Auxiliary power consumption reduction opportunities in thermal
power plants
By Lakshmi Narain
Auxiliary power consumption in a thermal power plant is a majorsource of energy consumption.
During the financial year 2007-08, total generation by coal plants was 488157.46 Mus with a PLF of 78.75 %.
Auxiliary power consumption was 8.17 % .
If this APC gets reduced only by 0.17 %, fresh capacity addition of about 120 MW can be achieved without any investment.
APC reduction initiatives not only reduces energy intensitybut also ensures more revenues because of increase in energy export.
APC REDUCTION OPPORTUNITIES
On line monitoring of power consumption of various auxiliaries through OLEMSMonitoring the power consumption of each equipment before and after overhaulEnergy efficient coating of the pumpsIntroduction of VFDsBetter O&M practicesConducting energy audit in a structured manner and implementation of recommendations as per action plan Introduction of latest state of the art technologies on specificsystems without waiting for R&M of the whole power plantCheck audits
On Line Energy Management System
As per CEA notification “Regulations on Installation and Operation of Meters –2006” meters for energy accounting and auditing are to be installed and monitored.
On Line Energy Management SystemTo measure, monitor, trend & compare power consumption of all major systems/ sub systems/ auxiliaries for improving Sp. Energy Consumption
Installation of energy meters on all HT drives and on LT drives > 100KW, which can be hooked up to a central server with the software for assessment of SEC
Already installed and working at Tanda, Dadri coal, Simhadri, Kawas, Faridabad of NTPC
Under procurement / installation at other stations
Monitoring the power consumption of each equipment before and after overhaul
This helps in assessing the power savings achieved due to maintenance jobs carried out during the overhaul and thus see the effectiveness of different maintenance job carried out.
Energy efficient coating of the pumps
4 -5 % improvement in pump efficiency is achievable.
Introduction of VFDs
Suitable for drives where i. load fluctuation are frequent ii. motor loading less than 60-70 % on various occasionsiii. equipments designed with margin for safety purposes
Depending the above factors, pay backs can be 2-7 yearsTechnology available for HT & LT applications, which has proven to be reliable. IGBT/IGCC already in use at Dahanu.
Better O&M practices
Conducting energy audit in a structured manner and implementation of action plan
Energy Audit System includesPreparation of Energy Audit Procedure
Preparation of Energy Audit Schedule
Conduct of Energy Audits
Preparations of Reports indicating recommendations, saving potential and action plan.
Implementation of the action plan including sustainability of energy savings.
Conducting energy audit in a structured manner and implementation of action plan
Check audit
The purpose of check audit is to assess the sustainability of the energy savings
Introduction of latest state of the art technologies on specific systems without waiting for R&M of the whole power plant