About the Institution and scope:
Instituted as a Society in 2002Preservation and maintenance of all lakes in the metropolitan areas in Karnataka.For sake of convenience and closer monitoring lakes distributed in the custody of various departments.
Progress in Lake DevelopmentThe Action plan approved by the Hon’ble High Court of Karnataka Committee provides for : Survey and demarcation of the lake.Eviction of encroachment if any.Installing boundary fence.Stop the inflow of raw pollution into the lake.Strengthening the basic structures of the lake.De-silting, de-weeding, laying of embankments and rejuvenation of lakes
Accordingly following progress:
BBMP - 55 lakes - 21 lakes developedBDA - 123 lakes - 12 lakes developedKFD - 5 lakes - 1 lake developedLDA - 4 lakes - 3 lakes developed
16 NLCP assisted Lake Development projects.11 NLCP projects are completed.Lake prioritization list prepared according to NLCP guidelines.Technical Committee scrutinizes the DPRs before submission.Collection of GPS readings for all the water bodies in Bangalore district is in progress and GPS readings for about 500 lakes have been collected.Digitization of lakes as per Revenue records is planned.Basic data of all the lakes are being established.
Concerns
Lakes in Bangalore extremely polluted.Bellandur lake
Biratena Agrahara lake
Storm water drains either choked, encroached or diverted
Ibbalur
Jaraganahalli
Challakere lake
Diverted RajkaluveAt Agara lake
At Madivala lake
Large scale encroachment of lakesSingasandra lake
Konappana Agrahara lake
Kodagi Singasandra lake
Kacharakanahalli lake
Kacharakanahalli lake
Kacharakanahalli lake
Preservation of breached lakes
Malathalli lake
Kelaginakere Byrasandra lake
Conversion to dry lakes
Subedaranakere lake
Subedaranakere lake
Limitations of LDA
Draft KLDA Bill pending
Resource inaccessibility