la grange isgs #52 wetland mitigation bankla grange wetland mitigation bank general study area and...

10
LA GRANGE ISGS #52 WETLAND MITIGATION BANK Sequence #9579 Brown County, near La Grange, Illinois Primary Project Manager: Keith W. Carr Secondary Project Manager: Geoffrey E. Pociask SITE HISTORY C February 2000: ISGS was tasked by IDOT to conduct a Level II hydrogeologic assessment of the site. C January 2003: ISGS submitted a wetland banking instrument to IDOT. C January 2005: A Level II hydrogeologic characterization report was submitted to IDOT (ISGS Open-File Series 2005–02). C Fall 2005 and 2006: Extensive earthworks were undertaken by IDOT, including filling and plugging of several ditches, reshaping of the east levee, constructing a raised access road, and excavating a large basin in the north-central area of the site. C Summer 2011: Further earthworks were undertaken at the site. The former basin of Amelia Barker Lake was widened and the fill utilized for road construction. Similar to 2010, large magnitude and long-duration floods affected the site. The site remained flooded over most of its area from late April to early July. WETLAND HYDROLOGY CALCULATION FOR 2011 We estimate that the total area of the site that satisfied wetland hydrology criteria for greater than 5% of the growing season in 2011 was 578 ha (1,428 ac) out of a total site area of 666 ha (1,645 ac); 564 ha (1,393 ac) also satisfied wetland hydrology criteria for greater than 12.5% of the growing season, according to the 1987 Manual. Using the 2010 Midwest Region Supplement (U.S. Army Corps of Engineers 2010) to the 1987 Manual, we estimate that 575 ha (1,420 ac) satisfied wetland hydrology criteria for 14 or more consecutive days during the growing season. These estimates are based on the following factors: C The median date that the growing season begins in nearby Rushville, Illinois, is April 6, and the season lasts 208 days (MRCC 2011); 5% of the growing season is 10 days, and 12.5% of the growing season is 26 days, according to the 1987 Manual. According to methods outlined in the 2010 Midwest Region Supplement, we estimate that March 3 was the starting date of the 2011 growing season, based on measurements from an on- site soil-temperature data logger. C Total precipitation for the monitoring period at the Rushville, IL, weather station was 101% of normal. During the March to May period, precipitation was 92% of normal. As in previous years, large precipitation events upstream in the watershed led to widespread and sustained flooding of the site during this period. Precipitation in June, however, was 243% of normal, which contributed to sustained flooding into July. C In 2011, wells 41S and 42S satisfied wetland hydrology criteria for greater than 5% of the growing season and also for greater than than 12.5% of the growing season, 63

Upload: others

Post on 25-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

LA GRANGE ISGS #52WETLAND MITIGATION BANK Sequence #9579Brown County, near La Grange, IllinoisPrimary Project Manager: Keith W. CarrSecondary Project Manager: Geoffrey E. Pociask

SITE HISTORY

C February 2000: ISGS was tasked by IDOT to conduct a Level II hydrogeologicassessment of the site.

C January 2003: ISGS submitted a wetland banking instrument to IDOT.

C January 2005: A Level II hydrogeologic characterization report was submitted to IDOT(ISGS Open-File Series 2005–02).

C Fall 2005 and 2006: Extensive earthworks were undertaken by IDOT, including fillingand plugging of several ditches, reshaping of the east levee, constructing a raisedaccess road, and excavating a large basin in the north-central area of the site.

C Summer 2011: Further earthworks were undertaken at the site. The former basin ofAmelia Barker Lake was widened and the fill utilized for road construction. Similar to2010, large magnitude and long-duration floods affected the site. The site remainedflooded over most of its area from late April to early July.

WETLAND HYDROLOGY CALCULATION FOR 2011

We estimate that the total area of the site that satisfied wetland hydrology criteria for greaterthan 5% of the growing season in 2011 was 578 ha (1,428 ac) out of a total site area of 666 ha(1,645 ac); 564 ha (1,393 ac) also satisfied wetland hydrology criteria for greater than 12.5% ofthe growing season, according to the 1987 Manual. Using the 2010 Midwest RegionSupplement (U.S. Army Corps of Engineers 2010) to the 1987 Manual, we estimate that 575 ha(1,420 ac) satisfied wetland hydrology criteria for 14 or more consecutive days during thegrowing season. These estimates are based on the following factors:

C The median date that the growing season begins in nearby Rushville, Illinois, is April 6,and the season lasts 208 days (MRCC 2011); 5% of the growing season is 10 days,and 12.5% of the growing season is 26 days, according to the 1987 Manual. Accordingto methods outlined in the 2010 Midwest Region Supplement, we estimate that March 3was the starting date of the 2011 growing season, based on measurements from an on-site soil-temperature data logger.

