Land Audit Management
System
Report on 2014 pilot and roll out 2015/16
Debbie Johns, Head of Performance Networks
Ian Jones, Streetscene Manager, Wakefield MDC
APSE LAMS
WHAT IS IT?
• A consistent quality audit of grounds (and
streets) maintenance standards
• Based on visual inspection of work standards
(not technical inspection)
• Trigger for immediate intervention at local level
• Data source for comparative Performance
Indicators at national level (real time & annual)
• Balance against cost & productivity PIs
• Simple to undertake & administer
APSE LAMS pilot 2014
• 8 authorities took part in the pilot between June
and October 2014
• Inspections took place in 3 batches in June,
August & October
• Results were published periodically to pilot
authorities
• Full anonymised report now published by APSE
• Review / working group meeting held in Penrith
on Feb 10th 2015
APSE LAMS pilot 2014
Inspection schedule (pilot)
Inspections
completed by
Results to APSE
by
Report back to
authorities by
20 June 27 June 4 July
22 August 29 August 5 September
24 October 31 October 7 November
APSE LAMS
Grading and Zones
All areas maintained are allocated a zone type
Zone 1 – High amenity
Zone 2 – General amenity
Zone 3 – Low maintenance
Detailed definitions & examples are supplied
APSE LAMS
Grading and Zones
Areas to inspect are randomly selected and ‘transects’ identified. These are graded & points awarded
Grade A – 3 points
Grade B – 2 points (acceptable standard)
Grade C – 1 points
Grade D – 0 points
Detailed standards will be published because consistency is ‘key’
APSE LAMS pilot 2014
LAMS and local specification standards
Local National
Frequency of inspections set
locally
Data input timetables must be
met
Number of inspections
(transects) per period/annum
Agreed minimum requirement
set by working group
Specification standards /
intervention levels
Grading standards
APSE LAMS pilot 2014
Outputs
Immediate intervention triggers
Monthly or bi-monthly published comparative performance data (APSE website and/or emailed reports)
Annual PI suite forming part of annual PN reports (including award PIs) :
- Overall performance score for year
- % of areas falling below 67 for year
- % of Zone 1 areas falling below 67 for year
- % of inspections per annum which are Grade A
- Table of Grades A - D
APSE Performance Networks Seminar
LAMS – Wakefield’s Approach
Ian Jones
Street Scene Manager
GM Review - Time for Change! Times of Austerity and Financial Challenge
When Street Scene services came into being we had full knowledge of the following
factors;
• The Revenue Budget
• The numbers on Grounds Maintenance establishment list
• The internal service departments we provide the service to through previously
delegated budgets
• The outdated Quality Specifications left over from CCT
• However, the key factors for which we didn’t have detail on were the following;
• How accurate was the Revenue Budget?
• How accurate was the establishment list?
• What was the individual cost to each of the internal service departments?
• how well was the service delivered?
Addressing the issues (GM Review)
T.O.R
• Quantify Land and Feature Volume
• Identify appropriate Method and Maintenance regimes
• Establish Resource Requirement
• Establish Cost of Service following review
• Re-introduce prescriptive schedules and formal monitoring
Time for Change!
Wakefield’s Approach to LAM’s
• 7 Areas
• 10 inspections per area
• Random selection
• 50 metre transect
• Officers/Supervisors
• 2 hours per Officer
• Photographic evidence
Wakefield’s Approach to Zones
• 3 Zone types
1 - High amenity - Civic Buildings, Bowling
Greens
2 - Standard amenity - Parks/Roadside
Features/Play Areas and POS
3 - Low Maintenance - All features 7 cuts or less,
Woodlands
• United Kingdom Woodland Assurance
Scheme (UKWS)
• Forestry Stewardship Council (FSC)
• 4 years accreditation at this global standard
Grading & Scoring Mechanism
Grade Description Score
A Maintained with enhancements 3 Points
B Maintained to standard 2 Points
C Maintained below standard 1 Point
D No evidence of any planned maintenance 0 Points
• United Kingdom Woodland Assurance
Scheme (UKWS)
• Forestry Stewardship Council (FSC)
• 4 years accreditation at this global standard
Wakefield’s Scores
Month No. Of
Inspections
Highest
achievable score
Actual score Breakdown
June 70 210
(3Pts *70 Inspections)
62.38% 62 x B(2) =124 Pts
7 x C (1) = 7 Pts
1 x D (0) = 0 Pts
131/210 = 62.38%
August 70 210 65.71% 68 x B (2) = 136Pts
2 x C (1) = 2 Pts
138/210 = 65.71%
October 70 210 66.19% 69 x B (2) = 138Pts
1 x C (1) = 1 Pt
139/210 = 66.19%
Summary 210 630 64.76% 199 x B (2) = 398
pts
10 x C (1) =10 Pts
1 x D (0) = (0 Pts)
408/630 = 64.76%
Wakefield’s Intervention Time Lines
• Set locally – its up to you!!
