l03 integration management

38
IS5540 Project Management & Quality IS5540 Project Management & Quality Assurance Assurance Week 3 - Project Integration Management Week 3 - Project Integration Management Schwalbe: Information Technology Project Management, Schwalbe: Information Technology Project Management, Chapter 4 Chapter 4 Adapted by Janet Yu, Frank Lo Adapted by Janet Yu, Frank Lo

Upload: mcchan52

Post on 30-Oct-2014

37 views

Category:

Documents


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: L03 integration management

IS5540 Project Management & Quality IS5540 Project Management & Quality AssuranceAssurance

Week 3 - Project Integration ManagementWeek 3 - Project Integration Management

Schwalbe: Information Technology Project Management, Schwalbe: Information Technology Project Management, Chapter 4Chapter 4

Adapted by Janet Yu, Frank LoAdapted by Janet Yu, Frank Lo

Page 2: L03 integration management

Story of Airbus

The Airbus A380 megajet project was two years behind schedule in Oct. 2006 – expected loss of $6.1 billion over the next four years

Reason: integration management problems Before 2000, Airbus was a loose consortium of aerospace

companies in several countries In 2000, decided to go-ahead with the A380 project & transformed

into an “integrated” company However, Design Center in Germany used an earlier version a

design software; the assembly plant used the latest version Design specs cannot flow Result: Pre-assembled bundles (from Germany) containing some

cabin wiring didn’t fit properly into the plane (assembly in France)

2

*Matlack, Carol. “First, Blame the Software,” BusinessWeek Online (October 5, 2006).

Page 3: L03 integration management

3

Learning Objectives Understand the importance of project

integration management and the processes involved

Learn how to apply different project selection methods to project selection

Describe in detailthe Project Charterthe Project Management PlanChange Control

Page 4: L03 integration management

PMI Framework: 9 Knowledge Areas

Integration

ScopeTime Cost

Quality

PeopleCommunication

Risk

Procurement

4

Page 5: L03 integration management

5

Why Project Integration Management

The key to overall project successProject managers must coordinate all of the

other knowledge areas throughout a project’s life cycle

Many new project managers have trouble looking at the “big picture” and want to focus on too many details

Page 6: L03 integration management

So you know why Integration Management is so important ?!

Now more details ……

Page 7: L03 integration management

7

Project Integration Management Processes

Develop the project charter: working with stakeholders to create the document that formally authorizes a project—the charter

Develop the project management plan: coordinating all planning efforts to create a consistent, coherent document—the project management plan

Direct and manage project execution: carrying out the project management plan by performing the activities included in it

Page 8: L03 integration management

8

Project Integration Management Processes (continued)

Monitor and control the project work: overseeing project work to meet the performance objectives of the project

Perform integrated change control: coordinating changes

Close the project: finalizing all project activities to formally close the project

Page 9: L03 integration management

Before We Have a Project….Project Selection Methods….

9

Page 10: L03 integration management

10

Strategic Planning and Project Selection

Strategic planning involves determining long-term objectives, predicting future trends, and projecting the need for new products and services

As part of strategic planning, organizations:1. Identify potential projects2. Use realistic methods to select which projects to work

on3. Formalize project initiation by issuing a project

charter

Page 11: L03 integration management

11

Methods for Selecting Projects There are usually more projects than available

time and resources to implement them Methods for selecting projects include:

1. Performing net present value (NPV) or other financial analyses

2. Using a weighted scoring model3. Implementing a balanced scorecard

But for some projects, they may be selected because of a directive from management or Government

Page 12: L03 integration management

12

Financial Analysis of Projects

Financial considerations are often an important consideration in selecting projects

Four primary methods for determining the projected financial value of projectsNet present value (NPV) analysisReturn on investment (ROI)Internal Rate of Return (IRR)Payback analysis

Page 13: L03 integration management

Discounted Cash FlowMoney in the future is worth less than money

received todayThe future value (FV) is calculated as

FV = PV(1+i)n where i is the interest rate, PV the present value, n the no. of periods

PV = FV/(1+i)n

Example: FV of $2000 is $2315.25 if i = 5%, n = 3

13

Page 14: L03 integration management

14

Net Present Value Analysis

Net present value (NPV) analysis is a method of calculating the expected net monetary gain or loss from a project by discounting all expected future cash inflows and outflows to the present point in time

= Total discounted benefits – Total discounted costs

Page 15: L03 integration management

15

Choose A Project to Invest

NPV of Project A = 87K; NPV of Project B = 57K ??NPV of Project A = -87K; NPV of Project B = 57K ??NPV of Project A = -87K; NPV of Project B = -57K ??

