lampiran l2 - 1 - repository.maranatha.edu filelampiran l2 - 1 perincian biaya mesin – mesin yang...
TRANSCRIPT
LAMPIRAN L2 - 1
Perincian biaya mesin – mesin yang digunakan : Mesin - Mesin Harga Jumlah Jumlah Harga
Washer Machine (550 lbs) 98,650,000.00Rp 4 394,600,000.00Rp Sample Machine (45 lbs) 24,000,000.00Rp 1 24,000,000.00Rp Extractor 58,750,000.00Rp 2 117,500,000.00Rp Dryer (250 lbs) 58,850,000.00Rp 1 58,850,000.00Rp Dryer Jumbo 72,000,000.00Rp 3 216,000,000.00Rp Boiler Solar (1500 kg) 150,000,000.00Rp 2 300,000,000.00Rp Washer Machine (250 lbs) 43,000,000.00Rp 1 43,000,000.00Rp Washer Machine (50 lbs) 25,000,000.00Rp 1 25,000,000.00Rp Washer Machine (45 lbs) 24,000,000.00Rp 1 24,000,000.00Rp Extractor (100 lbs) 20,000,000.00Rp 1 20,000,000.00Rp Dryer (250 lbs) 35,000,000.00Rp 2 70,000,000.00Rp Roll Machine 60,000,000.00Rp 2 120,000,000.00Rp Boiler Solar (300 kg) 50,000,000.00Rp 1 50,000,000.00Rp Mesin Generator (Genset) 250,000,000.00Rp 1 250,000,000.00Rp
1,712,950,000.00Rp Perincian biaya perlengkapan lain :
Investasi Lain Harga Jumlah Jumlah HargaAlat - alat dapur & makan 1,500,000.00Rp 1 1,500,000.00Rp Sofa 1,000,000.00Rp 1 1,000,000.00Rp Tabung Pemadam Kebakaran 750,000.00Rp 5 3,750,000.00Rp Tabung Gas 250,000.00Rp 1 250,000.00Rp Tempat Tidur 600,000.00Rp 1 600,000.00Rp Televisi 750,000.00Rp 1 750,000.00Rp Sapu 4,000.00Rp 3 12,000.00Rp Asbak 15,000.00Rp 5 75,000.00Rp Tempat Sampah 40,000.00Rp 6 240,000.00Rp Karpet Mushola 100,000.00Rp 1 100,000.00Rp
8,277,000.00Rp
Perincian modal kerja yang disiapkan :
No Jenis Biaya Total biaya1 Biaya Tenaga Kerja 42,300,000.00Rp 2 Biaya Administrasi 244,000.00Rp 3 Biaya Operasional 42,000,000.00Rp 4 Biaya Energi 17,300,000.00Rp 5 Biaya Pabrik 284,651,065.27Rp 6 Biaya Lain - Lain 1,030,000.00Rp
Total 387,525,065.27Rp Dana Cadangan 32,474,934.73Rp
Modal Kerja Disiapkan 420,000,000.00Rp
TUGAS AKHIR
LAMPIRAN
L2 - 2
TUGAS AKHIR
AMPIRAN L2 - 3
TUGAS AKHIR
1 Bahan LangsungPersediaan Awal -Rp -Rp Rp Pembelian 9,266,431.88Rp + 19,895,859.58Rp + 11,025,384.4Rp Bahan tersedia untuk digunakan 9,266,431.88Rp 19,895,859.58Rp 11,025,384Rp Persediaan Akhir -Rp -Rp -Rp Bahan tidak langsung -Rp + -Rp - -Rp + -Rp - -Rp + Rp Bahan Terpakai 9,266,431.88Rp 19,895,859.58Rp 11,025,384Rp
2 Pekerja Langsung 35,550,000.00Rp 35,550,000.00Rp 35,550,000Rp 3 Biaya Pabrik Tak langsung
Overhead 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.6Rp 4 Total Biaya Produksi 74,796,048.54Rp 85,425,476.24Rp 76,555,001Rp
5 Barang dalam ProsesPersediaan Awal dalam Proses -Rp -Rp -Rp Persediaan Akhir dalam Proses -Rp + -Rp + -Rp + -Rp + -Rp + Rp Harga Pokok Produksi 74,796,048.54Rp 85,425,476.24Rp 76,555,001Rp
Produk JadiPersediaan Awal -Rp -Rp -Rp Persediaan Akhir -Rp - -Rp + -Rp - -Rp + -Rp - Rp HARGA POKOK PENJUALAN 74,796,048.54Rp 85,425,476.24Rp 76,555,001Rp
Keterangan Garment Wash Enzym Wash Silicon Wash
-5 +
.45
- -.45
.00
7 +.12
- +.12
- +.12
Perincian perhitungan harga pokok setiap jenis washing :
L
AMPIRAN L2 - 4
TUGAS AKHIR
