la d a e lot 1 im - kirkland, washingtonpdfs/... · la d a e lot 1 im landscape design intent...

7
A10.2 LANDSCAPE LOT 1 1”=20’-0” content scale LA D A E LOT 1 IM LANDSCAPE DESIGN INTENT FAIRFIELD'S VILLAGE AT TOTEM LAKES APARTMENT HOMES PROJECT IS LOCATED WITHIN AN URBAN CONTEXT AND THE LANDSCAPE RESPONDS BY PROVIDING INTIMATE SPACES FOR THE RESIDENTS TO RELAX AND REFLECT. THE PERIMETER LANDSCAPE IS INTENDED TO BLEND INTO THE SURROUNDING COMMUNITY CONTEXT AND STREETSCAPE CHARACTER. THE INTERIOR SPACES ARE LINKED TO CENTRAL COMMONS AND RECREATION FACILITIES WITH EASY CIRCULATION FROM ALL PARTS OF THE SITE. WHILE THE PERIMETER LANDSCAPE IS INTENDED TO BLEND INTO THE SURROUNDING CONTEXT, DISTINCTLY LANDSCAPED COURTYARD AREAS WILL PROVIDES THE RESIDENCE WITH ACTIVE USE OPPORTUNITIES, SUCH AS SWIMMING AND BARBECUING. THE LANDSCAPING ARRANGEMENT PROVIDES ACCENTS AROUND THE POOL AND PROJECT ENTRY, YET ALLOWS SOLAR ACCESS FOR SUNBATHING. THE SELECTION OF LANDSCAPE MATERIALS HAS A SIGNIFICANT IMPACT ON WATER CONSUMPTION AND MAINTENANCE REQUIREMENTS, HELPS DETERMINE INDOOR AND EXTERIOR COMFORT, AND CONTRIBUTES TO THE ATTRACTIVENESS OF THE COMMUNITY. PREDOMINANTLY, EVERGREEN TREE ARE PROPOSED TO FRAME THE SPACES WITH YEAR ROUND COLOR AND ACCENT TREES AT ENTRYWAYS AND OPEN SPACES TO ADD CHARACTER. SHRUBS ARE PROPOSED ADJACENT TO THE APARTMENTS TO TRANSITION AND SCREEN PRIVATE PATIO AREAS. WE WILL UTILIZE STRATEGIES TO MINIMIZE WATER USE BY UTILIZING NATIVE OR DROUGHT RESISTANT PLANTS. NON-NATIVE VEGITATION SHALL NE NON-INVASIVE. PLANT SPECIES SHALL BE SELECTED THAT WILL PRODUCE MINIMAL ORGANIC WASTE. THE LANDSCAPE PLANTING WILL COMPLY WITH REQUIREMENTS OF THE CITY OF KIRKLAND, WASHINGTON. TREES SHALL NORMALLY BE NOT LESS THEN 15-GALLON. ALL PLANTING AREAS, EXCEPT TURF AREAS, SHALL BE TOP DRESSED WITH WOOD MULCH. COURTYARD PAVERS SHALL BE PERMEABLE AND ALLOW FOR EASY FLOW AND DRAINAGE OF WATER. ROOF DRAINAGE SHALL BE ROUTED TO LANDSCAPE AREAS OR FILTERS. SPA SEATING AREA W/ FIREPLACE AND WOOD DECKING STAIR ACCESS TO STREET ARBOR AND RAILING AT EDGE OF COURTYARD SEATING AREA W/ BBQs COURTYARD 'B' RESIDENTIAL LOBBY BBQ / TRELLIS FIREPIT/ TRELLIS / / COURTYARD 'C' LAWN BOCCE PRIVATE PATIOS SEATING AREA W/ BBQ, TRELLIS, AND WOOD DECKING ARBOR AT EDGE OF COURTYARD ACCENT TREE COURTYARD 'A' SEATING AREA W/ BBQs STAIR ACCESS TO STREET ARBOR AND RAILING AT EDGE OF COURTYARD PRIVATE PATIOS DOG LAWN RAISED PLANTERS LAWN SPECIMEN TREE COURTYARD 'D' SEATING AREA W/ BBQs AND JUMBRELLA SHADE FIREPIT/ TRELLIS LAWN SPECIMEN TREE BBQ EVERGREEN CANOPY TREE RAISED PLANTERS ACCENT TREE POOL 18'X60' FAIRFIELD RESIDENTIAL 5638.00 08.01.2016 project date 70

