ladder assembly procedure

109
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting

Upload: hewitt

Post on 06-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

Belle II – New Collaborators Meeting. Ladder Assembly Procedure. Introduction. Overview of the assembly procedure for a Layer 6 ladder. Drawings and slides without HEPHY header are taken from Y. Onuki’s talk, presented at the 14 th B2GM in March 2013 Procedure recently tested @ IPMU - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Ladder Assembly Procedure

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Ladder Assembly Procedure

Belle II – New Collaborators Meeting

Page 2: Ladder Assembly Procedure

C. Irmler (HEPHY), Y. Onuki (IPMU)

Introduction

• Overview of the assembly procedure for a Layer 6 ladder.

• Drawings and slides without HEPHY header are taken from Y. Onuki’s talk, presented at the14th B2GM in March 2013

• Procedure recently tested @ IPMU• Pictures from test assembly and new ideas added

• Modification of some jigs and steps is in progress

25th April 2013 2

Page 3: Ladder Assembly Procedure

Ladder Assembly – Organization

Sharing of production: L3: Melbourne – 7 + spares (2 sensors

each) L4: Tata (at IPMU) – 10 + spares (3

sensors each) L5: HEPHY Vienna – 12 + spares (4

sensors each) L6: Tokyo (IPMU) – 16 + spares (5

sensors each)

Contract between Tata and IPMU is being prepared

Interest of Italian groups (ex-SuperB) to join ladder assembly

25th April 2013M.Friedl (HEPHY Vienna) 3

Page 4: Ladder Assembly Procedure

C. Irmler (HEPHY), Y. Onuki (IPMU)

Origami -zOrigami ce

Origami +z

Airex

DSSDs

Pitch adaptersfor bottom strips CF ribs

Pitch adapters and readout PCBof the backward edge sensor

Pitch adapters and readout PCB of the

forward edge sensor

Ladder 6 with Origami Readout

• Challenging procedure, several jigs needed for assembly

• Master drawings & jigs prepared by Y.Onuki25th April 2013 4

Page 5: Ladder Assembly Procedure

SVD ladder assembly flow

Forward assemblyBackward assembly

OrigamiBackward Forward

Glue forward and backward sensors onto ribs

Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them

Origami assembly

Attach Origami sensors to ribs

Origami PA gluing

time

←parallel(independenteach other)

←parallel (multiple sets of jigs)

Common Procedure

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 5

Page 6: Ladder Assembly Procedure

Common Proc.01:   Placing DSSD stopper

• testTable

Table 3DB

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 6

Page 7: Ladder Assembly Procedure

Common Proc.02:   Placing DSSD

• testTable

Table 3DB

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 7

Page 8: Ladder Assembly Procedure

Common Proc.03:   Removing DSSD stopper

• testTable

Table 3DB

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 8

Page 9: Ladder Assembly Procedure

Common Proc.04:   Aligning PA1 and PA2. Dispensing glue.

• testTable

Table 3DB

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 9

Page 10: Ladder Assembly Procedure

Common Proc.05:   Gluing PA1 and PA2

• testTable

Table 3DB

PA jigs will be modified!

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 10

Page 11: Ladder Assembly Procedure

Common Proc.06:   Wire bonding after removing PA1 and PA2-jig

• testTable

B Table 3D

Mechanical QA: Visual inspection of bonding wires.

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 11

Page 12: Ladder Assembly Procedure

Common Proc.07:   Assembly bench w/ FW&BW mount bracket

3DTable

Table

B

Calibrate coordinate system according to ladder mount position

BW ladder mount = Origin

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 12

Page 13: Ladder Assembly Procedure

Common Proc.08:   Placing DSSD(-z)

• test

3D

Table

TableB

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 13

Page 14: Ladder Assembly Procedure

Common Proc.09:   Placing DSSD(CE)

• test

3D

Table

TableB

Repeating Common Proc.01-6

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 14

Page 15: Ladder Assembly Procedure

Repeating Common Proc.01-6

Common Proc.10:   Placing DSSD(+z)

• test

3D

Table

TableB

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 15

Page 16: Ladder Assembly Procedure

Common Proc.11:   Removing Alignment-jig

• test

3DTable

Table

B

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 16

Page 17: Ladder Assembly Procedure

Common Proc.12:   Replacing FW part.

• test

3DTable

Table

B

Screw hole to fix the hybrid board

In this procedure, only replacing FW part.The other jigs never move.