• From a B to A – Rarely achievable in Wakefield –
resource issue.
• C to B – up to two weeks from discussion with team.
• D to B – one week from discussion with team.
• United Kingdom Woodland Assurance
Scheme (UKWAS)
• Forestry Stewardship Council (FSC)
• 4 years accreditation at this global standard
Workload Profile
Reporting the Findings
• Report to T/Leaders any intervention works on the day of
inspection – if possible
• Arrange follow up inspections on completion of set time
line
• Area performance feedback at T/L meetings following
each tranche
• District performance feedback at GM operational
meetings following each tranche
• Common sense - uncomplicated approach
• Re-introduce prescriptive scheduling
• Consistent level of service delivery - Supported by
LAMS monitoring process
• To increase the performance returns from 64.76% to our
maximum – 66% during 2015
• Cross boundary inspections with neighbouring
authorities
Our Objectives
APSE LAMS
Getting started
• Decide how many areas you have got
• Identify inspectors and train them
• Index all sites (ideally by transect) and allocate
appropriate zones
• Only include areas that the section is responsible for
maintaining
• Recommended that photographs are taken to support
grading (especially C & D)
• Set intervention/response times locally
APSE LAMS
Results & conclusions from the pilot
• Authorities all felt that it was much easier, quicker and
cheaper to implement than they had expected
• There were no problems dealing with the planned
number of inspections
• Inspections could often be doubled up with other site
visit needs
• Results (overall) showed ranges from 64.65 to 75.79
(acceptable = 66.6)
• Agreed that ‘area’ analysis would be useful
APSE LAMS
Proposed changes & timescale
• Some minor changes (area ID, non responsibility flag for
hard surface weeds) to be made to the Inspection Form
(but agreed that authorities can use their own forms)
• Guidance Manual to be updated to further clarify
inspection standards
• Agreed that there should be a minimum of 10
inspections per ‘area’ per period
APSE LAMS
Proposed changes & timescale
• Agreed that frequency of inspection periods should be
chosen by each authority
• APSE to develop a ‘Training pack’ including training
presentation to aide implementation
• Look at cross-boundary inspections (voluntary)
Apse lams
Roll out 2015/16
• APSE to arrange roll out workshops regionally
throughout the UK in March/April
• APSE to produce a promotional flyer & form to register
interest
• LAMS is free to all Parks / Street Cleansing registered
authorities
www.apse.org.uk
www.apse.org.uk
Contact details
Debbie Johns
Head of Performance Networks
Email: [email protected]
Association for Public Service Excellence
2nd floor Washbrook House, Lancastrian Office Centre, Talbot
Road, Old Trafford, Manchester M32 0FP.
telephone: 0161 772 1810
fax: 0161 772 1811
web:www.apse.org.uk
Pioneering a new approach
to Parks in Richmond
David Allister, Head of Parks and Open Spaces
• Innovation and ownership – key ingredients for a successful parks officer
• Be leaders, not followers – set your own agenda
• A new framework contract – 2 yrs on
• The costs and benefits of developing our
own contracting framework
• What next?
Local context - Pride of Place in Richmond
Orleans House
Gardens
Garricks Lawn
Strawberry Hill House
Kew Gardens Hampton Court
Ham House
City Category Winners 2013
London Borough of Richmond upon Thames
94% Public
Satisfaction
Diamond Jubilee
Gardens
International Challenge
Winners 2014
Innovation and ownership – key
ingredients for a successful parks
officer?