Upload: others

Post on 11-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LA D A E LOT 1 IM - Kirkland, WashingtonPDFs/... · la d a e lot 1 im landscape design intent fairfield's village at totem lakes apartment homes project is located within an urban

A10.2LANDSCAPE LOT 1 1”=20’-0”content scale

LA D A E LOT 1IM

LANDSCAPE DESIGN INTENT

FAIRFIELD'S VILLAGE AT TOTEM LAKES APARTMENT HOMESPROJECT IS LOCATED WITHIN AN URBAN CONTEXT AND THELANDSCAPE RESPONDS BY PROVIDING INTIMATE SPACES FORTHE RESIDENTS TO RELAX AND REFLECT. THE PERIMETERLANDSCAPE IS INTENDED TO BLEND INTO THE SURROUNDINGCOMMUNITY CONTEXT AND STREETSCAPE CHARACTER. THEINTERIOR SPACES ARE LINKED TO CENTRAL COMMONS ANDRECREATION FACILITIES WITH EASY CIRCULATION FROM ALLPARTS OF THE SITE.

WHILE THE PERIMETER LANDSCAPE IS INTENDED TO BLENDINTO THE SURROUNDING CONTEXT, DISTINCTLY LANDSCAPEDCOURTYARD AREAS WILL PROVIDES THE RESIDENCE WITHACTIVE USE OPPORTUNITIES, SUCH AS SWIMMING ANDBARBECUING. THE LANDSCAPING ARRANGEMENT PROVIDESACCENTS AROUND THE POOL AND PROJECT ENTRY, YETALLOWS SOLAR ACCESS FOR SUNBATHING.

THE SELECTION OF LANDSCAPE MATERIALS HAS A SIGNIFICANTIMPACT ON WATER CONSUMPTION AND MAINTENANCEREQUIREMENTS, HELPS DETERMINE INDOOR AND EXTERIORCOMFORT, AND CONTRIBUTES TO THE ATTRACTIVENESS OFTHE COMMUNITY. PREDOMINANTLY, EVERGREEN TREE AREPROPOSED TO FRAME THE SPACES WITH YEAR ROUND COLORAND ACCENT TREES AT ENTRYWAYS AND OPEN SPACES TO ADDCHARACTER. SHRUBS ARE PROPOSED ADJACENT TO THEAPARTMENTS TO TRANSITION AND SCREEN PRIVATE PATIOAREAS. WE WILL UTILIZE STRATEGIES TO MINIMIZE WATER USEBY UTILIZING NATIVE OR DROUGHT RESISTANT PLANTS.NON-NATIVE VEGITATION SHALL NE NON-INVASIVE. PLANTSPECIES SHALL BE SELECTED THAT WILL PRODUCE MINIMALORGANIC WASTE.

THE LANDSCAPE PLANTING WILL COMPLY WITH REQUIREMENTSOF THE CITY OF KIRKLAND, WASHINGTON. TREES SHALLNORMALLY BE NOT LESS THEN 15-GALLON. ALL PLANTINGAREAS, EXCEPT TURF AREAS, SHALL BE TOP DRESSED WITHWOOD MULCH.

COURTYARD PAVERS SHALL BE PERMEABLE AND ALLOW FOREASY FLOW AND DRAINAGE OF WATER. ROOF DRAINAGE SHALLBE ROUTED TO LANDSCAPE AREAS OR FILTERS.