1 Bahan LangsungPersediaan Awal -Rp -Rp Rp Pembelian 7,859,541.70Rp + 18,078,042.32Rp + 17,684,094.93Rp Bahan tersedia untuk digunakan 7,859,541.70Rp 18,078,042.32Rp 17,684,094.93Rp Persediaan Akhir -Rp -Rp -Rp Bahan tidak langsung -Rp + -Rp - -Rp + -Rp - -Rp + Rp Bahan Terpakai 7,859,541.70Rp 18,078,042.32Rp 17,684,094.93Rp
2 Pekerja Langsung 35,550,000.00Rp 35,550,000.00Rp 35,550,000.00Rp 3 Biaya Pabrik Tak langsung
Overhead 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp + 29,979,616.67Rp 4 Total Biaya Produksi 73,389,158.36Rp 83,607,658.99Rp 83,213,711.60Rp
5 Barang dalam ProsesPersediaan Awal dalam Proses -Rp -Rp -Rp Persediaan Akhir dalam Proses -Rp + -Rp + -Rp + -Rp + -Rp + Rp Harga Pokok Produksi 73,389,158.36Rp 83,607,658.99Rp 83,213,711.60Rp
Produk JadiPersediaan Awal -Rp -Rp -Rp Persediaan Akhir -Rp - -Rp + -Rp - -Rp + -Rp - Rp HARGA POKOK PENJUALAN 73,389,158.36Rp 83,607,658.99Rp 83,213,711.60Rp
Enzyme Stone BleachSand Wash Enzyme Stone WashKeterangan
- +
- -
+
- +
- +
L
LAMPIRAN L2 - 5
1 Bahan LangsungPersediaan Awal -Rp -Rp Pembelian 656,385.42Rp + -Rp +Bahan tersedia untuk digunakan 656,385.42Rp -Rp Persediaan Akhir -Rp -Rp Bahan tidak langsung -Rp + -Rp - -Rp + -Rp -Bahan Terpakai 656,385.42Rp -Rp
2 Pekerja Langsung 6,750,000.00Rp 1,200,000.00Rp 3 Biaya Pabrik Tak langsung
Overhead 5,383,333.33Rp + 5,383,333.33Rp + 700,000.00Rp + 700,000.00Rp +4 Total Biaya Produksi 12,789,718.75Rp 1,900,000.00Rp
5 Barang dalam ProsesPersediaan Awal dalam Proses -Rp -Rp Persediaan Akhir dalam Proses -Rp + -Rp + -Rp + -Rp +Harga Pokok Produksi 12,789,718.75Rp 1,900,000.00Rp
Produk JadiPersediaan Awal -Rp -Rp Persediaan Akhir -Rp - -Rp + -Rp - -Rp +HARGA POKOK PENJUALAN 12,789,718.75Rp 1,900,000.00Rp
Keterangan Sprei Sarung Bantal
1 Bahan LangsungPersediaan Awal -Rp -Rp Pembelian 656,825.00Rp + 778,500.00Rp +Bahan tersedia untuk digunakan 656,825.00Rp 778,500.00Rp Persediaan Akhir -Rp -Rp Bahan tidak langsung -Rp + -Rp - -Rp + -Rp -Bahan Terpakai 656,825.00Rp 778,500.00Rp
2 Pekerja Langsung 6,750,000.00Rp 6,750,000.00Rp 3 Biaya Pabrik Tak langsung
Overhead 5,383,333.33Rp + 5,383,333.33Rp + 5,383,333.33Rp + 5,383,333.33Rp +4 Total Biaya Produksi 12,790,158.33Rp 12,911,833.33Rp
5 Barang dalam ProsesPersediaan Awal dalam Proses -Rp -Rp Persediaan Akhir dalam Proses -Rp + -Rp + -Rp + -Rp +Harga Pokok Produksi 12,790,158.33Rp 12,911,833.33Rp
Produk JadiPersediaan Awal -Rp -Rp Persediaan Akhir -Rp - -Rp + -Rp - -Rp +HARGA POKOK PENJUALAN 12,790,158.33Rp 12,911,833.33Rp
Handuk Bed CoverKeterangan
Keterangan untuk perhitungan harga pokok sarung bantal : biaya – biaya
yang semestinya dibebankan pada sarung bantal seperti biaya pembelian
(bahan kimia) telah dibebankan ke item lain yaitu sprei, handuk dan bed
cover. Hal ini dilakukan karena pada saat pencucian, item yang satu
TUGAS AKHIR
LAMPIRAN
L2 - 6
TUGAS AKHIR
dengan yang lain dapat dicuci / diperas / dikeringkan bersama – sama dan
item sarung bantal ini selalu menjadi pengikut saat pencucian item lain.
Namun untuk item sarung bantal ini juga dilakukan pengerollan dan
pengepakan, maka pembebanan biaya depresiasi, listrik dan tenaga kerja
dilakukan untuk 1 mesin roll. Perhitungannya adalah sebagai berikut :
Depresiasi 1 buah mesin roll dalam 1 tahun = 2
000.000.12Rp =
Rp 6.000.000.
