What does the Waste & Recycling Centre include? Recycling Area Compost Pad Landfill What is a Master Plan? A holistic, long term plan for the design and development of a project or site Why is the City undertaking the Master Plan? Expand current Waste & Recycling Centre to ensure future capacity while keeping integrated waste management a priority Indoor Tipping Facility Landll Dual Recycling Area Indoor Tipping Facility Landll Compost Pad Scalehouse N Welcome Waste & Recycling Centre Master Plan Open House

Upload: others

Post on 30-Dec-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

What does the Waste & Recycling Centre include?

Recycling Area

Compost Pad

Landfill

What is a Master Plan? A holistic, long term plan for the design and development of a

project or site

Why is the City undertaking the Master Plan?

Expand current Waste & Recycling Centre to ensure future

capacity while keeping integrated waste management a priority

Indoor Tipping Facility

Land�ll

Dual

Recycling AreaIndoor Tipping Facility

Land�ll Compost Pad

Scalehouse

N

Welcome

Waste & Recycling Centre

Master Plan Open House

Page 2: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Project Process

Technical review

Public consulation (completed by June 2011)

Issues Collection - Door to Door Interviews (Feb 8 - March 8)

- Public Workshop (March 9)

Feedback Group Meetings (April 20, June 8)

Open Houses (May 4, June 22)

Facility design

County re-zoning (Fall, 2011)

Application to Alberta Environment by fall, 2011, for approval to

expand the facility as described in the Master Plan

What is the project process?

1.

2.

3.

4.

5.

Page 3: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Primary Issues

What have been the issues brought forward in the

Door to Door Interviews, Public Workshop and

Open House?

Environmental Protection

Traffic

Dust

1.

2.

3.

Litter Mngmt & Illegal Dumping

Concerns of Landfill Height

Recycling

4.

5.

6.

Page 4: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

AENV Approval Process

Step 1. FilingThe Application to Alberta Environment for the construction and operation of a Class II Landfill must be completed and submitted. The application must satisfy the requirements of the Approvals and Registration Procedure Regulation, and requirements of the Standards for Landfills in Alberta must be satisfied.

The Application must unclude the following information:

Section One: General InformationSection Two: Siting and Design RequirementsSection Three: Operation RequirementsSection Four: Monitoring and Analysis RequirementsSection Five: Reclamation, Closure and Post-Closure Care Requirements

City of Lethbridge proposed landfill development requires an Approval. Environmental Protection and Enhancement Act, Activities Designation Regulation requires any construction and operation of a landfill disposing of over 10,000 tonnes must have an Approval.

Approval Process Stages:

FilingNotice Requirements

ReviewDecision

Appeal

Step 2. Notice RequirementsPublic Involvement is a key component of the approval process: the Act requires that the public must be notified of all approval applications. Anyone directly affected by the application may submit a written statement to the Director outlining concerns, and may appeal the decision to issue the approval.

Step 3. ReviewThe review determines wether the landfill’s general and overall impact on the environment is in accordance with the Act and Regulations. The review addresses the design plans, site suitability, proposed monitoring programs.

Step 4. DecisionThe Director decides wether the approval for the landfill will be issued and under what conditions. Results of any public meetings and statements of concern are factored into the decision. Notice of the decision is provided to the City and to those individuals who filed statements of concern.

Step 5. AppealRequest for appeal can be submitted to the Environmental Appeal Board, an administrative tribunal established under the Act.

County of Lethbridge Rezoning & Development Application Process

Step 1. Application made to County of Lethbridge for amendment to Land Use Bylaw to REZONE from RA - Rural Agricultural to DC - Direct Control.

Step 2. County staff prepares Direct Control Bylaw.

Step 3. Direct Control Bylaw brought to County Council for 1st reading. Scheduling and notification of PUBLIC HEARING, usually a 30 day period.

Step 4. PUBLIC HEARING held, public has the opportunity to present to County Council in support or opposition to the proposed bylaw.

Step 5. Bylaw brought back to County Council for 2nd and 3rd reading. If bylaw does not pass 2nd or 3rd reading, No Rezoning Approval

Step 6. DEVELOPMENT PERMIT APPLICATION if County Council passes Bylaw at 2nd and 3rd reading.