FW jig very close to sensor damage of edge possibleShould be done before Common Proc. 08!

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 17

Page 18: Ladder Assembly Procedure

Common Proc.13:   Placing FW DSSD and FW hybrid board

• test

3DTable

Table

B

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 18

Page 19: Ladder Assembly Procedure

Common Proc.14:   Replacing BW part

• test

3DTable

Table

B

BW jig very close to sensor damage of edge possibleShould be done before Common Proc. 08!

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 19

Page 20: Ladder Assembly Procedure

Common Proc.15:   Placing BW DSSD and BW hybrid board

• test

3DTable

Table

B

Screw hole to fix the hybrid board

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 20

Page 21: Ladder Assembly Procedure

Common Proc.16: Placing XYZθ-stage. Aligning DSSD(BW).

• test

3DTable

Table

B

The detail of this procedure can be seen in the slide of Shimizu at Wetzlar25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 21

Page 22: Ladder Assembly Procedure

Common Proc.17:Placing XYZθ-stage. Aligning DSSD(-z).

• test

3DTable

Table

B

The detail of this procedure can be seen in the slide of Shimizu at Wetzlar25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 22

Page 23: Ladder Assembly Procedure

Common Proc.18:Placing XYZθ-stage. Aligning DSSD(CE).

• test

3DTable

Table

B

The detail of this procedure can be seen in the slide of Shimizu at Wetzlar25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 23

Page 24: Ladder Assembly Procedure

Common Proc.19:Placing XYZθ-stage. Aligning DSSD(+z).

• test

3DTable

Table

B

The detail of this procedure can be seen in the slide of Shimizu at Wetzlar25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 24

Page 25: Ladder Assembly Procedure

Common Proc.20:Placing XYZθ-stage. Aligning DSSD(FW).

• test

3DTable

Table

B

The detail of this procedure can be seen in the slide of Shimizu at Wetzlarhttp://indico.mppmu.mpg.de/indico/materialDisplay.py?contribId=37&sessionId=5&materialId=slides&confId=2114

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 25

Page 26: Ladder Assembly Procedure

Common Proc.21: Removing XYZθ-stage

• test

3DTable

Table

B

Mechanical QA: Inspection of alignment of DSSDs w/ the coordinate measuring machine.

The detail of the procedure can be seen in the slide of Shimizu at Wetzlarhttp://indico.mppmu.mpg.de/indico/materialDisplay.py?contribId=37&sessionId=5&materialId=slides&confId=2114

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 26

Page 27: Ladder Assembly Procedure

C. Irmler (HEPHY), Y. Onuki (IPMU)

Independent BW and FW part assembly

• Baseline procedure– Full ladder is assembled at one site– Sensors can be aligned before hybrids are attached.

• Independent assembly of BW, FW and Origami parts– Origami assembly unchanged– Pre-assembled FW and BW modules has to be attached– Can we alignment complete BW and FW modules?

– xyθ-stage needs to be modified in order to align sensor + hybrid at once

• The following assembly procedures of BW and FW modules have to be modified, too

25th April 2013 27

Page 28: Ladder Assembly Procedure

SVD ladder assembly flow

Forward assemblyBackward assembly

OrigamiBackward Forward

Glue forward and backward sensors onto ribs

Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them

Origami assembly

Attach Origami sensors to ribs

Origami PA gluing

time

←parallel(independenteach other)

←parallel (multiple sets of jigs)

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 28

Page 29: Ladder Assembly Procedure

FW&BWProc.01 :  Aligning PF2 and PB2

• test

3DTable

Table

B

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

29

Page 30: Ladder Assembly Procedure

FW&BWProc.02 : Placing PF2-jig and PB2-jig. Vacuum chucking.  

• test

3DTable

Table

B

PF2-jig

PB2-jig

PB2 and PF2-jigs have individual vacuum chambers and thus joints.One to fix the DSSD and the second for the PF(B)2.

Two joints

Two joints

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

30

Page 31: Ladder Assembly Procedure

FW&BWProc.03 :  Picking up the jigs. Dispensing glue.

• testTable

TableB 3D

Glue(Yellow)

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

31

Page 32: Ladder Assembly Procedure

FW&BWProc.04 : Placing again and gluing PF2 and PB2  

• test

3DTable

Table

B

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

32

Page 33: Ladder Assembly Procedure

FW&BWProc.05 : Removing PB2-jig and PF2-jig  

• test

3DTable

Table

B

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

33

Page 34: Ladder Assembly Procedure

FW&BWProc.06 : Lifting up the assembly-bench  

• test

3DTable

Table

B

There are grooves for vacuum tubesat the FW and BW

FW

BW

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

34

Page 35: Ladder Assembly Procedure

FW&BWProc.07 : Wire bonding after picked up the F(B)W parts.  

