Highways
MEPC Ltd
Wellington Place
General Arrangement
Access Junction
Basement Car Park
Stage 4
1:50
231583-00
WP-ARP-CH-602
/ /240614 RS CW AG
4.0
4.2
Plot 6
Stage 4 Issue. For Comment.
/ /071014 RS CW AG
Amended to incorporate LCC comments
4.1
/ /110315 RS CW AG
and proposed highway adoption.
Updated to reflect revised flood barrier
4.2
MHMH
MH
RG
RG
RG
RG
GAS FHBT
LP
LPLP
BOL
BOL
BOL
BOL
RE
IC
BT
ICRG
RG
500
G 750
G 850
Barrier
2x Cables
B B B B B B B
S
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
TU
TU
TU
TU
TU
TU
TU
TU
LB
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SLSL
SL
SL
SL
SL
SL
SL
SLSL SL
SL
SLSL SL
SL
B
B
B
TU
TU
TU
TU
F8
F7F8
B B B B B
E-1550-00-1
29.985 29.920
29.210
29.686Varies
Varies29.611 1 in 40 1 in 40
1 in 40 1 in 40Varies
Site Footpath
Channel
Drainage
Linear
1 in 10
1 in 401 in 18
Retaining Wall (by others)
29.255
1 in 12.3
Barrier
Defence
Flood
Top of Kerb
Edge of
Buildin
g
Hig
hway B
oundary
Future P
ublic
Hig
hway B
oundary
Existing P
ublic
Channel Line
Future Hig
hway
Channel Line
Existing Hig
hway
detailed design of the widening scheme (by others).
Proposals for future widening of Whitehall Road subject to
Drawing Control - This drawing is based on the following source information:
Component Company Drawing/Model Ref. Date/Revision/Issue
Topographical and buried services survey
Architect's Layout
Landscape Architect's Layout
CJCT
Gillespies Landscape MASTER 12/06/2014
06/09/2014
Subscan 14869_Preliminary 31/08/2007
HB2
DK>
<DK
DK>
HB2
HB2
<D
K
29.680 +
29.690 ++ 29.640
29.660 +
+ 29.586
29.920 + + 29.920
+ 29.210
29.210 ++ 29.210
+ 29.985
29.985 +
29.210 +
Exte
nts of
Works
Exte
nts of W
orks
HB2
DK>
3.653.65
N
ACCESS RAMP TO STRUCTURAL ENGINEER'S DETAILS
D1003D1009
D1038
Key Plan - Scale 1:1000
Comms.
Comms.
Comms.
Elec.
Elec.
Elec.
Comms.
Comms.
Gas
WHITEHALL ROAD
drainage network.
water run-off connecting into site
Linear drain to intercept surface
for details of soft landscaped areas.
Refer to Landscape Architect's drawings
Existing Footway
Existing Footway
boundary at back of footway.
Existing public highway
for details of soft landscaped areas.
Refer to Landscape Architect's drawings
NO
RT
HE
RN S
TR
EE
T
PLOT 5
PLOT 6
WHITEHALL ROAD
+ 29.60 (e)
+ 29.62 (e)
+ 29.63 (e)
+ 29.58 (e)
+ 29.60 (e)
+ 29.59 (e)
BASECOURSE
BINDER/BEDDING SUB-BASE
COURSE
SURFACEREF. COMMENTS
P7
P8
P11
P12
P13
13108-1:2006
100/150 to BS EN
20mm AC6 dense surf
13108-1:2006
100/150 to BS EN
50mm AC20 Dense Bin
Highway Works Clause 803
Sub-base to Specification for
225mm Type 1 Granular
-
overun. Assumed CBR = 3 %.
footway with very occasional
Based on DMRB Light vehicle
7533-4 Table 6.
Sand Jointing to BS BS
7533-4 Table 5. 2-5mm
30mm Bedding Sand to BS
Works Clause 803.
Specification for Highway
300mm Type 1 Sub-base to
-
BS:7533-8.
Assumed CBR = 3%. Based on
Assumes 5 standard axles per day.
13108-1:2006
100/150 to BS EN
50mm AC20 Dense Bin
13108-1:2006
100/150 to BS EN
80mm AC32 Dense Base
Works Clause 803.
Specification for Highway
300mm Type 1 Sub-base to
7533-4 Table 6.
Sand Jointing to BS BS
7533-4 Table 5. 2-5mm
30mm Bedding Sand to BS
Highway Works Clause 803
Sub-base to Specification for
200mm Type 1 Granular
-
overun. Assumed CBR = 3 %.
footway with very occasional
Based on DMRB Light vehicle
Street). Assumed CBR = 3%.
Street Type 2 (Local Residential
Based on LCC Street Design Guide.
Grade ST4 Concrete Infill with Steel Wire Brushed Finish
LCC standard detail SD/07/01b.
flexible construction based on
provided between rigid and
Rolling block transition to be
1.2
0.8
Specification
Landscape Architect's
Concrete Flags to
400 x 400 x 65mm
Units
Blister Tactile Paving
400 x 400 x 65mm
HB2
BN B
N
CS2
BN
D1018.1 D
1018.1
will need to be relocated as part of the works.
requirements. However, it is assumed this chamber
Existing BT chamber. Contractor to confirm diversion
for hard landscaping within the development site.
