l t r gld4-2s
TRANSCRIPT
![Page 1: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/1.jpg)
LTR with NID
![Page 2: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/2.jpg)
LTR with NID
Loopless Trigger Radar (LTR) with Non Invasive Dectector (NID)
![Page 3: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/3.jpg)
LTR with NIDN
ID w
ith L
TR
Artists impression
![Page 4: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/4.jpg)
LTR with NID
Why Non Invasive Detection ?
Less installation costs because it is not necessary
to install loops in the road surface.
No problems with poor road surface.
The road doesn’t have to be blocked during installation,
which means more safety for both traffic and installation
team.
The percentage of successful capturing offenses
is high!
This means highly reliable equipment and due to the
use of a digital camera faster processing of offenses.
![Page 5: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/5.jpg)
LTR with NID
LTR set-up for speed measurements
![Page 6: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/6.jpg)
LTR with NID
LTR set-up for single or multiple lanes
![Page 7: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/7.jpg)
LTR with NID
LTR on overhead mast arm
![Page 8: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/8.jpg)
LTR with NID
Vx
A B C
Start measurement at A
Triggerpoint at B
End measurement C
LTR vehicle measurement The footprint length can vary from roughly 6 to 25 meters depending on different installation situations.
Receding vehicle
![Page 9: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/9.jpg)
LTR with NID
Vx
C B AApproaching vehicle
LTR vehicle measurement The footprint length can vary from roughly 6 to 25 meters depending on different installation situations.
Start measurement at A
Triggerpoint at B
End measurement C
![Page 10: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/10.jpg)
LTR with NID
LTR virtual loop
![Page 11: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/11.jpg)
LTR with NID
A-speed V-speedLTR 1
NID operation
![Page 12: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/12.jpg)
LTR with NID
NID in MCS or GTC-D
Up to 4 individual lanes can be
connected to the Non Invasive
Detector (NID).
The NID is pin compatible with the
GLD4-2S detector and can be
used in a MCS or GTC-D.
![Page 13: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/13.jpg)
LTR with NID
LTR speed monitoring - latest design
![Page 14: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/14.jpg)
LTR with NID
LTR speed only – test results
![Page 15: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/15.jpg)
LTR with NID
LTR set-up for red light monitoring
![Page 16: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/16.jpg)
LTR with NID
LTR red light - results
![Page 17: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/17.jpg)
LTR with NID
LTR testing in Switzerland with the approval institute
![Page 18: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/18.jpg)
LTR with NID
Testing in Switzerland with the approval institute
![Page 19: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/19.jpg)
LTR with NID
CE approval
completed for Europe
PTT approval
completed for Europe
FCC and CN approval
to be completed in week 16,
2006
![Page 20: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/20.jpg)
LTR with NID
Reference tests
![Page 21: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/21.jpg)
LTR with NID
Reference tests
![Page 22: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/22.jpg)
LTR with NID
Front measurement set-up Switzerland
![Page 23: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/23.jpg)
LTR with NID
LTR set-up
![Page 24: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/24.jpg)
LTR with NID
Rear measurement set-up USA (Beverly Hills)
![Page 25: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/25.jpg)
LTR with NID
LTR alignment camera
![Page 26: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/26.jpg)
LTR with NID
Front measurement set-up Switzerland
![Page 27: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/27.jpg)
LTR with NID
Front measurement set-up Switzerland - alignment
![Page 28: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/28.jpg)
LTR with NID
Front measurement set-up Switzerland - photopoint
![Page 29: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/29.jpg)
LTR with NID
Front measurement set-up Switzerland - results
![Page 30: L T R GLD4-2S](https://reader034.vdocuments.net/reader034/viewer/2022050613/5a67dbc47f8b9aa6128b5583/html5/thumbnails/30.jpg)
LTR with NID
Protecting people in motion