• test

TableB

Table

3D

Mechanical QA: Visual inspection of bonding wiresElectrical QA: Readout test with APVDAQ

After the screwing the hybrid board, We can plug the connector.

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

35

Page 36: Ladder Assembly Procedure

FW&BWProc.08 : Lifting up the assembly-bench  

• test

TableB

Table

3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

36

Page 37: Ladder Assembly Procedure

FW&BWProc.09 : Returning the FW and BW part.  

• test

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

37

Page 38: Ladder Assembly Procedure

FW&BWProc.10 : Placing PF2-jig and PB2-jig again.  

• test

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

38

Page 39: Ladder Assembly Procedure

FW&BWProc.11 : Picking up the BW and FW parts.  

• test

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

39

Page 40: Ladder Assembly Procedure

FW&BWProc.12 : Placing PF1 and PB1. Dispensing glue on them.  

• test

Table

Table

B 3D

There are alignment holes on the surface25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

40

Page 41: Ladder Assembly Procedure

FW&BWProc.13 : Gluing PF1 and PB1.  

• test

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

41

Page 42: Ladder Assembly Procedure

FW&BWProc.14 : Removing the jigs  

• test

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

42

Page 43: Ladder Assembly Procedure

FW&BWProc.15 : Placing PF2-jig and PB2-jig again.  

• test

Table

Table

B 3D

The after, clipping rubbers for each hybridboardto fix the hybridboard to the PF(B)2-jigs.

Rubber

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

43

Page 44: Ladder Assembly Procedure

FW&BWProc.16 : Picking up the parts. Wire-bonding.  

• test

TableB

Table

3D

Mechanical QA: Visual inspection of bonding wiresElectrical QA: Readout test with APVDAQ

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

44

Page 45: Ladder Assembly Procedure

FW&BWProc.17 : Returning the PF2,PB2-jigs  

• test

TableB

Table

3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Not tested yet!

45

Page 46: Ladder Assembly Procedure

FW&BWProc.18 : Placing Slant-jig and Backward-jig.   Table

Table

B 3D

Backward-jig

Slant-jig

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 46

Page 47: Ladder Assembly Procedure

FW&BWProc.19 : Picking up the slant hybrid board.   Table

Table

B 3D

Picking up hybrid board with thin wire.

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 47

Page 48: Ladder Assembly Procedure

FW&BWProc.20 : Moving the X-stages

Table

Table

B 3D

Moving the X-stage to the edge of hybrid board

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 48

Page 49: Ladder Assembly Procedure

FW&BWProc.21 : Clamping the edge of hybridboard

• test

Table

Table

B 3D

Clamping the edge of hybrid board with screw

Clamping screw

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 49

Page 50: Ladder Assembly Procedure

FW&BWProc.22 : Picking up the Slant-jig and Backward-jig.

• test

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 50

Page 51: Ladder Assembly Procedure

FW&BWProc.23 :

• test

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

Place jigs at a secure location

51

Page 52: Ladder Assembly Procedure

SVD ladder assembly flow

Forward assemblyBackward assembly

OrigamiBackward Forward

Glue forward and backward sensors onto ribs

Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them

Origami assembly

Attach Origami sensors to ribs

Origami PA gluing

time

←parallel(independenteach other)

←parallel (multiple sets of jigs)

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 52

Page 53: Ladder Assembly Procedure

Gluing ribs Proc.01 :  Placing the FW and BW parts

• test

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 53

Page 54: Ladder Assembly Procedure

Gluing ribs Proc.02 :  Placing the bridge and screwing

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 54

Page 55: Ladder Assembly Procedure

Gluing ribs Proc.03 :  Placing the supports

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 55

Page 56: Ladder Assembly Procedure

Gluing ribs Proc.04 :  Placing the ribs

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 56

Page 57: Ladder Assembly Procedure

Gluing ribs Proc.05 :  Placing the stopper pins

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 57

Page 58: Ladder Assembly Procedure

Gluing ribs Proc.06 :  Moving the boards to the position.