Refer to site paving and kerbing general arrangement
for hard landscaping within the development site.
Refer to site paving and kerbing general arrangement
13108-1:2006
100/150 to BS EN
30mm AC10 dense surf
to be removed.
junction kerb line
Existing access to be removed.
junction kerb line
Existing access
confirm any diversion requirements.
existing footway. The Contractor is to
Buried services are present within the
be tied into existing markings.
Double yellow road markings to be tied into existing markings.
Double yellow road markings to
Linear drainage channel. Linear drainage channel.
outside of the junction adjacent to the new kerb line.
Road will be regraded and this gully will be relocated
Northern Street widening scheme is implemented Whitehall
the low point. It is assumed that when the Whitehall Road /
within the junction to ensure the existing gully remains at
Existing gully to be retained. Levels are to be formed
CS2
channel units cut to half lengths.
Channel to be formed using CS2
bituminous pavement build-up.
kerb and the reinstatement of adjacent
replacement of the existing channel
Allowance is to be made for the
HB2
0.8
1.2
<D
KD
K>
DK>
<D
K
BN
BN
(1 in 4
0)
2.5
%
(1 in 4
0)
2.5
%
( 1 in 1
8)
5.6
%
( 1 in 1
8)
5.6
%
29.686 +
29.586 + + 29.686
(1 in 4
0)
2.5
%
(1 in 4
0)
2.5
%
widening scheme.
following Whitehall Road
Future edge of carriageway
Road widening scheme.
boundary following Whitehall
Future public highway
HB2
HB2
slab. Nominal cover to reinforcement = 60mm.
200mm PAV2 Concrete with A393 mesh reinforcement in top of
Highway Works Clause 803
Sub-base to Specification for
320mm Type 1 Granular
Assumed CBR = 3 %.
Handbook" (2nd Edition 2007).
"Concrete Hardstanding Design
Based on Britpave Guidance
CS2
3.7
5
ACCESS SHUTTERS AND FLOOD BARRIER TO ARCHITECT'S DETAILS
EF
EF EFE
F
EF
EF
EF EF
EF
EF
EF EF
EF
equipment (by others).
Detector loop and entry
and carriageway equals 100mm (by others).
at which level difference between footway
Retaining structure to be provided until point
13001-MASTER PLANS
equipment (by others).
Detector loop and exit
require a Section 278 Agreement.
approval from Leeds City Council (LCC) and
Works within the Public Highway are subject to 8.
and procure these works accordingly.
whether diversion / protection works are necessary
relevant Statutory Undertakers to determine
It is the Contractor's responsibility to liaise with the 7.
commencement of the works.
location of any buried services prior to the
The Contractor is to confirm the presence and
information should be considered to be incomplete.
information cannot be guaranteed and the
information and record plans. The accuracy of this
footway. The services shown are based on survey
Statutory Utilities are present within the existing 6.
the existing access S278 works required.
Refer to Drawing WP-ARP-CH-606 for details of 5.
and details of the new access.
Refer to Drawing WP-ARP-CH-604 for sections 4.
hard landscaping within the development site.
Refer to Drawing WP-ARP-CH-601 for details of 3.
All levels are in metres above Ordnance Datum.2.
All dimensions are in metres.1.
Notes:
P14
3.7
5
29.611 +
29.611 +
29.611 +
29.611 +
10.0
%
10.0
%
(1 in 1
2)
8.3
%
(1 in 1
2)
8.3
%
(1 in 4
0)
2.5
%
(1 in 4
0)
2.5
%
(1 in 4
0)
2.5
%
( 1 in 4
0)
2.5
%
2.00
5.07
R
8.50
R
5.00R
2.00
R
the future Whitehall Road widening scheme.
ensure the retaining wall is compatible with
wall. The gradient has been designed to
1:18 ramp to be provided against retaining
0.30
0.50
0.63
0.5
80
0.9
10
adopted Public Highway.
Proposed boundary of
Existing Statutory Utilities.
Agreement).
Boundary Boundary (subject to Section 38
Proposed Public (adopted) Highway
Boundary / Development Site Boundary
Existing Public (adopted) Highway
50 x 150 EF Kerb.
half lengths.
Upstand). Channel sections to be cut to
125 x 150 Channel Square (0mm
Upstand).
125 x 150 Bull Nosed Kerb (Max. 6mm
Gradient).
125 Half Battered Drop Kerb (1:9
Upstand).
125 x 255 Half Battered Kerb (100mm
Key:
Access Ramp Section A-A - Scale 1:50
A
A
A1
1
2
3
4
5
6
7
8
9
10
11
A B C D E F G H I J K L M N
Do not scale
Job No
Discipline
Drawing No Issue
Job Title
Client
© Arup
Issue Date By Chkd Appd
Drawing Status
Scale at A1