This is what my team said: • Risk taker
• Considerate
• Balanced
• Knowledgeable
• Good Communicator
• Helpful
• Tolerant
• Patient
• Understanding
Humble
Negotiator
Mediator
Passionate
Conscientious
Thick skinned
Approachable
Friendly
Be able to make decent tea
Team player
Are you innovative at work?
Innovation: a new idea, device or process.
So are you innovative?
Do you take ownership at work?
Ownership: an attitude of accepting responsibility for
something and taking control of how it develops.
So do you take ownership?
But you need the right conditions for these
to spark
The Spark is Leadership and Direction
Be leaders, not followers – set
your own agenda
Strategic Principles
The quality of our Parks and Open Spaces will continue to define the London Borough of Richmond upon Thames.
Parks and Open Spaces will enrich the life, health and wellbeing of residents and visitors.
Richmond will lead in the delivery of excellent parks and open spaces services.
Richmond’s Parks will offer positive experiences to all visitors.
Through innovation, the future development of the parks will be ensured.
Increased community participation will be encouraged and supported.
The Parks and Open Spaces within Richmond will be centres of excellence and celebrated.
The management of Parks and Open Spaces will create a sustainable legacy for future generations
The Parks Service Vision
The London Borough of Richmond upon Thames’ parks and open spaces are recognised as outstanding, and enrich the quality of life of our residents and visitors.
We are proud of our achievements as leaders in the field, and are committed to maintaining and improving our existing high standards and expanding partnerships.
We will explore opportunities to maximise our assets and resources, and respond and adapt to change.
We will continue to lead as a service and develop new ways to deliver accessible experiences for all and make a positive contribution to the health and well-being of our residents.
We will continue to seek recognition for the excellent service delivery that we provide through consultation with our users and competition for awards.
Tools to help:-
• Awards and Accolades
• Friends Groups
• Publicity and marketing
• Raising team profile
• Speak up and be heard
• Speak to members
• Get the right team around you
• Work to a strategy –What do you want to achieve?
Parks Framework
A pioneering approach – 2 yrs on
What is a Framework Contract?
• Specialist jobs done by Specialist
contractors
• Meaningful performance
indicators
• Less client resource
• More flexible and shorter contract
– 4 years
• Output based
• Others can buy in and share
• Quality at the core
• Savings!
Contract Monitoring Lot name Supplier
Horticulture Services Continental Landscapes
Conservation Services Glendale Managed
Services
Arboriculture Services Gristwood & Toms
Oak Processionary Moth
control
Bartlett Tree Experts
Sports Services Continental Landscapes
Tennis Services Will to Win
Golf Services Glendale Managed
Services
Play Services Continental Landscapes
Event Management The Event Umbrella
Small Works Continental Landscapes
Parks Cleansing* Continental Landscapes
Street Scene Contract
Parks Warden Service* Park Guard Ltd
Monitoring Process
• Monthly Contract meetings – monthly data
• Minimum 7 KPI’s per contract
• Contract self monitoring and client monitoring
• Formal 6 month review
• Framework updates
The costs and benefits of developing our
own contracting framework.
• Staff time
• Procurement
costs
• Risk (financial &
reputational)
Savings
Output Control
Income
Reputation
Improved quality
Learning & continued
improvement
What Next? - Beyond 2017
• Client & Supplier learning
• Planning for future
• Re-design to meet the need
• Procurement and timing
• Team ownership
Try to think a little differently!
Questions?
Head of Parks
& Open Spaces
Parks Service
Manager
Parks Support Officer
Parks
Development Officer
Parks
Contract Manager
Arboriculture
Manager
Ecology Planning &
Policy Officer
(28hrs)
Arboriculture
Contract Monitoring
Officer
Arboriculture
Support Officer
Community Projects
Officer
Allotment Officer
Nottingham City Council, Parks and Open Spaces
Social Entrepreneurship & Commercialisation.
