large communications foundation for towers up...
TRANSCRIPT
A Robust and Versatile Foundation For Communications Towers
The ARE Large Communications Foundation permits quick, concrete-free same-day installation with the advantage of later reuse or recycling.
• Fast:Complete tower installation in one day
• Concrete-Free:Eliminates cost and cure-time
• Versatile: Structure can be buried or left above ground with ballast
• Removable: Entire tower and foundation can be removed, transported and assembled elsewhere
413 Wacouta Street, Suite 440Saint Paul, MN 55101 USA
AMERICAN RESOURCE & ENERGY
(651) [email protected]
D-020-REV B 4-13
LargeCommunicationsFoundationFor Towers Up to 43 m (140 ft)
All components are disassembled for shipment. Shown components have a Bitumen coated surface for below-ground applications.
WhyARE?
• Custom design and best-in-class engineering using the industry’s most in-depth fatigue and frequency analysis
• American-owned manufacturing facility in Shanghai is ISO 9001 certified for quality assurance (local manufacture available)
• Products ship globally from world’s lowest cost center for logistics
• American-grade GR 50/55/65 low-silicon steel ensures strength and durability
• American Welding Society (AWS) D1.1 and CSA W47.1 certified welders for best-in-class construction
Leading Innovation in Communications Structures
Movable or Permanent - IdealforRemoteSitesorTemporaryInstallations
Specifications
Tower Height Up to 43 m (140 ft) depending on load requirements
Material Steel with galvanized (above ground) or bitumen (below ground) finish for corrosion protection
Ballast Sand, gravel or soil, geo bags or concrete blocks (above ground) or backfilled soil (buried)
Survival Wind Speed Per site requirements
Shipping Indivdual or container
Warranty Five Year
Above ground: Trough for sand, gravel or soil
Below ground: Truss with backfill
LargeCommunicationsFoundationFor Towers Up to 43 m (140 ft)
ConfigurationOptions
413 Wacouta Street, Suite 440Saint Paul, MN 55101 USA
AMERICAN RESOURCE & ENERGY
(651) [email protected]
D-020-REV B 4-13
Sidewalls and ballast are required for above ground inststallations.