Depresiasi dalam 1 bulan = 12
000.000.6Rp = Rp 500.000
Biaya tenaga kerja yang dibebankan yaitu tenaga kerja untuk
melakukan pengerollan dan pengepakan sebanyak 2 orang, sehingga
biaya tenaga kerja ini adalah 2 x Rp 600.000 = Rp 1.200.000
Biaya listrik yang dibebankan adalah biaya penggunaan listrik untuk
1 mesin roll, sehingga dilakukan asumsi bahwa biaya listrik
pencucian hotel selama 1 bulan dibagi rata pada jenis mesin yang ada
yaitu 20 % untuk setiap jenis mesin. Maka untuk mesin roll, biaya
listriknya adalah 20 % * Rp 2.000.000 = Rp 400.000. Jumlah mesin
roll adalah 2 buah, sehingga diasumsikan perhitungan listriknya
dibagi 2 sama rata = 2
.400Rp 000 = Rp 200.000
Dari perhitungan itu, maka biaya yang dibebankan dalam pencucian
sarung bantal hanyalah biaya tenaga kerja sebesar Rp 1.200.000 dan biaya
overhead sebesar Rp 500.000 + Rp 200.000 = Rp 700.000
LAMPIRAN
L2 - 7
TUGAS AKHIR
Contoh perhitungan bahan kimia :
No Jenis Bahan Kimia Penggunaan 1x cuci No Jenis Bahan Kimia Penggunaan 1x cuci1 OBA 15,547.01Rp 1 Bio Polish L 7 52,727.62Rp 2 ABS 11,686.00Rp 2 Clean L 2 37,361.29Rp 3 Clean L 2 10,707.88Rp 3 Silicon 38,867.79Rp 4 Primafix 6,537.98Rp 4 Bio 205 59,356.24Rp 5 Primacone 7,001.30Rp 5 Acco Soft 48,810.71Rp
51,480.18Rp 6 Primazym 44,140.55Rp 7 OBA 20,036.50Rp
301,300.71Rp No Jenis Bahan Kimia Penggunaan 1x cuci1 OBA 28,252.12Rp 2 Enzym 34,088.24Rp No Jenis Bahan Kimia Penggunaan 1x cuci3 Primazym 33,292.41Rp 1 Bio A 82 46,862.85Rp 4 Primasoft FL 19,232.66Rp 2 Primazym 34,778.72Rp 5 Primacone II 17,773.63Rp 3 Primacone II 33,010.31Rp
132,639.06Rp 4 Bio 200 37,726.07Rp 5 Clean L 2 39,494.48Rp 6 OBA 38,020.80Rp
No123456
No1234567
S
ENZYM STONE WASH
ENZYM STONE BLEACH
GARMENT WASH
ENZYM WASH
SILICON WASHJenis Bahan Kimia Penggunaan 1x cuci 7 Enzym 19,599.87Rp
Primasoft FL 14,884.27Rp 8 Acco Soft 45,241.81Rp Silicon 19,570.06Rp 294,734.92Rp Bio FB 13,597.97Rp Tov Chem B 15 P 17,824.37Rp Primafix 12,954.83Rp No Jenis Bahan Kimia Penggunaan 1 hariFalcon FA 100 N 13,046.70Rp 1 Sabun 11,377.35Rp
91,878.20Rp 2 Softener 10,502.17Rp 21,879.51Rp
Jenis Bahan Kimia Penggunaan 1x cuciBio 205 22,923.66Rp No Jenis Bahan Kimia Penggunaan 1 hariOBA 16,243.05Rp 1 Sabun 11,319.28Rp ABS 16,898.01Rp 2 Softener 10,574.88Rp Primacone 25,805.50Rp 21,894.17Rp Clean L 2 21,220.76Rp Primasoft 19,190.38Rp Tov Chem B 15 P 8,710.99Rp No Jenis Bahan Kimia Penggunaan 1 hari
130,992.36Rp 1 OBA 12,975.00Rp 2 Softener 12,975.00Rp
25,950.00Rp
HANDUK
BED COVER
AND WASH
SPREI
LAMPIRAN L2 - 8
Perhitungan Rugi – Laba :
Keterangan
Hasil Penjualan 567,467,423.38Rp 709,334,279.22Rp 709,334,279.22Rp 780,742,320.44Rp - -
LABA KOTOR 567,467,423.38Rp 709,334,279.22Rp 709,334,279.22Rp 780,742,320.44Rp Biaya Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 84,600,000.00Rp 42,300,000.00Rp Biaya per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan 213,000.00Rp -Rp -Rp -Rp Biaya per tahun 687,000.00Rp -Rp -Rp -Rp Biaya Operasional 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp 42,000,000.00Rp Biaya Depresiasi 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp Biaya Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik 268,091,218.59Rp + 459,028,168.59Rp - 272,391,970.01Rp + 432,428,920.01Rp - 272,391,970.01Rp + 474,728,920.01Rp - 276,371,141.93Rp + 466,408,091.93Rp -LABA DARI OPERASI 108,439,254.79Rp 276,905,359.21Rp 234,605,359.21Rp 314,334,228.51Rp
Penerimaan / PengeluaranPenerimaan lain-lain -Rp -Rp -Rp -Rp Pengeluaran lain-lain -Rp + -Rp - -Rp + -Rp - -Rp + -Rp - -Rp + -Rp -LABA SEBELUM PAJAK 108,439,254.79Rp 276,905,359.21Rp 234,605,359.21Rp 314,334,228.51Rp Bunga -Rp -Rp -Rp Pajak Penghasilana. 10% dari 50jt pertama 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp b. 15% dari 50jt kedua 15%*(laba kotor-50jt) 8,765,888.22Rp 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp c. 30% dari (laba kotor - 100jt) -Rp - 53,071,607.76Rp - 40,381,607.76Rp - 64,300,268.55Rp LABA BERSIH SETELAH PAJAK 94,673,366.57Rp 211,333,751.45Rp 181,723,751.45Rp 237,533,959.96Rp