Table

Table

B 3D

Moving the hybrid boards to the proper positions.25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 58

Page 59: Ladder Assembly Procedure

Gluing ribs Proc.07 :  Dispensing glue on the ribs

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 59

Page 60: Ladder Assembly Procedure

Gluing ribs Proc.08 : Placing the Slant-jig and Backward-jig

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 60

Page 61: Ladder Assembly Procedure

Gluing ribs Proc.09 : Gluing and connecting the board on the MB.

Table

Table

B 3D

The jigs will stop at the proper Z position.

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 61

Page 62: Ladder Assembly Procedure

Gluing ribs Proc.10 : Picking up the Slant-jig and Bacward-jig

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 62

Page 63: Ladder Assembly Procedure

C. Irmler (HEPHY), Y. Onuki (IPMU)

Placing Slant and BW parts

• Precision of pins poor• Original Idea:

– Angle of slanted sensor is defined by slant jig, 2 pins and linear bushings

– Not precise enough– Fragile setup

• Possible solution:– Use two wedge shaped

jigs to determine angle– Allows to use high

precision pins– Needs to be verified

25th April 2013 63

Page 64: Ladder Assembly Procedure

Gluing ribs Proc.11 :  Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 64

Page 65: Ladder Assembly Procedure

SVD ladder assembly flow

Forward assemblyBackward assembly

OrigamiBackward Forward

Glue forward and backward sensors onto ribs

Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them

Origami assembly

Attach Origami sensors to ribs

Origami PA gluing

time

←parallel(independenteach other)

←parallel (multiple sets of jigs)

Common Procedure

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 65

Page 66: Ladder Assembly Procedure

OrigamiProc.01 :  Preparing the Assembly-bench

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 66

Page 67: Ladder Assembly Procedure

OrigamiProc.02 :  Placing the dummy FW and BW DSSD

Table

Table

B 3D

Dummy DSSDs are just used for making flat Z surface.

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 67

Page 68: Ladder Assembly Procedure

OrigamiProc.03 :  Preparing the AIREX-jig

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 68

Page 69: Ladder Assembly Procedure

OrigamiProc.04 :  Placing the AIREX stopper

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 69

Page 70: Ladder Assembly Procedure

OrigamiProc.05 :  Placing the AIREX

Table

TableB

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 70

Page 71: Ladder Assembly Procedure

OrigamiProc.06 :  Removing AIREX stopper. Dispensing glue

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 71

Page 72: Ladder Assembly Procedure

OrigamiProc.07 :  Gluing AIREX

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 72

Page 73: Ladder Assembly Procedure

OrigamiProc.08 :  Removing AIREX-jig

Table

Table

B 3D

Dummy BW-DSSD is not glued with the AIREX

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 73

Page 74: Ladder Assembly Procedure

OrigamiProc.09 :  Preparing the Origami-alignment-jig

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 74

Page 75: Ladder Assembly Procedure

OrigamiProc.10 :  Placing Origami(CE). Wire-binding APV25

Table

TableB 3D

Mechanical QA: Visual inspection of bonding wiresElectrical QA: Readout test with APVDAQ

Origami(CE) can be aligned by alignment holes

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

alignment holes

75

Page 76: Ladder Assembly Procedure

OrigamiProc.11 :  Placing Origami(CE)-jig.

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 76

Page 77: Ladder Assembly Procedure

OrigamiProc.12 :  Dispensing glue.

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 77

Page 78: Ladder Assembly Procedure

OrigamiProc.13 :  Gluing Origami(CE)

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 78

Page 79: Ladder Assembly Procedure

OrigamiProc.14 :  Removing Origami(CE)-jig

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 79

Page 80: Ladder Assembly Procedure

OrigamiProc.15 :  Preparing the Origami-alignment-jig

Table

TableB

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 80

Page 81: Ladder Assembly Procedure

OrigamiProc.16 : Placing Origami(-z). Wire-binding APV25  

Table

TableB 3D

Mechanical QA: Visual inspection of bonding wiresElectrical QA: Readout test with APVDAQ

Origami(-z) can be aligned with the alignment holes

Alignment hole

Alignment holes

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 81

Page 82: Ladder Assembly Procedure

OrigamiProc.17 :  Placing Origami(-z)-jig

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 82

Page 83: Ladder Assembly Procedure

OrigamiProc.18 :  Dispensing glue

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 83

Page 84: Ladder Assembly Procedure

OrigamiProc.19 :  Gluing Origami(-z)

