laser projection keyboard kit quick assembly manual€¦ · laser projection keyboard kit quick...
TRANSCRIPT
1 / 10
Laser Projection Keyboard Kit
Quick Assembly Manual
RoboPeak Team
2013-4
Revision: 0
Your laser projection keyboard kit needs to be assembled before you can use it. This
manual will provide you the instructions to assemble the RoboPeak laser project
keyboard kit quickly and easily.
2 / 10
Parts List in the kit
<需要图片:套件包装盒打开效果照>
The following parts are included in the laser projection keyboard kit. Please pay attention to the
Item No. in the list. The item No. will be used to identify which part will be used in the following
assembly instructions.
Side Frame x2
Front Panel x1
Camera Dock x2
Bottom Base
x1
Pattern Projector
Dock x1
Linear Laser
Locker x1
Nylon column x2
Infrared Light
Camera x1
Keyboard Pattern
Projector x1
Linear Laser x1
1
2
3 4
5 6
7 8
9 10
3 / 10
Power & Sockets
PCB x1
Camera Signal
Cable x1
Screw Cap x8
Self-tapping
Screw x2
Screw pad x4
5mm Screw x4
10mm Screwx4
12mm Screw x7
16mm Screw x6
11 12
13 14
15
16
17
18
19
4 / 10
STEP#1 Base Frame Assembly
Please prepare the base frame units with the item No. ○1 ,○2 ,○3 and the screws with No. ○19
and the screw cap ○13 . Please assemble them based on the following figures.
Pay attention to the side of the camera dock ○3 .
1 x2
1 1
3
2
2
3
x1
x1
13 x6
19 x6
13+19
13+19
5 / 10
STEP#2 Bottom Base Installations
Place the bottom base ○4 in the bottom of the assembled frame and use the screw ○16 to fix it.
4 18
18
18
18
4
4 x1
18 x4
6 / 10
STEP#3 Mounting the Keyboard Pattern Projector
Mount the keyboard pattern projector ○9 to the dock ○5 and use the self-tapping screw ○14 to
fix them.
Place the assembled projector parts to the base frame as depicted in the following figure. Use
the screw ○18 and the screw cap ○13 to fix them. Make the power cable of the projector go
through the hole of the front panel.
9 5
14
9
5
5
9
14
x1
x1
x2
18 18
13 13
13
18
x2
x2
7 / 10
STEP#4 Mounting the Infrared Light Camera
Fix the Nylon column ○7 on the camera ○8 with the screws ○16 :
Mount the camera to the base frame using screw ○17 :
16
7 7
8 7
7
8
7
8
16
x2
x1
x2
17
17
17 x2
8 / 10
STEP#5 Linear Laser Installations
Install the linear laser ○17 to the bottom base as shown in the following figures. Place the locker
○6 on the laser and use the screws ○6 to fix them. Insert the screw ○18 on the top of the locker
○6 , but do not tighten it currently.
Check the linear laser in front of the front frame. Please make sure the wavy stripe in the linear
laser head is perpendicular to horizontal plane. After that, the screw ○18 can be tightened.
16
6
10
18
6
16
18
10
x1
x1
x2
x1
9 / 10
STEP#6 PCB Installations and connecting the cables
Place the screw pads ○15 on the screw holes of the bottom base:
Place the PCB ○11 on the bottom base and use the screws ○18 to fix them. Connect all the cables.
Don’t forget to connect the camera ○8 to the PCB using the signal cable ○12 :
15 15
15 x2
11
18
18
12
12
11
18
x1
x1
x2
10 / 10
Finished!
Now your laser projector kit is ready to work. Before the first use, please follow the instructions
of the calibration manual.