SPASEATING AREA W/FIREPLACE ANDWOOD DECKING

STAIR ACCESSTO STREET

ARBOR ANDRAILING AT EDGEOF COURTYARDSEATING

AREA W/ BBQsCOURTYARD 'B'

RESIDENTIAL LOBBY

BBQ /TRELLIS

FIREPIT/TRELLIS

//

COURTYARD 'C'

LAWN BOCCE

PRIVATEPATIOS

SEATING AREA W/BBQ, TRELLIS, ANDWOOD DECKING

ARBOR AT EDGEOF COURTYARD

ACCENTTREE

COURTYARD 'A'

SEATINGAREA W/ BBQs

STAIR ACCESSTO STREET

ARBOR ANDRAILING AT EDGEOF COURTYARD

PRIVATEPATIOS

DOGLAWN

RAISEDPLANTERS

LAWN

SPECIMENTREE

COURTYARD 'D'

SEATING AREA W/BBQs ANDJUMBRELLA SHADE

FIREPIT/TRELLIS

LAWN

SPECIMEN TREE

BBQ

EVERGREENCANOPY TREE

RAISEDPLANTERS

ACCENTTREE

POOL18'X60'

FAIRFIELDRESIDENTIAL

5638.00 08.01.2016project date 70

Page 2: LA D A E LOT 1 IM - Kirkland, WashingtonPDFs/... · la d a e lot 1 im landscape design intent fairfield's village at totem lakes apartment homes project is located within an urban

A10.3LANDSCAPE LOT 2 1”=20’-0”content scale

LA D A E LOT 2IM

IRRIGATION DESIGN INTENT STATEMENT

THE LANDSCAPE IRRIGATION WILL COMPLY WITH THE CITY OFKIRKLAND REQUIREMENTS AND WATER ORDINANCES FOR ALLPLANTING AREAS. THE PURPOSE IS TO DESCRIBE THE IRRIGATIONDESIGN INTENT FOR OWNER'S APPROVAL AND THE APPROVAL OFOWNER'S OPERATIONS AND MAINTENANCE GROUP.

ALL IRRIGATION SYSTEM WILL BE FULLY AUTOMATIC OPERATINGSYSTEMS UTILIZING ELECTRICALLY OPERATED CONTROLLERS ANDVALVES.

SHRUB AND TURF AREAS AND TREES WILL BE IRRIGATED BYSEPARATE VALVES. LOW VOLUME IRRIGATION SYSTEM (DRIPIRRIGATION SYSTEM) WILL BE USED FOR SHRUB, GROUND COVERAREAS AND TREES. TURF AREAS, IF ANY, WILL BE IRRIGATED POP-UPSPRAY IRRIGATION SYSTEM.

SHRUB AND GROUNDCOVER AREAS WILL BE IRRIGATED WITHLANDSCAPE DRIPLINE. TREES WILL BE IRRIGATED WITH BUBBLERS.

ALL POTS WILL BE IRRIGATED BY DRIP OR THE ALTERNATIVESUB-IRRIGATION SYSTEM. DRAINAGE SHALL BE ROUTED TOLANDSCAPE AREAS OR FILTERS.

TRELLIS/ ARCADE

WATERFEATURE

OVERLOOK

SPA

FIRE PIT /SEATING AREA

SPECIMENTREE

RAISEDPLANTER

PRIVATEPATIO

LAWN

DOGLAWN

BBQ / SEATINGAREA W/ TRELLIS

DDDODOOGOGGG

COURTYARD 'E'

FAIRFIELDRESIDENTIAL

5638.00 08.01.2016project date 71

Page 3: LA D A E LOT 1 IM - Kirkland, WashingtonPDFs/... · la d a e lot 1 im landscape design intent fairfield's village at totem lakes apartment homes project is located within an urban