Untuk akhir bulan ke-1 Untuk akhir bulan ke-2 Untuk akhir bulan ke-3 Untuk akhir bulan ke-4
TUGAS AKHIR
LAMPIRAN L2 - 9
Keterangan
Hasil Penjualan 780,742,320.44Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp - -
LABA KOTOR 780,742,320.44Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp Biaya Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp Biaya per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan -Rp -Rp 213,000.00Rp -Rp Biaya per tahun -Rp -Rp -Rp -Rp Biaya Operasional 12,000,000.00Rp 12,000,000.00Rp 42,000,000.00Rp 12,000,000.00Rp Biaya Depresiasi 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp Biaya Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik 276,371,141.93Rp + 436,408,091.93Rp - 284,651,065.27Rp + 444,688,015.27Rp - 284,651,065.27Rp + 474,901,015.27Rp - 284,651,065.27Rp + 444,688,015.27Rp -LABA DARI OPERASI 344,334,228.51Rp 438,158,074.93Rp 407,945,074.93Rp 438,158,074.93Rp
Penerimaan / PengeluaranPenerimaan lain-lain -Rp -Rp -Rp -Rp Pengeluaran lain-lain -Rp + -Rp - -Rp + -Rp - -Rp + -Rp - -Rp + -Rp -LABA SEBELUM PAJAK 344,334,228.51Rp 438,158,074.93Rp 407,945,074.93Rp 438,158,074.93Rp Bunga -Rp -Rp -Rp Pajak Penghasilana. 10% dari 50jt pertama 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp b. 15% dari 50jt kedua 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp c. 30% dari (laba kotor - 100jt) 73,300,268.55Rp - 101,447,422.48Rp - 92,383,522.48Rp - 101,447,422.48Rp LABA BERSIH SETELAH PAJAK 258,533,959.96Rp 324,210,652.45Rp 303,061,552.45Rp 324,210,652.45Rp
LAPORAN RUGI LABAUntuk akhir bulan ke-5 Untuk akhir bulan ke-6 Untuk akhir bulan ke-7 Untuk akhir bulan ke-8
TUGAS AKHIR
L2 - 10
TUGAS AKHIR
Keterangan
enjualan 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,Rp -
OTOR 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,Rp a Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp a per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp a per 6 bulan -Rp -Rp -Rp -Rp a per tahun -Rp -Rp -Rp -Rp a Operasional 12,000,000.00Rp 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp a Depresiasi 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp 23,062,950.00Rp a Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp a Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp a Pabrik 284,651,065.27Rp + 444,688,015.27Rp - 284,651,065.27Rp + 474,688,015.27Rp - 284,651,065.27Rp + 444,688,015.27Rp - 284,651,065.27Rp + 444,Rp
OPERASI 438,158,074.93Rp 408,158,074.93Rp 438,158,074.93Rp 438,Rp
aan / Pengeluaranrimaan lain-lain -Rp -Rp -Rp -Rp eluaran lain-lain -Rp + -Rp - -Rp + -Rp - -Rp + -Rp - -Rp + Rp A SEBELUM PAJAK 438,158,074.93Rp 408,158,074.93Rp 438,158,074.93Rp 438,Rp a -Rp -Rp -Rp k Penghasilan% dari 50jt pertama 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp Rp
ari 50jt kedua 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp Rp % dari (laba kotor - 100jt) 101,447,422.48Rp - 92,447,422.48Rp - 101,447,422.48Rp - 101,Rp A BERSIH SETELAH PAJAK 324,210,652.45Rp 303,210,652.45Rp 324,210,652.45Rp 324,Rp
Untuk akhir bulan ke-9 Untuk akhir bulan ke-10 Untuk akhir bulan ke-11 Untuk akhir bulan ke-12
Hasil P 846,090.20-
LABA K 846,090.20BiayBiayBiayBiayBiayBiayBiayBiayBiay 688,015.27 -LABA DARI 158,074.93
PenerimPenePeng - -LAB 158,074.93BungPajaa. 10 5,000,000.00 b. 15% d 7,500,000.00 c. 30 447,422.48LAB 210,652.45
LAMPIRAN
L2 - 11
TUGAS AKHIR
Keterangan
l Penjualan 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,Rp - - -
A KOTOR 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,Rp a Tenaga Kerja 549,900,000.00Rp 549,900,000.00Rp 549,900,000.00Rp 549,900,000.00Rp a Administrasi 2,513,000.00Rp 2,513,000.00Rp 2,513,000.00Rp 2,513,000.00Rp a Operasional 264,000,000.00Rp 264,000,000.00Rp 264,000,000.00Rp 264,000,000.00Rp a Depresiasi 276,755,400.00Rp 276,755,400.00Rp 276,755,400.00Rp 276,755,400.00Rp a Energi 207,600,000.00Rp 207,600,000.00Rp 207,600,000.00Rp 207,600,000.00Rp a Maintenance 780,000,000.00Rp 780,000,000.00Rp 780,000,000.00Rp 780,000,000.00Rp a Pabrik 3,415,812,783.24Rp + 5,496,581,183.24Rp - 3,415,812,783.24Rp + 5,496,581,183.24Rp - 3,415,812,783.24Rp + 5,496,581,183.24Rp - 3,415,812,783.24Rp + 5,496,Rp
