter Fixed fly jib : 39 meter Heavy duty fly jib : 9 meter, 425 ton capacity Hook blocks : 1 x 500 ton + 1 x 160 ton Winches : 3 (2 x main hoist 22 ton line pull) Engine : MWM V12, 500 bhp Safe Load Indicator : Pat Counter weight : 260 ton crane cwt and 100 ton carbody cwt Carrier : 9 axle line modular trailer Outriggers : 4 x demountable beams + hydr. Legs
MAIN OFFICE: STORAGE & WORKSHOPS: Spoorstraat 15 - PO Box 43 Nulweg 1 8084 ZG 't Harde 9561 MA Ter Apel Holland Holland Tel.: +31-525-651832 Tel.: +31-599-589710 Fax: +31-525-653032 Fax: +31-599-589720
Email [email protected] Internet www.sindorf.nl
1000 TONNE KRUPP K10001 Mobile crane
1000 TONNE KRUPP K10001 Mobile crane
1000 TONNE KRUPP K10001 Mobile crane
Main Boom Range Diagram / Hook Height Curves
MPWA – Maximum Permissable Wind Speed
1000 TONNE KRUPP K10001 Mobile crane
Main Boom Duty Chart
1000 TONNE KRUPP K10001 Mobile crane
Main Boom Range Diagram / With Superlift
“V-system”: Not available at this moment
1000 TONNE KRUPP K10001 Mobile crane
Superlift Duties
“V-system”: Not available at this moment
Radius in metres
1000 TONNE KRUPP K10001 Mobile crane
Luffing Boom Range Diagram (85º tower position)
1000 TONNE KRUPP K10001 Mobile crane
Luffing Jib Duties
1000 TONNE KRUPP K10001 Mobile crane
Luffing Jib Duties
1000 TONNE KRUPP K10001 Mobile crane
Luffing Jib Duties
List of main refurbishment work carried out over recent years to Krupp/Rosenkranz 1000t truck crane.
1) All outrigger vertical rams, rechromed, sealed pressure tested. a) Lock valves repaired. b) All outriggers hydraulic pipes replaced. 2) “Slave” Perkins diesel engine pack on skid added to equipment to allow jacking of
crane base without upper engine. For transporting can be mounted on crane itself. 3) New hubs and tyres on rear bogies brakes also rebuilt on this bogey.
4) All air system completely replaced.
5) New swing around superstructure cabin, hydraulically tiltable.
6) All new crane controls. Electronic proportional control of hydraulics. Cab is easily removable. 7) Superstructure electrics all replaced, cables, wires, switches, contractors, new
enclosures. 8) New safe load indicator P.A.T. manufacture.
9) Main pumps, refurbished and tested.
10) New running ropes.
11) New pendant ropes.
12) Slew gearbox completely rebuilt.
13) Engine rebuilt.
14) Hoist one and hoist two motors refurbished.
15) New bearings in all sheaved.
16) All electrical cables up boom replaced.
17) New over hoist limited switch installed.
18) New wind meter installed.
19) All load cells rebridged and recalibrated.