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 84

Page 85: Ladder Assembly Procedure

OrigamiProc.20 :  Gluing Origami(-z)

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 85

Page 86: Ladder Assembly Procedure

OrigamiProc.21 :  Placing Airex(+z)

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 86

Page 87: Ladder Assembly Procedure

OrigamiProc.22 :  Preparing the Origami-alignment-jig

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 87

Page 88: Ladder Assembly Procedure

OrigamiProc.23 : Placing Origami(+z). Wire-binding APV25  

Table

TableB 3D

Alignment hole

Mechanical QA: Visual inspection of bonding wiresElectrical QA: Readout test with APVDAQ

Origami(+z) can be aligned with the alignment holes

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 88

Page 89: Ladder Assembly Procedure

OrigamiProc.24 : Placing Origami(+z)-jig  

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 89

Page 90: Ladder Assembly Procedure

OrigamiProc.25 : Dispensing glue  

Table

TableB 3D

For Origami(+z) AIREXFor slant AIREX

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 90

Page 91: Ladder Assembly Procedure

OrigamiProc.26 : Gluing Origami(+z)  

Table

TableB 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 91

Page 92: Ladder Assembly Procedure

OrigamiProc.27 : Removing Origami(+z)-jig.DSSD wire-bond

TableB

Table

3D

Mechanical QA: Visual inspection of bonding wiresElectrical QA: Readout test with APVDAQ

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 92

Page 93: Ladder Assembly Procedure

OrigamiProc.28 : Wrapping PAs

Table

Table

B 3D

Wrapping and gluing as usual way.25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 93

Page 94: Ladder Assembly Procedure

SVD ladder assembly flow

Forward assemblyBackward assembly

OrigamiBackward Forward

Glue forward and backward sensors onto ribs

Place DSSDs (rectangle, trapezoidal) onto assembly bench and align them

Origami assembly

Attach Origami sensors to ribs

Origami PA gluing

time

←parallel(independenteach other)

←parallel (multiple sets of jigs)

Common Procedure

Final procedure25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 94

Page 95: Ladder Assembly Procedure

Final Proc.01 : Preparing the Origami part  

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 95

Page 96: Ladder Assembly Procedure

Final Proc.02 : Lifting up the assembly-bench  Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 96

Page 97: Ladder Assembly Procedure

Final Proc.03 : Dispensing the glue on the BW dummy DSSD  Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 97

Page 98: Ladder Assembly Procedure

Final Proc.04 : Placing down the assembly-bench  Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 98

Page 99: Ladder Assembly Procedure

Final Proc.05 : Lifting up again. Glues are stamped on BW.

Table

Table

B 3D

Stamped glue

From backside view

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU)

We dispensed the glue directly onto the BW sensor

99

Page 100: Ladder Assembly Procedure

Final Proc.06 : Replacing the Ribs+FW+BW parts. Dispensing glue.  

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 100

Page 101: Ladder Assembly Procedure

Final Proc.07 : Placing the Assembly-bench  Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 101

Page 102: Ladder Assembly Procedure

Final Proc.08 : Gluing the Origami and Ribs.  Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 102

Page 103: Ladder Assembly Procedure

Final Proc.09 : Placing down the bench. Dispensing glue.  Table

Table

B 3D

Dispensing glue some spots on the backside of Origami(+z)25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 103

Page 104: Ladder Assembly Procedure

Final Proc.10 : Gluing the Origami(+z)   Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 104

Page 105: Ladder Assembly Procedure

Final Proc.11 : Attaching the rods at the rib support.   Table

Table

B 3D

M3 screw holes

The rods act like a bumper and handles.25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 105

Page 106: Ladder Assembly Procedure

Final Proc.12 : Pulling up the support with rods.

Table

Table

B 3D

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 106

Page 107: Ladder Assembly Procedure

Final Proc.13 : Finish.

Table

Table

B 3D

Mechanical QA: • Inspection of alignment of DSSDs w/ the coordinate machine.• Thermal cycle test(not all, sampling)Electrical QA: • Readout test with APVDAQ• Source test

25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) 107

Page 108: Ladder Assembly Procedure

C. Irmler (HEPHY), Y. Onuki (IPMU)

The Final Layer 6 Dummy Ladder

• The ladder is still mounted on the rib jig• Cooling pipe already attached

25th April 2013 108

Page 109: Ladder Assembly Procedure

C. Irmler (HEPHY), Y. Onuki (IPMU)25th April 2013

Thank you

109