OPERASI 5,097,571,899.13Rp 5,097,571,899.13Rp 5,097,571,899.13Rp 5,097,Rp
aan / Pengeluaranrimaan lain-lain -Rp -Rp -Rp -Rp eluaran lain-lain 3,088,000.00Rp + 3,088,000.00Rp - 3,088,000.00Rp + 3,088,000.00Rp - 3,088,000.00Rp + 3,088,000.00Rp - 3,088,000.00Rp + Rp A SEBELUM PAJAK 5,094,483,899.13Rp 5,094,483,899.13Rp 5,094,483,899.13Rp 5,094,Rp a -Rp -Rp -Rp Rp k Penghasilan% dari 50jt pertama 5,000,000.00Rp 5,000,000.00Rp 5,000,000.00Rp Rp
ari 50jt kedua 7,500,000.00Rp 7,500,000.00Rp 7,500,000.00Rp Rp % dari (laba kotor - 100jt) 1,498,345,169.74Rp - 1,498,345,169.74Rp - 1,498,345,169.74Rp - 1,498,Rp A BERSIH SETELAH PAJAK 3,583,638,729.39Rp 3,583,638,729.39Rp 3,583,638,729.39Rp 3,583,Rp
Untuk akhir tahun ke-3 Untuk akhir tahun ke-4 Untuk akhir tahun ke-Untuk akhir tahun ke-2
Hasi 153,082.36-
LAB 153,082.36BiayBiayBiayBiayBiayBiayBiay 581,183.24 -LABA DARI 571,899.13
PenerimPenePeng 3,088,000.00 -LAB 483,899.13Bung - Pajaa. 10 5,000,000.00 b. 15% d 7,500,000.00 c. 30 345,169.74 -LAB 638,729.39
5
LAMPIRAN
LAMPIRAN L2 - 12
TUGAS AKHIR
Perhitungan biaya bahan kimia yang termasuk dalam biaya pabrik setiap bulan
pada tahun pertama :
No Jenis Washing Biaya 1 bulan1 Garment Wash 6,177,621.25Rp 2 Enzyme Wash 11,937,515.75Rp 3 Silicon Wash 5,512,692.22Rp 4 Sand Wash 7,859,541.70Rp 5 Enzyme Stone Wash 18,078,042.32Rp 6 Enzyme Stone Bleach 17,684,094.93Rp 7 Sprei 656,385.42Rp 8 Sarung Bantal -Rp 9 Handuk 656,825.00Rp
10 Bad Cover 778,500.00Rp 69,341,218.59Rp
Biaya Bahan Kimia Bulan 1
No Jenis Washing Biaya 1 bulan1 Garment Wash 7,722,026.56Rp 2 Enzyme Wash 11,937,515.75Rp 3 Silicon Wash 8,269,038.34Rp 4 Sand Wash 7,859,541.70Rp 5 Enzyme Stone Wash 18,078,042.32Rp 6 Enzyme Stone Bleach 17,684,094.93Rp 7 Sprei 656,385.42Rp 8 Sarung Bantal -Rp 9 Handuk 656,825.00Rp
10 Bad Cover 778,500.00Rp 73,641,970.01Rp
Biaya Bahan Kimia Bulan 2-3
No Jenis Washing Biaya 1 bulan1 Garment Wash 7,722,026.56Rp 2 Enzyme Wash 15,916,687.66Rp 3 Silicon Wash 8,269,038.34Rp 4 Sand Wash 7,859,541.70Rp 5 Enzyme Stone Wash 18,078,042.32Rp 6 Enzyme Stone Bleach 17,684,094.93Rp 7 Sprei 656,385.42Rp 8 Sarung Bantal -Rp 9 Handuk 656,825.00Rp
10 Bad Cover 778,500.00Rp 77,621,141.93Rp
Biaya Bahan Kimia Bulan 4-5
LAMPIRAN L2 - 13
TUGAS AKHIR
No Jenis Washing Biaya 1 bulan1 Garment Wash 9,266,431.88Rp 2 Enzyme Wash 19,895,859.58Rp 3 Silicon Wash 11,025,384.45Rp 4 Sand Wash 7,859,541.70Rp 5 Enzyme Stone Wash 18,078,042.32Rp 6 Enzyme Stone Bleach 17,684,094.93Rp 7 Sprei 656,385.42Rp 8 Sarung Bantal -Rp 9 Handuk 656,825.00Rp
10 Bad Cover 778,500.00Rp 85,901,065.27Rp
Biaya Bahan Kimia Bulan 6-12
No Jenis Washing Biaya 1 tahun1 Garment Wash 111,197,182.50Rp 2 Enzyme Wash 238,750,314.93Rp 3 Silicon Wash 132,304,613.40Rp 4 Sand Wash 94,314,500.36Rp 5 Enzyme Stone Wash 216,936,507.88Rp 6 Enzyme Stone Bleach 212,209,139.17Rp 7 Sprei 7,876,625.00Rp 8 Sarung Bantal -Rp 9 Handuk 7,881,900.00Rp
10 Bad Cover 9,342,000.00Rp 1,030,812,783.24Rp
Biaya Bahan Kimia Tahun 2-5
LAMPIRAN L2 - 14
Perincian perhitungan Cash Flow :
Bulan Ke - 0 Bulan Ke - 1 Bulan Ke - 2 Bulan Ke - 3-Rp 420,000,000.00Rp 537,736,316.57Rp 772,133,018.02Rp
Modal Sendiri 3,550,477,000.00Rp -Rp -Rp -Rp Modal dari pinjaman Bank -Rp -Rp -Rp -Rp Penjualan -Rp 567,467,423.38Rp 709,334,279.22Rp 709,334,279.22Rp Total Penerimaan Kas 3,550,477,000.00Rp 567,467,423.38Rp 709,334,279.22Rp 709,334,279.22Rp
Investasi 2,978,477,000.00Rp -Rp -Rp -Rp Instalasi & Surat Izin 152,000,000.00Rp -Rp -Rp -Rp Biaya - biaya dalam 1 bulanBiaya Tenaga Kerja -Rp 42,300,000.00Rp 42,300,000.00Rp 84,600,000.00Rp Biaya per bulan -Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan -Rp 213,000.00Rp -Rp -Rp Biaya per tahun -Rp 687,000.00Rp -Rp -Rp Biaya Operasional -Rp 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp Biaya Energi -Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance -Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik -Rp 268,091,218.59Rp 272,391,970.01Rp 272,391,970.01Rp PPH -Rp 13,765,888.22Rp 65,571,607.76Rp 52,881,607.76Rp Total Pengeluaran Kas 3,130,477,000.00Rp 449,731,106.81Rp 474,937,577.78Rp 504,547,577.78Rp