A11.1RESPONSE #1content

#001

#001

#001

#001

#001

#001

#001#001

#001#001

#001 #001 #001#001 #001 #001#001 #001 #001 #001 #001 #001

#001 #001 #001#001 #001 #001#001 #001 #001 #001 #001 #001

#001 #001 #001 #001 #001 #001 #001

#001 #001 #001 #001 #001 #001 #001

#001 #001#001

#001 #001

#001

#001 #001

#001 #001 #001

#001 #001

#001 #001 #001#001 #001 #001 #001 #001

#001

#001

#001

#001

#001

6

2

1THEATRE35,000 SF

RESIDENTIAL PARKING

337 SPACES

PROPERTY LINE

PROPE

RTY

LINE

PROPERTY LINE

PRO

PERT

Y LI

NE

PRO

PERT

Y LI

NE

RESIDENTIAL LOBBY

COURTYARD

COURTYARDCYBERCAFE

DOGWASH

CYBERCAFE

RESIDENTIAL LOBBY

1 BD

1 BD 1 BD ST

ST

ST

ST

ST

ST

ST

ST

STST 1 BD1 BD

1 BD

1 BD

1 BD 1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

3 BD3 BD

3 BD

1 BD

1 BD

1 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD 2 BD

2 BD 2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

STORAGE

STORAGE

THEATREEGRESS

OPEN TO FITNESSBELOW

OPEN TO FITNESSBELOW

POOL EQUIPMENT

POOL ABOVE

STORAGE

STORAGE

STORAGE

TRTR

TR

TR

TR

SECTION 2

SECTION 1

SE

CTI

ON

3

STORM WATER MANAGEMENT DESIGN INTENT

STORMWATER OR “URBAN RUNOFF” CONTAINS POLLUTANTS THAT CANLEAD TO THE DETERIORATION OF DOWNSTREAM “RECEIVING WATERS.”RAINWATER SCRUBS POLLUTANTS FROM THE AIR AND PICKS UPADDITIONAL POLLUTANTS AS IT RUNS OVER STREETS, ROOFS ANDLANDSCAPED AREAS. TYPICAL URBAN POLLUTANTS INCLUDE HEAVYMETALS FROM BRAKE PADS AND ZINC DOWNSPOUTS; PETROLEUMPRODUCTS FROM CARS; FERTILIZERS AND PESTICIDES FROM LANDSCAPEDAREAS; AND PCBS AND MERCURY WASHED FROM THE AIR. THESEPOLLUTANTS CAN CAUSE TOXIC REACTIONS IN AQUATIC LIFE. IN ADDITION,BACTERIA AND VIRUSES IN URBAN RUNOFF CAN CAUSE HUMAN ILLNESSESFROM DIRECT CONTACT, INHALATION OR THE DRINKING OF RUNOFF.

THE DESIGN SHALL EXPLORE OPPORTUNTITIES TO ACCOMMODATE THEFOLLOWING MEASURES:

1. INSTALL A ROOF DRAIN BIOFILTRATION SYSTEM IN SETBACK AREAS THATRECEIVES AND FILTERS RUNOFF.

2. NOT ALLOW ANY RUNOFF TO ENTER UNDERGROUND PARKING. IF THEREARE ABOVE GROUND PARKING LOTS, TREAT RUNOFF BEFORE IT ENTERSTHE STORM DRAIN SYSTEM.

3. INSTALL SUFFICIENT BIORETENTION (SWALES) WITHOUT CURBS OR WITHCURB NOTCHES IN LANDSCAPE AREAS ADJACENT TO OR NEAR PARKINGLOTS AND MOTOR COURTS TO INCREASE VEGETATION AND ALLOW RUNOFFTO ENTER. ALLOW FOR TREATMENT OF ¾ INCHES OF RUNOFF OR 0.2INCHES PER HOUR FROM THE PARKING LOT AND TRIBUTARY AREAS.

4. USE PERMEABLE MATERIALS.

5. ROUTE ANY DRIVEWAY RUNOFF TO A ROADSIDE OR DRIVEWAYADJACENT BIOSWALE.

6. DO NOT USE COPPER OR ZINC FOR ROOFING, DOWNSPOUTS, GUTTERSOR OTHER EXPOSED SURFACES, AND DO NOT USE ROOFING MATERIALSWITH TAR PAPERS OR OTHER PETROLEUM-BASED SEALERS. USE ROOFMATERIALS THAT ARE INERT, SUCH AS TILE.