Eddie Curry MBA, HND (Horticulture)
Head of Parks and Open Spaces
APSE Best Service Team, Parks, Grounds and Horticulture
• The City
• The Service
• The Organisational and Team Culture
• The Strategy “Breathing Space”
•Horticultural Excellence
•Local Area Investment Plans
• Income Generation / Social Entrepreneurship &
Commercialisation .
•Future Vision and Opportunities
•Marketing and Promotion
•Conclusions
Introduction
World Class Heritage sites
• Nottingham Castle
• Newstead Abbey
• Wollaton Hall
Internationally renowned Sports Clubs and venues
• Trent Bridge
• Notts County FC
• Nottingham Forest FC
• National Ice Centre / Capital Arena
Regional Events Programme
• Splendour Music Festival
• Goose Fair
• Riverside Festival
• Light Night
Legendary sport and cultural Icons
• Brain Clough
• Robin Hood
• Lord Byron
The City
• Nottingham city Council is unitary authority,
• The City is Capital in the East Midlands region and is one of the eight English Core Cities.
• Population 305,700
• Greater Nottingham Population 640,000
• One of the six designated Science Cities
• Two universities have strengths across a wide range of science and technology sectors including biomedical sciences, ICT, environmental technologies and advanced engineering.
• Home to over 50 national and regional business head quarters
• Greater Nottingham’s creative industries include around 1,600 companies, employing about 15,000 people.
• City attracts over £34 million visitors per year
• City will see over 3.5bn invested over the next 10years
The City
Parks and Green Spaces
Total Number = 678
Total Hectares = 1,920ha
No of Green Flags = 20 +3
Community Green Flags = 12
Play Areas
Total Number = 109
63 improved over the last 5 years
19 Outdoor Gyms
Nature Reserves
Total Number ‘natural and semi natural’ = 117
Total Hectares = 358ha
Natural England LNR access PI = 0.5ha per 1,000 pop
No LNRS = 12 - 4 new in the last 2 years
No Of SSSI’S = 3
Allotments
Total Number plots = 2737
Direct let plots = 507 (52 derelict at Sneinton Dale)
Association Managed = 1535
St Ann’s HLF Restoration Project = 695
The Service
Cemeteries and Crematorium
Crematorium = 1
Operational Cemeteries = 3
Closed Cemeteries = 17
Nottingham In Bloom
Neighbourhood in Bloom awards = 137 (2010)
National Reputation for Horticultural excellence = 20
times winner East Midlands in Bloom; 4 times winner
Britain in Bloom; winner of Champions of Champions
No Sponsored sites = 35
Wicker Sculptures sponsored by BID = 12
Trees and Woodlands
No of ornamental trees = 100,000
Hectares of Woodlands = 155ha
The Service
The Organisational Culture
The Team Culture
1. Be realistic - rise up to the challenge of budget
reductions.
2. Be focused and drive efficiency savings & smarter
ways of working.
3. Focus on income generation - Maximise the
return on investment at all times.
4. Encourage social entrepreneurial activity and
create opportunities for commercialising service
delivery.
5. Insistence on VFM and Excellence in service
delivery
The proposals have been developed inline with
“Breathing Space” Adopted by Executive Board in
the strategy sets out a ten year (2010-2020)
framework for the maintenance and management of
the City’s Open and Green Spaces
Key objectives of “Breathing Space” include
• Improved quality facilities and infrastructure
• Horticultural skills and Improved / consistent grounds
maintenance standards
• Improved Safety - Visible site presence
• Improve Biodiversity and sustainability
A Strategic Vision for Nottingham’s Open and Green Spaces
‘Better quality, sustainable open and green spaces
that are accessible and inviting to use.’
Resulting in:
More people using open and green spaces
The Strategic Framework
• Horticultural Services Restructure 2009/10
returned Parks grounds maintenance to the Parks Service through the establishment of the new Horticultural Service team.
Improved consistency and improved team working.
• The team have greater pride and ownership and retain focused on specialised Horticultural Skills.
• Green Flag Standard Parks Maintenance Parks, Horticultural features and Sports facilities Horticultural Excellence / Bloom Features Biodiversity Climate Change Mitigation and Adaptation Arboriculture / Tree and Woodland Management.
• 30 new apprentices in the last 4 years.
