![Page 1: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/1.jpg)
LANDFILL CASE STUDY
![Page 2: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/2.jpg)
•AEA – CON SITES AUDITING INCLUDING LANDFILL
IN VICTORIA – A LOT OF AUDITOR INVOLVEMENT IN LANDFILLS
VERIFICATION AND CERTIFICATION OF DESIGN
APPROVAL OF MONITORING PLANS
APPROVAL OF RISK ASSESSMENTS
HYDROGEOLOGICAL ASSESSMENTS
OTHER STATES - ONLY INVOLVED IN SIGN OFF RELATED TO LANDUSE/CLASSIFICATION
![Page 3: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/3.jpg)
MELBOURNE SITE
•Historical uses of the property include
•market gardening (1892-1933),
•sand quarrying (1933-1985), average depth of 20m
•landfilling (1976-1989)
•filled with a mixture of soil, demo waste and some limited putresciblematerial
•No liner or capping of the landfill.
•Sandy soil, groundwater at 15m
•High Density Residential Development (in construction)
![Page 4: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/4.jpg)
MELBOURNE SITE
•Townhouse development proposed
•Environmental audits 53x conducted 1994, 1998 and 2011
•Evidence of landfill gas generation identified in 994 audit
•Methane generation rates have been estimated at•0.25 - 12.4L/s (1994 audit)•1.9L/s (1998 audit)• <0.54L/s (2011 audit)
•LFG management required for proposed residential development
•Based on gas flow, methane data, carbon dioxide data and calculated GasScreening Values (‘GSVs’) the CIRIA C665, it was concluded thatCharacteristic Situation 3 (‘CS3’) applies
![Page 5: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/5.jpg)
MELBOURNE SITE
Jfghjjhgfjghjghjg
GfdsgsdfGfdgJfghjjhgfjghjghjg
Gfdsg
sdfJfghjjhgfjghjghjg
GfdsgsdfGfdg
![Page 6: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/6.jpg)
MELBOURNE SITE
Jfghjjhgfjghjghjg
GfdsgsdfGfdgJfghjjhg
fjghjghjg
GfdsgGfdg
![Page 7: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/7.jpg)
MELBOURNE SITE
Jfghjjhgfjghjghjg
GfdsgsdfGfdgJfghjjhg
fjghjghjg
GfdsgGfdg
How to determine CGVUse max, mean, min flow and/or conc
![Page 8: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/8.jpg)
MELBOURNE SITE
Jfghjjhgfjghjghjg
GfdsgsdfGfdgJfghjjhg
fjghjghjg
GfdsgGfdg
![Page 9: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/9.jpg)
MELBOURNE SITE
Gas Vapour Barrier Design based on the CS3 which governs
•Geovent spacings•Active versus passive venting•Minimum venting area•Blanket thickness
2011 Audit required that an Auditor:
1) Approve the CEMP2) Monitors gas emissions from completed house venting systems3) Performance is ‘Good’ as per British Standard BS8485 (2007)
Code of Practice for the Characterization and Remediation fromGroundwater Gas in Affected Developments;
Methane concentration over 100% of the ventilation layer
<1% by volume at a wind speed of 1 m/s and<2.5% by volume at a wind speed of 0.3 m/s.
![Page 10: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/10.jpg)
MELBOURNE SITEVapour Design Summary
Barrier (top to bottom) DetailsGround Slabs 180-240mm thick poured concrete slab.Gas Membrane 1mm thick layer of LIQUID BOOT sprayed over
VI-20 geomembranePassive Ventilation System Interleaved geovent strips laid at 2m-3m spacings
Geovent strips connected to inlets/outlets.
Inlets at a height less than 1m above ground level
Risers constructed using 100mm diameter PVC
Risers extended to 1m above roof level
100mm layer of gravel
Sub-grade 1m of compacted clay
![Page 11: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/11.jpg)
MELBOURNE SITEVapour Design
![Page 12: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/12.jpg)
MELBOURNE SITE
![Page 13: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/13.jpg)
MELBOURNE SITE
![Page 14: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/14.jpg)
MELBOURNE SITE
![Page 15: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/15.jpg)
MELBOURNE SITE
![Page 16: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/16.jpg)
MELBOURNE SITE
![Page 17: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/17.jpg)
Outletconnected toLiquid BootGeovent.
Geovent
![Page 18: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/18.jpg)
VI-20
Spray appliedLiquid Boot
Trowel grade LiquidBoot detailing aroundpenetrations.
![Page 19: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/19.jpg)
MELBOURNE SITE
![Page 20: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/20.jpg)
![Page 21: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/21.jpg)
![Page 22: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/22.jpg)
MELBOURNE SITE
![Page 23: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/23.jpg)
MELBOURNE SITE
![Page 24: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/24.jpg)
MELBOURNE SITE
![Page 25: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/25.jpg)
MELBOURNE SITEISSUES
Stage 1A, Block D, Lot E08
Smoke testing of gas membraneidentified that a plumbing pipe hadbeen damaged and was providing apreferential flow path for smokebeneath the gas membrane.
Stage 1A, Block D, Lot E10Wall bracing contractors penetrated apipe associated with the gasmanagement system.
Stage 1A, Block HElectrical contractor cut hole throughgas membrane when relocating aconduit.
Stage 1B, Block L, Lot G07 Contractor using a grinder directly overgas membrane.
Stage 1A, Block A, Lots D02, 4, 7, 8,and 9.
Unable to repair breach in membranedue to overlying formwok for step.
![Page 26: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/26.jpg)
MELBOURNE SITEISSUES
![Page 27: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/27.jpg)
MELBOURNE SITEISSUES
![Page 28: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/28.jpg)
Vent system outlet
Dedicated sampling portextends to centre of gravellayer.
![Page 29: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/29.jpg)
Outlet vents hadbeen bricked in onentire block.
![Page 30: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/30.jpg)
Outlet on wrong side ofplinth (required coring,undesirable bend inoutlet riser pipe).
![Page 31: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/31.jpg)
Temporary wall bracing bolts breached outlet pipe.
![Page 32: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/32.jpg)
Sub-floor vapours being vented into basement during construction.
![Page 33: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/33.jpg)
Protective bollard in front ofpassive ventilation riser.
‘Soil vapour’ stickers used todifferentiate from other pipes.
![Page 34: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/34.jpg)
CQA plan needs to define roles andresponsibilities. Lowest potential for issues at theend of the job if: A single experienced contractor is responsible for every
aspect from design through to validation. Inspections are conducted by an independent third
party (as necessary). The responsibility and methods for demonstrating
compliance with the design are clearly defined beforecommencement.
![Page 35: LANDFILL CASE STUDY - monash.vic.gov.au · Gfdg Jfghjjhg fjghjghjg Gfdsg Gfdg How to determine CGV Use max, mean, min flow and/or conc. MELBOURNE SITE Jfghjjhgfjghjghjg Gfdsgsdf Gfdg](https://reader036.vdocuments.net/reader036/viewer/2022071212/60245acb7e85e458c2236671/html5/thumbnails/35.jpg)
MELBOURNE SITETake Home Messages
•It is possible to build over landfills and this has been done frequently in UKand USA
•Need to understand worst case? flux of methane rather than justconcentrations
•There are building guidelines available based on category of risk
•CQA plan is critical - Builders aren’t use to doing this, many trades involved,need a good PM/foreman
•Close inspection during installation is critical – suggest full timesupervision
•Liquid boot is good, provides quick assessment of leaks and easy to fix