7. INSTALL POROUS PAVEMENT, SWALES, BIOFILTERS AND WATER FILTERS.

BEST MANAGEMENT PRACTICES (BMPS) MAY BE EMPLOYED TO:

• SLOW THE RATE OF RUNOFF BY EXTENDING THE DETENTION TIMES OF RUNOFF ON SITE TO ENCOURAGE THE SETTLING OF PARTICLES, THESORPTION (ATTACHMENT) OF POLLUTANTS ONTO PARTICLES, OR NUTRIENT (PHOSPHORUS AND NITROGEN) UPTAKE BY VEGETATION.

• INCREASE INFILTRATION (SOAKING INTO SOILS TO FILTER AND REDUCE RUNOFF) AND/OR EVAPOTRANSPIRATION (PLANT AND SOILEVAPORATION TO REDUCE RUNOFF).

• FILTER RUNOFF USING TARGETED FILTER MEDIA OR VEGETATION THAT TRAPS OR BREAKS DOWN MANY CONTAMINANTS.

• PREVENT POLLUTANTS FROM BEING PICKED UP AND TRANSPORTED BY STORMWATER.

• REDUCE OR ELIMINATE DRY WEATHER FLOWS (IRRIGATION RUNOFF, PAVEMENT WASHING, ETC.).

• IMPROVE THE SITE’S AESTHETICS AND INCREASE WATER CONSERVATION.

• BIORETENTION (DEPRESSED LANDSCAPED AREAS) CAN BE USED IN SURFACE PARKING LOTS AND ROAD MEDIANS TO CAPTURE STORMWATERAND ALLOW IT TO SLOWLY DRAIN OR SOAK IN. EXCESS RUNOFF DRAINS TO THE STORM DRAIN SYSTEM VIA A VERTICAL INTAKE PIPE.

• RAISED PLANTERS ON PODIUM DECKS CAN BE IDENTIFIED TO ACT AS FLOW THROUGH PLANTERS.

• SWALES (SHALLOW SIDE-SLOPED GRASS LINED CHANNELS AND BIOSWALES (SWALES WITH VEGETATION, USUALLY ALLOWING FORTEMPORARY PONDING AND INCREASED INFILTRATION) CAN CHANNEL STORMWATER FROM IMPERVIOUS AREAS INTO THE STORM DRAINSYSTEM WHILE ALLOWING FOR SOME INFILTRATION, FILTRATION AND POLLUTANT BINDING BY SOILS AND UPTAKE BY PLANTS.

• UNDERGROUND PARKING CAN STOP POLLUTANTS FROM CONTACTING STORMWATER.

COURTYARD 'E'

BBQ /TRELLIS

Q /Q //////ISSLIII

COURTYARD 'B'COURTYARD 'D'

COURTYARD 'C'

COURTYARD 'A'

SPA

FIREPIT/TRELLIS LAWN BOCCE

DOGLAWN

FIREPIT/TRELLIS

LAWN

BBQ

POOL18'X60'

SPA

DOGLAWN

LAWN

How will storm water be handled in the project? What type of planting will be proposed at the courtyards? Will there be mostly above grade planters?

DRB COMMENT:

DESIGN TEAM RESPONSE:

FAIRFIELDRESIDENTIAL

5638.00 08.01.2016project date 72

Page 4: LA D A E LOT 1 IM - Kirkland, WashingtonPDFs/... · la d a e lot 1 im landscape design intent fairfield's village at totem lakes apartment homes project is located within an urban

A11.2RESPONSE #2content

Provide shadow study.

