LA PALOMA MSW TREATMENT PLANT
ClientMadrid City Government
Residents served540,000 residents
Processes• Treated waste (total): 245,567 t• Recovered materials (total): 28,795 t
• Pre-treatment of remaining waste: 12,789 t
• Packaging treatment: 16,006 t• Composting: 566 t of compost produced
2016 data
Treatment capacity• 219,000 t/year remaining waste• 36,500 t/year local entities
70.6 kt CO2 prevented