Page 5: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Environmental Protection

Surface Water Protection

Retention ponds & ditches

Control runoff and run-on

Required setbacks from water bodies

Groundwater Protection

Siting - suitable soil conditions

Landfill design -

liners, leacheate collection, cover

Monitoring

Network of monitoring wells

Annual reporting to ABENV

Groundwater Monitoring

Testing Liner for Joint Leaks

Retention Pond

Construction of Clay Liner

Tire Shred

Leachate Collection

Leachate Management System

Retention Pond in Background

Page 6: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Environmental Protection

Air Quality Protection

Annual monitoring/reporting to Alberta Environment and

Environment Canada

Master Plan to investigate gas collection and management

City has allocated funding for gas management project in 2014

Landfill Gas Monitoring

Page 7: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Existing Development

12 years disposal capacity remaining

Constructed cells to a 30 meter depth

Maximum waste elevation approx. 10 meters above ground level

Recycling storage compounds

Concrete and rubble disposal area

Compost pad

Stormwater retention ponds

Page 8: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Proposed Development

10 Years

Looking north from entrance to site Looking west from scales

Elevation E

leva

tion

Station

872

874

876

878

880

882

884

886

888

890

892

894

896

898

900

902

904

906

908

910

912

914

916

918

920

922

PO

WE

RLI

NE

R

/W

CLOSED LANDFILL AREACELL 5

CELL 6

PO

WE

RLI

NE

R

/W

RO

AD

WAY

Landscaping PlanDevelopment Plan

Section A

Page 9: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Proposed Development

50 Years

Landfill Development Plan Landscaping Plan

RELOCATED ADMINISTRATION AREA- SCALES- RECYCLE AREA- COMPOST FACILITY- C & D RECYCLING- MAINTENANCE SHED

926.

0092

6.00

926.

0092

6.00

925.

0092

5.00

924.

0092

4.00

923.

0092

2.00

921.

00

920.

0092

0.00

922.00922.00

921.

00

920.

0092

0.00

920.00920.00

919.00918.00

917.00917.00

916.00916.00

914.00914.00

915.00

915.00

919.

0091

9.00

918.

0091

8.00

915.

0091

5.00

912.

0091

2.00

926.00926.00

925.00925.00

924.00924.00

920.00920.00

917.00

916.

0091

6 .00

913.

0091

3.00

9 21 .

0 0

924.00924.00

923.00923.00

921.00921.00

920.00920.00

924.00924.00

923.00

922.00922.00

921.00921.00

920.00920.00

926.00925.00925.00

924.00924.00

923.00923.00

922.00

922.00

920.00

922.00922.00

906.

009 0

8 .00

9 07 .

00

906.00906.00905.00

907.00

908.

0090

8.00

907.

0090

9.00

910.

0091

0.00

909.

0091

1.00

910.

0091

2.00

911.

00

906.

0090

5.00

907.

00

912.00911.00913.00914.00914.00

913.00915.00

Looking northwest from 43rd St

Plan View

Creates 50 years disposal capacity

Cells constructed to depth of 20 meters

Maximum waste elevation approx. 26 meters above ground level

Visual screening berms

Recycling storage compounds

Compost pad

Stormwater retention ponds

Asphalt and concrete recycling

Looking northwest from entrance

Page 10: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

1213

17

10

16

RELOCATEDADMINISTRATIONAREA IN 2048

PROPOSEDSTORMWATERRETENTIONPOND

SMRID CANAL

CAN

AL R

/W(0

71 6

377)

8

RELOCATED ADMINISTRATION AREA- SCALES- RECYCLE AREA- COMPOST FACILITY- C & D RECYCLING- MAINTENANCE SHED

O

I/R YY/MM/DD ISSUE/REVISION DESCRIPTION DRN ENGCHK DES IDR APP

DRAWING NUMBERPROJECT NUMBER ISSUE/REVISION-- --

AC01060153727

Proposed Landfill Staging Plan - CapspaceMaster Plan and Approval AmendmentLethbridge Waste and Recycling Centre Disposal SiteCity of LethbridgeLEGEND:

- CELL NUMBER7

711

1415RELOCATED ADMINISTRATION AREA- SCALES- RECYCLE AREA- COMPOST FACILITY- C & D RECYCLING- MAINTENANCE SHED

PROPOSEDSTORMWATERRETENTIONPOND

SMRID CANAL

CAN

AL R

/W(0

71 6

377)

O

PROJECT NUMBER-- --

060153727

Proposed Landfill Staging PMaster Plan and Approval ALethbridge Waste and RecyCity of LethbridgeLEGEND:

- CELL NUMBER7

Above Ground Development

Development Principles

Minimize footprint of landfill

Stay west on the existing footprint for as long as possible

Design for soil balance

Ensure above and below ground disposal capacity

STAGE YEARS VO (TO

5 2013-2016

6 2017-2021

7 2022-2027

8 2028-2031

9 2032-2035

10 2036-2038

11 2039-2041

12 2042-2043

13 2044 36

14 2045-2047

15 2048-2052

16 2053-2056

17 2057-2059

Site Development

Below Ground Development

Page 11: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

LitterWaste & Recycling Centre, Canals and

Adjacent Properties

What is being done to prevent litter?

Litter Control Protocols at Centre

- portable wind screens

- reduce size of active area of landfill

- closure of landfill during high winds

Transfer station and solid waste baler

- litter reduced by 50%

8 meter tall primary litter entrapment fence at edge of landfill

12 meter tall secondary litter entrapment fence east of landfill

City committed to continual improvement

- investigating new technolgy

- working with experts

What is being done to collect litter? Litter monitoring and collection program

Fence lines at Centre cleared of litter

Portable Wind Screens

Baled Waste in Landfill

Waste Being BaledPilot of Landfill Cover OptionLitter Entrapment Fencing

Page 12: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Haul Routes, Canals and Adjacent Properties

What is being done to prevent litter?

City has implemented a Secure Load Policy

Surcharges levied for unsecured loads

City will investigate options to further enforce Secure Load Policy

What is being done to collect litter? Litter collected by BFI

28 St N litter collected daily

43 St N litter collected twice per week

62 Ave N, litter collected weekly

Private property adjacent to haul routes entered (with permission) to collect

Every effort made not to disturb private property during sensitive times

Irrigation canals inspected regularly

St. Mary River Irrigation District collects litter from canals

Litter

Illegal Dumping

What does the City provide to prevent illegal dumping? Large Item Service

Free Saturday Disposal program

What does the City do to deal with illegal dumping? Regular Monitoring

Dumped material collected by BFI

Work with enforcement agencies

Page 13: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Traffic Distribution

What did the City do?

Engaged City Transportation Engineer to conduct comprehensive

traffic impact analysis

Assessed traffic flow with manual turning movement counts on

2 Saturdays and 2 weekdays in May, 2011

What did the City learn?

Approximately 95% of the traffic to and from the

Waste & Recycling Centre uses 28 St N

Saturday Weekday

Page 14: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Traffic Volumes

What did the City do?

Assessed traffic volume with continuous automated traffic counts

for 3 weeks

Forecast 2031 traffic volume using a 2% growth factor

2011 2031

Saturdays

2011 2031

Weekdays

What did the City learn?

Current roadway configurations and pavement types are

appropriate for the existing and forecast 2031 traffic volumes

Traffic assessment report has been submitted to the

County of Lethbridge and Alberta Transportation

Next Steps?

Page 15: Landll Waste & Recycling Centre Master Plan Open House · 2015. 3. 4. · - Public Workshop (March 9) Feedback Group Meetings (April 20, June 8) Open Houses (May 4, June 22) ... 91

Next Steps

How can I stay involved? Check out the City website at www.lethbridge.ca/wrc

Who can I contact? Where can I get more information?

Project Website: www.lethbridge.ca/wrc

Project Contact: Steve Rozee

Waste & Recycling Specialist

403-320-3114

[email protected]

Thank you!

What are the next steps?

Complete Master Plan

County rezoning application

Alberta Environment approval application