C Total precipitation for the monitoring period at the Rushville, IL, weather station was101% of normal. During the March to May period, precipitation was 92% of normal. Asin previous years, large precipitation events upstream in the watershed led towidespread and sustained flooding of the site during this period. Precipitation in June,however, was 243% of normal, which contributed to sustained flooding into July.

C In 2011, wells 41S and 42S satisfied wetland hydrology criteria for greater than 5% ofthe growing season and also for greater than than 12.5% of the growing season,

63

Page 2: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

according to the 1987 Manual. According to the 2010 Midwest Region Supplement,wells 41S and 42S also satisfied wetland hydrology criteria for 14 or more consecutivedays during the growing season. Wells 2S and 14S did not satisfy wetland hydrologycriteria.

• Two long-duration flood events occurred during the growing season in 2011. Accordingto the U.S. Army Corps of Engineers gauge at the nearby La Grange lock and dam andone on-site data logger in a monitoring well (Well 41S), the site was inundated for aperiod sufficient to satisfy wetland hydrology criteria at an elevation of at least 134.10 m(439.96 ft) for greater than 5% of the growing season and at an elevation of at least133.50 m (437.99 ft) for greater than 12.5% of the growing season, according to the1987 Manual. According to the 2010 Midwest Region Supplement, surface-water levelsat the USACE gauge and the Well 41S data logger also satisfied wetland hydrologycriteria at an elevation of at least 133.90 m (439.30 ft) for 14 or more consecutive daysduring the growing season.

PLANNED FUTURE ACTIVITIES

C Additional flood-resistant data loggers will be added to the site in the Fall of 2011.

C Monitoring of hydrology will continue until no longer required by IDOT.

64

Page 3: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

La Grange Wetland Mitigation BankGeneral Study Area and Vicinity

from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle (USGS 1980)

contour interval is 10 feet

Illin

ois

Riv

er

La Moine River

j

site boundary

0

0

1 km

1 mi

Big Lake

HorseshoeLake

65

Page 4: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

!(

!(!(!(

!(!(!(

!(41S

42S

2S/M/L

14S/M/L

La Grange Wetland Mitigation BankEstimated Areal Extent of 2011 Wetland Hydrology

Map based upon Illinois National Agriculture Imagery Program (NAIP) digital orthophotograph, Cooperstown NE quarter quadrangle, taken August 8, 2010 (USDA-FSA 2010)

³

September 1, 2010 through August 31, 2011

0 500 m

0 2000 ft

2011 Wetland Hydrology>5% of growing season (1987 Manual)>12.5% of growing season (1987 Manual)14 days or more (2010 Midwest Region Supplement)site boundary

!( monitoring well(s)kj rain gauge

66

Page 5: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

La G

rang

e W

etla

nd M

itiga

tion

Ban

kSe

ptem

ber 1

, 201

0 th

roug

h O

ctob

er 1

, 201

1

131.

50

132.

00

132.

50

133.

00

133.

50

134.

00

134.

50

Sep 2010

Oct 2010

Nov 2010

Dec 2010

Jan 2011

Feb 2011

Mar 2011

Apr 2011

May 2011

Jun 2011

Jul 2011

Aug 2011

Sep 2011

Oct 2011

Elevation (in m referenced to NAVD, 1988)

Wat

er-L

evel

Ele

vatio

ns in

Sha

llow

Mon

itorin

g W

ells

Wel

l 2S

Wel

l 14S

Wel

l 41S

Wel

l 42S

Wel

l 41S

(logg

er)