DRB COMMENT:

4:00 pm equinox 12:00 pm equinox 8:00 am equinox

sola

r ele

vatio

nso

lar e

leva

tion

sola

r ele

vatio

n

4:00 pm summer solstice 12:00 pm summer solstice 8:00 am summer solstice

4:00 pm winter solstice 12:00 pm winter solstice 8:00 am winter solstice

FAIRFIELDRESIDENTIAL

5638.00 08.01.2016project date 73

Page 5: LA D A E LOT 1 IM - Kirkland, WashingtonPDFs/... · la d a e lot 1 im landscape design intent fairfield's village at totem lakes apartment homes project is located within an urban

A11.3RESPONSE #3content

Request for updated plaza design. Would like to see a better relationship to human scale. Encourages articulation and modulation of the buildings surrounding the plaza. Consider recesses and areas for the public realm.

Refer to revised plaza layout including areas for outdoor seating adjacent to the retail spaces as well as programmed areas for gathering and lounging including a water feature.

DRB COMMENT:

DESIGN TEAM RESPONSE:

FAIRFIELDRESIDENTIAL

5638.00 08.01.2016project date 74

Page 6: LA D A E LOT 1 IM - Kirkland, WashingtonPDFs/... · la d a e lot 1 im landscape design intent fairfield's village at totem lakes apartment homes project is located within an urban

A11.4RESPONSE #4content

Request for updated plaza design. Would like to see a better relationship to human scale. Encourages articulation and modulation of the buildings surrounding the plaza. Consider recesses and areas for the public realm.

Refer to revised plaza layout including areas for outdoor seating adjacent to the retail spaces as well as programmed areas for gathering and lounging including a water feature.

DRB COMMENT:

DESIGN TEAM RESPONSE:

FAIRFIELDRESIDENTIAL

5638.00 08.01.2016project date 75

Page 7: LA D A E LOT 1 IM - Kirkland, WashingtonPDFs/... · la d a e lot 1 im landscape design intent fairfield's village at totem lakes apartment homes project is located within an urban

The proposed west façade behind the Chase Bank still feels institutional with a large expanse of hardie board The white building is too much of a focal point. Also can the project have that many windows where the building is in close proximity to the property line and be in conformance with the building code?

A revised concept in this area includes repositioning the single loaded corridor to the courtyard side to allow for better articulation of this prominent façade. The prior single flat plane has been redesigned to allow for setbacks that create balcony conditions. The materiality has been enhanced with the introduction of brick and the elimination of hardie board at this location. The fenestrations at the parking levels continues the rhythm of the residential levels above and the corner has been better defined. The setback from the property line has been increased from 5 to 10 feet to allow for a higher percentage of openings allowed.

DRB COMMENT: DESIGN TEAM RESPONSE:

A11.5RESPONSE #5content

new setbackscreating balconys

brick replaceshardie board

garagescreens

redesignredesign

metal panel(oxidized brown)

new setbacks

BEFORE

AFTER

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001 #001

#001

#001

#001 #001 #001

#001 #001 #001

#001 #001 #001#001 #001 #001#001 #001 #001

#001

#001

#001

#001

#001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001 #001 #001

#001

#001#001

#001#001

#001#001#001

#001#001

#001#001

#001#001#001

#001#001

#001#001

#001#001#001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001

#001#001

#001#001

#001#001#001

#001 #001 #001 #001 #001#001

#001

#001

#001

#001 #001#001 #001#001

#001

#001

5

39

3

3

36

37

38

2% S

LOPE

1

#001 #001

PRO

PERT

Y LI

NE

NG

EXISTINGBANK

RES.TRASH

5 FUTUREDENT PARKING

TRANSFORMERVAULT

RETAILELECT.

RETAILMPOE GAS

METER ROOM

RES.MPOE

1 BD

1 BD

2 BD

1 BD

1 BD

1 BD

1 BD

STORAGE

RETAIL

ACCESS & EGRESFOR BANKONLY

RETAILENTRY

RESIDENTIVEHICULA

UNIT ENTRY

UNIT ENTRY

UNIT ENTRY

Building with 10’ setback fromproperty line

FAIRFIELDRESIDENTIAL

5638.00 08.01.2016project date 76