Page 16: L03 integration management

16

Net Present Value Analysis

The higher the NPV, the betterProjects with a positive NPV should

be considered if financial value is a key criterion

Page 17: L03 integration management

Figure 4-4: JWD Consulting NPV Example

Multiplyby thediscountfactor eachyear, then take cum.benefits –costs toget NPV

Note: See the template called business_case_financials.xls

17

Page 18: L03 integration management

18

Return on Investment (ROI)

ROI = (total discounted benefits - total discounted costs) / discounted costs

The higher the ROI, the better

Page 19: L03 integration management

Internal Rate of Return (IRR)Rate at which the total discounted benefits

and total discounted costs are equalThe discount rate when NPV = 0Difficult to calculateThe higher the better

19

Page 20: L03 integration management

20

Payback Analysis

The payback period is the amount of time it will take to recoup, in the form of net cash inflows, the total dollars invested in a project

Time when NPV = 0The shorter the better

Page 21: L03 integration management

Figure 4-5: Charting the Payback Period

21

Page 22: L03 integration management

Figure 4-4: JWD Consulting NPV Example

Multiplyby thediscountfactor eachyear, then take cum.benefits –costs toget NPV

Note: See the template called business_case_financials.xls

22

Page 23: L03 integration management

23

Weighted Scoring Model A weighted scoring model is a tool that provides

a systematic process for selecting projects based on many criteria

1. Identify criteria important to the project selection process

2. Assign weights (percentages) to each criterion so they add up to 100%

3. Assign scores to each criterion for each project4. Multiply the scores by the weights and get the total

weighted scores The higher the weighted score, the better

Page 24: L03 integration management

Figure 4-6: Sample Weighted Scoring Model for Project Selection

24

Page 25: L03 integration management

25

Implementing a Balanced ScorecardTo help select and manage projects that align with

business strategyA balanced scorecard:

Is a methodology that converts an organization’s value drivers to a series of defined metrics. Examples of such drivers are

customer serviceInnovationoperational efficiencyfinancial performance

See www.balancedscorecard.org for more information

Page 26: L03 integration management

Quick Quiz

Project A Project B Choose

NPV $87K $57K

ROI 50% 40%

IRR 12% 15%

Payback Period 15 months 12 months

26

Page 27: L03 integration management

Project Charter ….

27

Page 28: L03 integration management

28

Project ChartersAfter deciding what project to work on, it is

important to let the rest of the organization know, especially the key stakeholders

A project charter is a document that formally recognizes the existence of a project and provides direction on the project’s objectives and management

Page 29: L03 integration management

29

29

Page 30: L03 integration management

30

30

Page 31: L03 integration management

Sample Project CharterProject Title and Description

What is the project ? Brief background and purpose

Project Manager Assigned and Authority LevelWho is given authority to lead the project. Can he/she determine budget, schedule, staffing etc??

Business NeedWhy is the project being done?

Project Justification Business case

Resources Pre-assignedStakeholders (and their requirements)

Requirements related to both project and product

Product Description/DeliverablesList of the deliverables and their descriptions

Constraints and AssumptionsSigned and Approved By

Has to be a person from senior management

Another Sample Project Charter

31

Page 32: L03 integration management

Project Management Plan ….

32

Page 33: L03 integration management

33

Project Management PlansA project management plan is your plan on how to

manage the project, e.g. How do you define the scope? How to deal with changes? How to do estimation? How to identify risks? How to communicate with stakeholders?

Plans created in the other knowledge areas are subsidiary parts of the overall project management plan, like

Scope Management Plan Staffing Management Plan Etc.

Page 34: L03 integration management

Integrated Change Control….

34

Page 35: L03 integration management

35

Change Control SystemThe Project Management Plan provides the

baseline for identifying and controlling project changes

A baseline is the approved project management plan plus approved changesUsed for comparing with actual

A formal, documented process that describes when and how official project documents and work may be changed

Describes who is authorized to make changes and how to make them

Page 36: L03 integration management

36

Change Control Board (CCB)A formal group of people responsible for

approving or rejecting changes on a projectCCBs provide guidelines for preparing change

requests, evaluate change requests, and manage the implementation of approved changes

Includes stakeholders from the entire organization

Page 37: L03 integration management

37

Configuration ManagementPart of change managementEnsures that the descriptions of the project’s

products are correct and complete, including their support documentation

Configuration management specialistsidentify and document configuration requirementscontrol changesrecord and report changesaudit the products to verify conformance to

requirements

Page 38: L03 integration management

38

RevisionProject Selection Methods

NPVROIIRRPayback periodWeighted Scoring ModelBalanced Scorecard

Project CharterProject Management Plan Integrated Change Control

BaselineCCBConfiguration Management