Remote Microgrids
1. Phu Kradueng National Park
2. Chik Island Village
Pico Hydro Power
3. Kiriwong Village (community of practice)
Package Hybrid Power Supply
4. Tat Mhok National Park
CASE STUDY:
1
2
3
4
![Page 3: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/3.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Phu Kradueng National Park
Loei Province
![Page 4: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/4.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Phu Kradueng National Park
Energy System Integration concept
- Fuel
- Electricity
- Water
- Heater
- Data communication
![Page 5: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/5.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Phu Kradueng National Park
Technology Development
![Page 6: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/6.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Phu Kradueng National Park
Technology Transfer
![Page 7: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/7.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village
The culture of the people
Ko Jig Village ,Klung
Distric, Jantraburi Province
Location
Latitude 12O N
Longitude 102 E
Population
512 inhabitants
112 households
![Page 8: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/8.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village
Old Electrification Systems
Ko Jig Village ,Klung
Distric, Jantraburi Province
Location
Latitude 12O N
Longitude 102 E
Population
512 inhabitants
112 households
![Page 9: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/9.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village
Participation with the village
![Page 10: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/10.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village
W W
SB
2x
2.5
kW
5 kW 5 kW
G
192 kWh 47 kWp
SI 15 kWSB
8x6 kW
60 kW192 kWh
SI 15 kW
Implementation
![Page 11: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/11.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village
Village electrification committee
RESCO :
Rural Energy Service
Company office
RESCO (Rural Energy Service Company) organization
-Set the management system
-Set the regulation
-Set tariff (12 B/kWh)
-Approve the monthly account
9 staffs
Operate the RESCO
system
5 staffs (Have salary)
![Page 12: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/12.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village
1. The prepaid smart meters have eliminated risk of non-payment that happens in a
traditional billing arrangement.
2. Chik Island success case in the community owned and operated hybrid system owe
largely to the careful community consultation process during the early phase of the
project through several workshops.
3. Although the technician is well-trained and capable of daily system operation and
maintenance, there could be occasions when imported equipment's.
Chik Island lessons learned
![Page 13: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/13.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)
life style and occupation
local-made hydro-power unit
![Page 14: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/14.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)
local-made hydro-power unit
- low level of electric power - unsteadily electricity.
field testing
![Page 15: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/15.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)
Technology Development
![Page 16: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/16.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)
Technology Transfer
![Page 17: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/17.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)
฿/W Household
>100 3
>100 3
35 15
20 >50
locally designed
Performance
investigation
Pelton’s bucket
1 step runner foundry
2014 2009 2006 1992
![Page 18: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/18.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)
1
4 6
2 5
10 9
13 12
3 7
8
11
14
15
16
17
18
18 19 20
25
23
26
20 22
24
21
34
33
32
318
30
27 29
28
37 36 35
18
40
39
38 43 20 42 41
45 46
44
43 48
47
![Page 19: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/19.jpg)
1. Community of Practices (CoP).
Several villagers attempted to build a small hydropower unit for generating electricity in
their farm. (fish cans, stair’s heads, cup like blade turbine)
2. Based on concepts of inclusive innovation.
The main objective of this project is to develop a standard design procedure for pico
hydro turbine units that can be manufactured locally in Thailand. (0.3 US$/W)
3. Based on Appropriate technology.
The design is suitable for local geography. (high head>>Pelton’s wheel)
4. Local Change-agents development
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)
key to success
![Page 20: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/20.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Package Hybrid Power Supply: Tat Mhok National Park
Tat Mhok National Park, Phetchabun Province
![Page 21: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/21.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Package Hybrid Power Supply: Tat Mhok National Park
Package Hybrid Power Supply
Model: 39-25
230/400 V 50 Hz
Power Rated: 39 kW
PV = 5.76 kWp
WECS = 1 kW
DG = 26 kW
Battery = 28 kWh
Converter = 6.6 kW
AC Coupling
![Page 22: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand](https://reader030.vdocuments.net/reader030/viewer/2022032616/55a8e01b1a28ab120d8b48e5/html5/thumbnails/22.jpg)
ENERGY FOR OFF-GRID VILLAGES IN THAILAND Package Hybrid Power Supply: Tat Mhok National Park
ระบบย่อยโซล่าเซลลท์ีต่ดิต ัง้เพิม่เตมิ (2544) ระบบย่อยโซล่าเซลลท์ีต่ดิต ัง้เพิม่เตมิ (2544) PHPS 39-25: Tat Mhok National Park