Saldo Akhir 420,000,000.00Rp 537,736,316.57Rp 772,133,018.02Rp 976,919,719.46Rp
PENGELUARAN KAS
CASH FLOW
Saldo Awal KasPENERIMAAN KAS
TUGAS AKHIR
LAMPIRAN L2 - 15
Bulan Ke - 4 Bulan Ke - 5 Bulan Ke - 6 Bulan Ke - 7976,919,719.46Rp 1,237,516,629.42Rp 1,519,113,539.38Rp 1,866,387,141.83Rp
Modal Sendiri -Rp -Rp -Rp -Rp Modal dari pinjaman Bank -Rp -Rp -Rp -Rp Penjualan 780,742,320.44Rp 780,742,320.44Rp 882,846,090.20Rp 882,846,090.20Rp Total Penerimaan Kas 780,742,320.44Rp 780,742,320.44Rp 882,846,090.20Rp 882,846,090.20Rp
Investasi -Rp -Rp -Rp -Rp Instalasi & Surat Izin -Rp -Rp -Rp -Rp Biaya - biaya dalam 1 bulanBiaya Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp Biaya per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan -Rp -Rp -Rp 213,000.00Rp Biaya per tahun -Rp -Rp -Rp -Rp Biaya Operasional 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp 42,000,000.00Rp Biaya Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik 276,371,141.93Rp 276,371,141.93Rp 284,651,065.27Rp 284,651,065.27Rp PPH 76,800,268.55Rp 85,800,268.55Rp 113,947,422.48Rp 104,883,522.48Rp Total Pengeluaran Kas 520,145,410.48Rp 499,145,410.48Rp 535,572,487.75Rp 556,721,587.75Rp
Saldo Akhir 1,237,516,629.42Rp 1,519,113,539.38Rp 1,866,387,141.83Rp 2,192,511,644.28Rp
PENGELUARAN KAS
Saldo Awal KasPENERIMAAN KAS
CASH FLOW
TUGAS AKHIR
LAMPIRAN L2 - 16
Bulan Ke - 8 Bulan Ke - 9 Bulan Ke - 10 Bulan Ke - 11 Bulan Ke - 122,192,511,644.28Rp 2,539,785,246.73Rp 2,887,058,849.17Rp 3,213,332,451.62Rp 3,560,606,054.07Rp
Modal Sendiri -Rp -Rp -Rp -Rp -Rp Modal dari pinjaman Bank -Rp -Rp -Rp -Rp -Rp Penjualan 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp Total Penerimaan Kas 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp 882,846,090.20Rp
Investasi -Rp -Rp -Rp -Rp -Rp Instalasi & Surat Izin -Rp -Rp -Rp -Rp -Rp Biaya - biaya dalam 1 bulanBiaya Tenaga Kerja 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp 42,300,000.00Rp Biaya per bulan 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp 374,000.00Rp Biaya per 6 bulan -Rp -Rp -Rp -Rp -Rp Biaya per tahun -Rp -Rp -Rp -Rp -Rp Biaya Operasional 12,000,000.00Rp 12,000,000.00Rp 42,000,000.00Rp 12,000,000.00Rp 12,000,000.00Rp Biaya Energi 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp 17,300,000.00Rp Biaya Maintenance 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp 65,000,000.00Rp Biaya Pabrik 284,651,065.27Rp 284,651,065.27Rp 284,651,065.27Rp 284,651,065.27Rp 284,651,065.27Rp PPH 113,947,422.48Rp 113,947,422.48Rp 104,947,422.48Rp 113,947,422.48Rp 113,947,422.48Rp Total Pengeluaran Kas 535,572,487.75Rp 535,572,487.75Rp 556,572,487.75Rp 535,572,487.75Rp 535,572,487.75Rp
Saldo Akhir 2,539,785,246.73Rp 2,887,058,849.17Rp 3,213,332,451.62Rp 3,560,606,054.07Rp 3,907,879,656.52Rp
CASH FLOW
PENGELUARAN KAS
Saldo Awal KasPENERIMAAN KAS
TUGAS AKHIR
LAMPIRAN L2 - 17
Tahun Ke - 2 Tahun Ke - 3 Tahun Ke - 4 Tahun Ke - 53,907,879,656.52Rp 7,768,273,785.91Rp 11,628,667,915.30Rp 15,489,062,044.69Rp
Modal Sendiri -Rp -Rp -Rp -Rp Modal dari pinjaman Bank -Rp -Rp -Rp -Rp Penjualan 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp Total Penerimaan Kas 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp 10,594,153,082.36Rp
Investasi -Rp -Rp -Rp -Rp Instalasi & Surat Izin -Rp -Rp -Rp -Rp Biaya - biaya dalam 1 tahunBiaya Tenaga Kerja 549,900,000.00Rp 549,900,000.00Rp 549,900,000.00Rp 549,900,000.00Rp Biaya Administrasi 2,513,000.00Rp 2,513,000.00Rp 2,513,000.00Rp 2,513,000.00Rp Biaya Operasional 264,000,000.00Rp 264,000,000.00Rp 264,000,000.00Rp 264,000,000.00Rp Biaya Energi 207,600,000.00Rp 207,600,000.00Rp 207,600,000.00Rp 207,600,000.00Rp Biaya Maintenance 780,000,000.00Rp 780,000,000.00Rp 780,000,000.00Rp 780,000,000.00Rp Biaya Pabrik 3,415,812,783.24Rp 3,415,812,783.24Rp 3,415,812,783.24Rp 3,415,812,783.24Rp Biaya Lain - Lain 3,088,000.00Rp 3,088,000.00Rp 3,088,000.00Rp 3,088,000.00Rp PPH 1,510,845,169.74Rp 1,510,845,169.74Rp 1,510,845,169.74Rp 1,510,845,169.74Rp Total Pengeluaran Kas 6,733,758,952.97Rp 6,733,758,952.97Rp 6,733,758,952.97Rp 6,733,758,952.97Rp
