LANSDOWNE HIGH SCHOOLNovember 21, 2017
LANSDOWNE HIGH SCHOOL RENOVATION
PRELIMINARY DESIGN PRESENTATION
The Board of Education of Baltimore County
Verletta White, Interim Superintendent
LANSDOWNE HIGH SCHOOLNovember 21, 2017
• Project Location
• General Information
• Existing Conditions
• Structural Considerations
• Building Organization
• Recent Construction Project
• Educational Enhancements
• Project Schedule Overview
• Questions
AGENDA 2
LANSDOWNE HIGH SCHOOLNovember 21, 2017
VICINITY MAP 3
Lansdowne H.S.
LANSDOWNE HIGH SCHOOLNovember 21, 2017
PROJECT LOCATION – Regional Map Location 4
Lansdowne H.S.
295
I-695
I-95
I-895
LANSDOWNE HIGH SCHOOLNovember 21, 2017
PROJECT LOCATION – Neighborhood Location Map 5
Lansdowne H.S.
Lansdowne M.S.
Lansdowne E.S.
LANSDOWNE HIGH SCHOOLNovember 21, 2017
• Lansdowne High School - Renovation
• Enrollment Information
• Existing SRC 1,420
• Current Enrollment 1,346 (as of 10 -27-2017)
• Regional Programs
• Finance
• Arts & Communications
• Health Human Services
• Science Engineering and IT
• English Students of Other Languages
• School Construction History
• Original Building Construction 1963
• Additions 1967, 1971, 1973
• Major Renovations 2000 (science labs only)
GENERAL INFORMATION 6
LANSDOWNE HIGH SCHOOLNovember 21, 2017
EXISTING CONDITIONS - Lobby 7
LANSDOWNE HIGH SCHOOLNovember 21, 2017
EXISTING CONDITIONS – Media Center 8
LANSDOWNE HIGH SCHOOLNovember 21, 2017
EXISTING CONDITIONS - Corridor 9
LANSDOWNE HIGH SCHOOLNovember 21, 2017
PHASE I – Feasibility Study• Review of existing drawings & visual observation
Findings/Recommendations – February 2016:
• Evidence of building settlement
• Recommended crack monitoring of the music room wall
• Recommended repair/replacement of the music room slab
• Further investigation as design progresses
PHASE II – Additional Investigation – Preliminary Update• Enhanced building inspection
• Installed crack monitors – monitoring current through October 2017
• Scheduled geotechnical testing near music classroom and new elevators
Findings/Recommendations – July 2016:
• No evidence of any portion of the building moving towards the pond
• Needed results from geotechnical testing for final analysis
PHASE III – Additional Investigation• Continued enhanced building and site inspection
• Performed geotechnical testing (borings and test pits)
Findings/Recommendations – August 2016:
• Proposed the installation of structural piles under the music wall and slab
• Reported all structural concerns are correctable and will be rectified in the
renovation.
PHASE IV – Construction Documents 2017
• Include repairs of settlement issues, crack locations, and bowing wall.
STRUCTURAL CONSIDERATIONS 10
LANSDOWNE HIGH SCHOOLNovember 21, 2017
11
New Elevator
Lansdowne Road
STRUCTURAL MODIFICATIONS AND NEW ELEVATORS
2016 Soil Investigation Location
New Elevator
South Wall
Structural Piers
(2001)
Music Room Slab
Repair & West Wall
Structural Piers
(Proposed)
LANSDOWNE HIGH SCHOOLNovember 21, 2017
• Original Project
• Renovate every classroom: new technology, TV monitor, marker boards,
flooring, doors, ceiling and millwork
• Classroom designed for 1 to 1 tablet use by students
• Renovate library / media center including new digital learning classroom
• Renovate all art classrooms, food / nutrition lab
• Renovate administrative, guidance offices, health suite
• Renovate girls locker rooms
• Renovate technology education classrooms
• New TV studio
• 100% ADA accessibility throughout the building – at every level
• New auditorium seating and flooring.