The first horticultural and green space apprentices have completed.
• New Apprenticeship programme to be launched in January 2015
Horticultural Excellence
Open and
Green Space
Prioritised
Investment
Plans
Five years of strategic
development work has
helped identify priorities,
engaged the public and
secured political support.
Over the last 5 years
over £20 million of
external income has
been secured and
invested in Nottingham's
Parks
Social Entrepreneurship & Commercialisation .
Identifying specialist services that could trade.
1. Parks Development and Landscape architecture
2. Nursery Plant Production Retail & Trade Sales
3. Tree Services - external contract works
4. Cemetery and Cremation Services – additional
service options.
Identify who we can trade with and what the restriction are
1. Neighbouring authorities
2. Health service - Hospital sites
3. Utility contractors
4. Environment agency projects
5. Internal commissioning services e.g. Estates, Adults and Children's
6. The General Public
Income Generation
Carry out regular service reviews:-
1. Ensure that all Service tenancies, Leases and Management agreements are up
to date and delivering the maximum market rates.
2. Annually Review Fees and Charges for all service areas. Allotments Cem and
Crems, Parking Fees, parks activities etc.
3. Recognise that the mixed economy approach can maximise the return on
investment and increase the community involvement
Create new business opportunities and service e.g. .
1. Partnership with City Centre Retails Bid.
2. Horticultural and Biodiversity advice service
3. Development of the Park Rangers Forest Schools Programme
4. Developed a new memorials repairs team
5. Promote Sites for TV and Movies and Event Hire
6. Parking charges for appropriate sites
Ensure that all Parks Development activity:-
1. Creates income generating activities to sustain the project
2. Helps design out expensive maintenance tasks
Sponsorship, Corporate Social Responsibility and Charitable Giving
1. Corporate Sponsorship
Sponsorship contributions to Nottingham in Bloom Initiatives
have continued throughout the recessions and annually bring
over £100,000.
2. Corporate Social Responsibility
An unprecedented level of volunteering led by the Ranger
Service, which ran 156 volunteering sessions working with
1,286 volunteers from 35 community groups and corporate
partners, giving an ‘in kind’ value of £69,400.
3. Charitable Giving We now developing the Nottingham Parks Fund
1. Continue to deliver a high profile facility improvement and community activation
programme and identify opportunities to sell services to other councils.
2. Build partnerships with sporting governing bodies and professional sports clubs,
to enhance facilities and deliver programmes that help deliver Public Health
Outcomes and Police and Crime Commissionaire priorities.
3. Seek new opportunities to in source existing small works and larger capital
contracts. Securing internal income and helping to safe guard front line jobs.
4. Support internal corporate projects - Good to Great City Centre Initiative
5. Delivering a range invest to save projects. New horticultural retail outlet. New
urban park parking fees, new festivals, new burial options to maximise customer
choice.
6. Challenge existing business rates
Future Opportunities
1. Continue to Deliver our 2010-2020 Breathing Space
Strategic Framework.
2. Deliver our Manifesto Commitments and Corporate Priorities.
3. Continue to Innovate and remodel the service in order to
generate more income and deliver our budget savings
targets without reducing quality or service delivery.
4. Continued drive towards to reduce council subsidy and
achieve full cost recovery.
Future Vision
Marketing and Promotion of Services
1. Direct sales, Promotional leaflets ,
Web Site
2. Use of Face book and Twitter, with
now over 1,750 Face book followers
across the service.
3. Presentations at conferences,
including the national RHS Britain in
Bloom Forum, regional Bloom
conferences,
4. Hosting the launch of the RHS Britain
in Bloom Impact Report, with the
support of the community in the
Meadows.
5. National TV coverage hosting the
Royal Visit to Vernon Park.
6. Regular Radio and TV interviews
National and Regional Awards
7. Increased Political and Citizen profile
And Finally
1. Understand your Place
2. Link to Corporate Priorities
3. Create deliverable Strategies and clear
action plans
4. Create a Positive Team Culture
5. Continually look for new opportunities
fresh approaches both internally and
externally
6. Establish clear Vision and direction of
travel.
7. Market and promote your service