Saldo Akhir 7,768,273,785.91Rp 11,628,667,915.30Rp 15,489,062,044.69Rp 19,349,456,174.07Rp
CASH FLOW
PENGELUARAN KAS
Saldo Awal KasPENERIMAAN KAS
TUGAS AKHIR
LAMPIRAN L2 - 18
Perincian perhitungan Neraca :
1 Aktiva Lancar 1 HutangKas 420,000,000.00Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 420,000,000.00Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi -Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan -Rp
Total Aktiva Tetap 3,130,477,000.00Rp Total Modal 3,550,477,000.00Rp
3,550,477,000.00Rp 3,550,477,000.00Rp
1 Aktiva Lancar 1 HutangKas 537,736,316.57Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 537,736,316.57Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (23,062,950.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 94,673,367Rp
Total Aktiva Tetap 3,107,414,050.00Rp Total Modal 3,645,150,366.57Rp
3,645,150,366.57Rp 3,645,150,366.57Rp
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANBulan Ke - 1
AKTIVA PASIVA
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANBulan Ke - 0
AKTIVA PASIVA
TUGAS AKHIR
LAMPIRAN L2 - 19
1 Aktiva Lancar 1 HutangKas 772,133,018.02Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 772,133,018.02Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (46,125,900.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 306,007,118Rp
Total Aktiva Tetap 3,084,351,100.00Rp Total Modal 3,856,484,118.02Rp
3,856,484,118.02Rp 3,856,484,118.02Rp
1 Aktiva Lancar 1 HutangKas 976,919,719.46Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 976,919,719.46Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (69,188,850.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 487,730,869Rp
Total Aktiva Tetap 3,061,288,150.00Rp Total Modal 4,038,207,869.46Rp
4,038,207,869.46Rp 4,038,207,869.46Rp
AKTIVA PASIVA
TOTAL AKTIVA TOTAL PASIVA
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANBulan Ke - 3
NERACA KEUANGANBulan Ke - 2
AKTIVA PASIVA
TUGAS AKHIR
LAMPIRAN L2 - 20
1 Aktiva Lancar 1 HutangKas 1,237,516,629.42Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 1,237,516,629.42Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (92,251,800.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 725,264,829Rp
Total Aktiva Tetap 3,038,225,200.00Rp Total Modal 4,275,741,829.42Rp
4,275,741,829.42Rp 4,275,741,829.42Rp
1 Aktiva Lancar 1 HutangKas 1,519,113,539.38Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 1,519,113,539.38Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (115,314,750.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 983,798,789Rp
Total Aktiva Tetap 3,015,162,250.00Rp Total Modal 4,534,275,789.38Rp
4,534,275,789.38Rp 4,534,275,789.38Rp
AKTIVA PASIVA
TOTAL AKTIVA TOTAL PASIVA
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANBulan Ke - 5
NERACA KEUANGANBulan Ke - 4
AKTIVA PASIVA
TUGAS AKHIR
LAMPIRAN L2 - 21
1 Aktiva Lancar 1 HutangKas 1,866,387,141.83Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 1,866,387,141.83Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (138,377,700.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 1,308,009,442Rp
Total Aktiva Tetap 2,992,099,300.00Rp Total Modal 4,858,486,441.83Rp
4,858,486,441.83Rp 4,858,486,441.83Rp
1 Aktiva Lancar 1 HutangKas -Rp Hutang Lancar -Rp Piutang 2,192,511,644.28Rp Hutang Dagang -Rp Total Aktiva Lancar 2,192,511,644.28Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (161,440,650.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 1,611,070,994Rp
Total Aktiva Tetap 2,969,036,350.00Rp Total Modal 5,161,547,994.28Rp
5,161,547,994.28Rp 5,161,547,994.28Rp
AKTIVA PASIVA
TOTAL AKTIVA TOTAL PASIVA
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANBulan Ke - 7
NERACA KEUANGANBulan Ke - 6
AKTIVA PASIVA
TUGAS AKHIR
LAMPIRAN L2 - 22
1 Aktiva Lancar 1 HutangKas 2,539,785,246.73Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 2,539,785,246.73Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (184,503,600.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 1,935,281,647Rp