• Expanded Scope of Work
• Add two classrooms
• Auditorium upgrades including new theatrical lighting and sound system,
acoustical panels, and new exterior metal panels
• New dance studio and sound system
• New recording studio
• New gymnasium sound system
• Add photovoltaic solar panel with teaching display
• Renovate boys locker room
SCOPE OF WORK - CURRICULUM 12
LANSDOWNE HIGH SCHOOLNovember 21, 2017
• Original Project
• Modify main entrance to create security vestibule
• Install new sprinkler system
• Upgrade security system
• New security cameras throughout the building and on building exterior
• New door access control
• New Elevators
• Expanded Scope of Work
• Add emergency generator
• Expanded bus loop
• Enclose exterior stairs
SCOPE OF WORK - SAFETY 13
LANSDOWNE HIGH SCHOOLNovember 21, 2017
• Original Project
• Roof replacement
• Install new HVAC system to include air conditioning
• Replace interior and exterior domestic water piping
• Replace interior and exterior lighting with LED lighting
• Repair floor settlement
• Repair exterior wall cracks
• Replace kitchen equipment
• Expanded Scope of Work
• New building entrance and lobby
• Corridor upgrades including new flooring and lockers
• New gymnasium flooring
• New exterior metal wall panels at auditorium
• New divider in activity room
SCOPE OF WORK - BUILDING 14
LANSDOWNE HIGH SCHOOLNovember 21, 2017
• Original Project
• Site work at new elevators
• Site work at new chiller
• Temporary classroom related site work
• Expanded Scope of Work
• Expanded bus loop to better isolate bus and car traffic
• Add six (6) parking spots near main entry
• Repave parking lot and add new LED lighting
• Create 40 new parking spaces at stadium lot
• New bleachers, press box, and toilet rooms / concessions building at stadium
• New track running surface and field event areas
• New tennis court surface and nets
SCOPE OF WORK - SITE 15
LANSDOWNE HIGH SCHOOLNovember 21, 2017
16PROJECT LOCATION – Aerial Map
Site Work Enhancement
New Entrance / Addition
LANSDOWNE HIGH SCHOOLNovember 21, 2017
17EDUCATIONAL ENHANCEMENT – Existing Bus Loop and Entrance
LANSDOWNE HIGH SCHOOLNovember 21, 2017
18EDUCATIONAL ENHANCEMENT – New Entrance with Expanded Bus Loop
LANSDOWNE HIGH SCHOOLNovember 21, 2017
BUILDING ORGANIZATION – Proposed First Floor Plan 19
Main
Entrance
Classrooms
Auditorium
Administration
Guidance
Health
Media Center
Food Service
Physical Education
ADA Ramp
Elevator to Locker Rooms
ADA Lift
ElevatorDual Entrance
Connects Four Levels
ADA Lift
ADA Ramp at Gym Entrance
LANSDOWNE HIGH SCHOOLNovember 21, 2017
BUILDING ORGANIZATION – Proposed Second Floor 20
Classrooms
Auditorium
LANSDOWNE HIGH SCHOOLNovember 21, 2017
EDUCATIONAL ENHANCEMENT – Existing Entry/Administration 21
LANSDOWNE HIGH SCHOOLNovember 21, 2017
Main
Entrance
22EDUCATIONAL ENHANCEMENT – Proposed Entry/Administration
Main
Entrance
LANSDOWNE HIGH SCHOOLNovember 21, 2017
23EDUCATIONAL ENHANCEMENT – Existing Building From Parking Lot
LANSDOWNE HIGH SCHOOLNovember 21, 2017
24EDUCATIONAL ENHANCEMENT – New Entrance Addition
LANSDOWNE HIGH SCHOOLNovember 21, 2017
25EDUCATIONAL ENHANCEMENT – Existing Building From Bus Loop
LANSDOWNE HIGH SCHOOLNovember 21, 2017
26EDUCATIONAL ENHANCEMENT – New Entrance Addition
LANSDOWNE HIGH SCHOOLNovember 21, 2017
27EDUCATIONAL ENHANCEMENT – Existing Media Center
Group
Instruction
Area
Work Room
Learning
AreaOffice
Book Area
LANSDOWNE HIGH SCHOOLNovember 21, 2017
28EDUCATIONAL ENHANCEMENT – Existing Media Center
LANSDOWNE HIGH SCHOOLNovember 21, 2017
29EDUCATIONAL ENHANCEMENT – Proposed Media Center
Collaborative
Learning Area
Soft Seating
Digital
Learning/
Maker Space
Group
Instruction
Area
Group
Instruction
Area
LANSDOWNE HIGH SCHOOLNovember 21, 2017
30
Architectural Rendering
EDUCATIONAL ENHANCEMENT – Proposed Media Center
LANSDOWNE HIGH SCHOOLNovember 21, 2017
31
Architectural Rendering
EDUCATIONAL ENHANCEMENT – Proposed Media Center
LANSDOWNE HIGH SCHOOLNovember 21, 2017
32EDUCATIONAL ENHANCEMENT – Typical Classroom - Existing
LANSDOWNE HIGH SCHOOLNovember 21, 2017
33EDUCATIONAL ENHANCEMENT – Typical Classroom - Proposed
LANSDOWNE HIGH SCHOOLNovember 21, 2017
34EDUCATIONAL ENHANCEMENT – Typical Classroom - Proposed
LANSDOWNE HIGH SCHOOLNovember 21, 2017
35EXISTING GYMNASIUM
LANSDOWNE HIGH SCHOOLNovember 21, 2017
36RENOVATED GYMNASIUM
LANSDOWNE HIGH SCHOOLNovember 21, 2017
37EXISTING AUDITORIUM
LANSDOWNE HIGH SCHOOLNovember 21, 2017
38PROPOSED AUDITORIUM
LANSDOWNE HIGH SCHOOLNovember 21, 2017
EXISTING STADIUM 39
Softball
Field
Existing Storage
Buildings
Field Event
Area
Existing
Bleachers
LANSDOWNE HIGH SCHOOLNovember 21, 2017
PROPOSED STADIUM PARKING / CONCESSION BUILDING / BLEACHERS 40
New Concession
Building / Toilet Rooms
New
Parking
New Bleachers
Press Box
LANSDOWNE HIGH SCHOOLNovember 21, 2017
STADIUM ENTRANCE / CONCESSION BUILDING 41
LANSDOWNE HIGH SCHOOLNovember 21, 2017
PROJECT SCHEDULE OVERVIEW 43
Phase/Activity Date
Original Desk Kick-Off December 2015
Design | Restart June 2017
Board Approved the Project Under State Capital September 2017
Improvement Program Submission
Community Engagement December 2017
Advertisement for Bid January 2018
Board Approval April 2018
Notice to Proceed May 2018
Site Package Advertise to Bid July 2018
Site Package Board Approval October 2018
Substantial Completion August 2020
Thank You