67

Page 6: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

La G

rang

e W

etla

nd M

itiga

tion

Ban

kSe

ptem

ber 1

, 201

0 th

roug

h O

ctob

er 1

, 201

1

-2.0

-1.5

-1.0

-0.5 0.0

0.5

1.0

Sep 2010

Oct 2010

Nov 2010

Dec 2010

Jan 2011

Feb 2011

Mar 2011

Apr 2011

May 2011

Jun 2011

Jul 2011

Aug 2011

Sep 2011

Oct 2011

Depth (in m referenced to land surface)

Dep

th to

Wat

er in

Sha

llow

Mon

itorin

g W

ells

Wel

l 2S

Wel

l 14S

Wel

l 41S

Wel

l 42S

Wel

l 41S

(logg

er)

68

Page 7: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

La G

rang

e W

etla

nd M

itiga

tion

Ban

kSe

ptem

ber 1

, 201

0 th

roug

h O

ctob

er 1

, 201

1

127.

5

128.

0

128.

5

129.

0

129.

5

130.

0

130.

5

131.

0

131.

5

132.

0

132.

5

133.

0

133.

5

134.

0

134.

5

135.

0

Sep 2010

Oct 2010

Nov 2010

Dec 2010

Jan 2011

Feb 2011

Mar 2011

Apr 2011

May 2011

Jun 2011

Jul 2011

Aug 2011

Sep 2011

Oct 2011

Elevation (in m referenced to NAVD, 1988)

Wat

er-L

evel

Ele

vatio

ns a

t the

La

Gra

nge

USA

CE

Gau

ge a

nd a

n O

n-Si

te D

ata

Logg

er

Illin

ois

Riv

er a

tLa

Gra

nge

US

ACE

gaug

e

Illin

ois

Riv

erflo

od s

tage

at

US

ACE

gaug

e

Wel

l 41S

(logg

er)

69

Page 8: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

La G

rang

e W

etla

nd M

itiga

tion

Ban

kSe

ptem

ber 1

, 201

0 th

roug

h O

ctob

er 1

, 201

1

130.

5

131.

0

131.

5

132.

0

132.

5

133.

0

133.

5

134.

0

134.

5

Sep 2010

Oct 2010

Nov 2010

Dec 2010

Jan 2011

Feb 2011

Mar 2011

Apr 2011

May 2011

Jun 2011

Jul 2011

Aug 2011

Sep 2011

Oct 2011

Elevation (in m referenced to NAVD, 1988)

Wat

er-L

evel

Ele

vatio

ns in

Dee

per M

onito

ring

Wel

ls

Wel

l 2M

Wel

l 2L

Wel

l 14M

Wel

l 14L

70

Page 9: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

La G

rang

e W

etla

nd M

itiga

tion

Ban

kSe

ptem

ber 1

, 201

0 th

roug

h O

ctob

er 1

, 201

1

-1.0

-0.5 0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

Sep 2010

Oct 2010

Nov 2010

Dec 2010

Jan 2011

Feb 2011

Mar 2011

Apr 2011

May 2011

Jun 2011

Jul 2011

Aug 2011

Sep 2011

Oct 2011

Depth (in m referenced to land surface)

Dep

th to

Wat

er in

Dee

per M

onito

ring

Wel

ls

Wel

l 2M

Wel

l 2L

Wel

l 14M

Wel

l 14L

71

Page 10: LA GRANGE ISGS #52 WETLAND MITIGATION BANKLa Grange Wetland Mitigation Bank General Study Area and Vicinity from the USGS Topographic Series, Cooperstown, IL, 7.5-minute Quadrangle

La Grange Wetland Mitigation BankSeptember 2010 through August 2011

Graph last updated 10/31/2011

0

1

2

3

4

5

6

7

8

9

10

11

Sep

201

0

Oct

201

0

Nov

201

0

Dec

201

0

Jan

2011

Feb

2011

Mar

201

1

Apr

201

1

May

201

1

Jun

2011

Jul 2

011

Aug

201

1

Prec

ipita

tion

(inch

es)

Total Monthly Precipitation Recorded on Site and at Rushville, IL

monthly precipitation recorded at Rushville, IL (MRCC)

monthly precipitation recorded on site by ISGS

data incomplete

1971-2000 monthly 30% above average threshold at Rushville, IL (NWCC)

1971-2000 monthly average precipitation at Rushville, IL (NWCC)

1971-2000 monthly 30% below average threshold at Rushville, IL (NWCC)

on-site rain gauge removed 12/14/2010 installed 02/24/2011

72