Total Aktiva Tetap 2,945,973,400.00Rp Total Modal 5,485,758,646.73Rp
5,485,758,646.73Rp 5,485,758,646.73Rp
1 Aktiva Lancar 1 HutangKas 2,887,058,849.17Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 2,887,058,849.17Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (207,566,550.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 2,259,492,299Rp
Total Aktiva Tetap 2,922,910,450.00Rp Total Modal 5,809,969,299.17Rp
5,809,969,299.17Rp 5,809,969,299.17Rp
AKTIVA PASIVA
TOTAL AKTIVA TOTAL PASIVA
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANBulan Ke - 9
NERACA KEUANGANBulan Ke - 8
AKTIVA PASIVA
TUGAS AKHIR
LAMPIRAN L2 - 23
1 Aktiva Lancar 1 HutangKas 3,213,332,451.62Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 3,213,332,451.62Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (230,629,500.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 2,562,702,952Rp
Total Aktiva Tetap 2,899,847,500.00Rp Total Modal 6,113,179,951.62Rp
6,113,179,951.62Rp 6,113,179,951.62Rp
1 Aktiva Lancar 1 HutangKas 3,560,606,054.07Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 3,560,606,054.07Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (253,692,450.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 2,886,913,604Rp
Total Aktiva Tetap 2,876,784,550.00Rp Total Modal 6,437,390,604.07Rp
6,437,390,604.07Rp 6,437,390,604.07Rp
AKTIVA PASIVA
TOTAL AKTIVA TOTAL PASIVA
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANBulan Ke - 11
NERACA KEUANGANBulan Ke - 10
AKTIVA PASIVA
TUGAS AKHIR
LAMPIRAN L2 - 24
1 Aktiva Lancar 1 HutangKas 3,907,879,656.52Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 3,907,879,656.52Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (276,755,400.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 3,211,124,257Rp
Total Aktiva Tetap 2,853,721,600.00Rp Total Modal 6,761,601,256.52Rp
6,761,601,256.52Rp 6,761,601,256.52Rp
1 Aktiva Lancar 1 HutangKas 7,768,273,785.91Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 7,768,273,785.91Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (553,510,800.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 6,794,762,986Rp
Total Aktiva Tetap 2,576,966,200.00Rp Total Modal 10,345,239,985.91Rp
10,345,239,985.91Rp 10,345,239,985.91Rp
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANBulan Ke - 12
AKTIVA PASIVA
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANTahun Ke - 2
AKTIVA PASIVA
TUGAS AKHIR
LAMPIRAN L2 - 25
1 Aktiva Lancar 1 HutangKas 11,628,667,915.30Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 11,628,667,915.30Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (830,266,200.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 10,378,401,715Rp
Total Aktiva Tetap 2,300,210,800.00Rp Total Modal 13,928,878,715.30Rp
13,928,878,715.30Rp 13,928,878,715.30Rp
1 Aktiva Lancar 1 HutangKas 15,489,062,044.69Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 15,489,062,044.69Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (1,107,021,600.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 13,962,040,445Rp
Total Aktiva Tetap 2,023,455,400.00Rp Total Modal 17,512,517,444.69Rp
17,512,517,444.69Rp 17,512,517,444.69Rp TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANTahun Ke - 4
AKTIVA PASIVA
AKTIVA PASIVA
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANTahun Ke - 3
TUGAS AKHIR
LAMPIRAN L2 - 26
1 Aktiva Lancar 1 HutangKas 19,349,456,174.07Rp Hutang Lancar -Rp Piutang -Rp Hutang Dagang -Rp Total Aktiva Lancar 19,349,456,174.07Rp Hutang Jangka Panjang
Kredit Bank -Rp 2 Aktiva tetap Total Hutang -Rp
Investasi 2,978,477,000.00Rp Instalasi & Surat Izin 152,000,000.00Rp 2 Modal Depresiasi (1,383,777,000.00)Rp Modal Usaha 3,550,477,000.00Rp
Laba ditahan 17,545,679,174Rp
Total Aktiva Tetap 1,746,700,000.00Rp Total Modal 21,096,156,174.07Rp
21,096,156,174.07Rp 21,096,156,174.07Rp
AKTIVA PASIVA
TOTAL AKTIVA TOTAL PASIVA
NERACA KEUANGANTahun Ke - 5
TUGAS AKHIR