last date for confirmation - ieema | your link to...

11

Upload: ngoduong

Post on 14-May-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011
Page 2: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011

Last Date for Confirmation 10th October 2011

IEEMA DIRECTORY 2012 ADVERTISEMENT TARIFF / BOOKING FORM

Directory Size: A4 (210 mm Width x 297 mm Height)

Advertisement Particulars Advertisement Tariff in Rupees

Please tick (a) as per requirement

Front Cover Gatefold Colour 2,00,000

Cover 2 (Inside Front) Colour 1,00,000

Cover 3 (Inside Back) Colour 80,000

Cover 4 (Outside Back) Colour 1,50,000

Full Page Colour 50,000

Bookmark (non-exclusive) Colour 60,000

Bleed Colour 25% extra

Payment: Payment for advertisement should be made in advance by Cheque/DD in favour of IEEMA” payable at ‘Mumbai’. Remittance by electronic mail transfer can also be made in favour of IEEMA. Our IFSC code is BKID0000049 of Bank of India, Worli Naka Branch, Mumbai 400 018.

Confirmation for Advertisement Booking in IEEMA Directory 2012

We confirm our booking of advertisement for the above marked position in IEEMA Directory 2012 and we are enclosing herewith our Cheque/DD No. dated of Rs. towards the same.

Name:

Designation: Signature:

Company:

Address:

Tel : Fax: STD CODE NUMBER NUMBER

Email: Website:

Stamp of Company

Page 3: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011

Important information:1. Directory Size: A4 (210 mm W x 297 mm H)2. Technical requirements Bleed : 303 mm H x 216 mm W Trimmed : 297 mm H x 210 mm W Front Cover Gatefold : 260mm H x 360mm W Full Page Print Area : 260mm H x 18Omm W Book Mark : 160 mm H x 40 mm W3. Advertisement Material: (Deadline for submission is 15th October 2011)4. Production cost incurred as a result of advertising material being supplied in an incorrect format will be charged to the advertiser5. Advertiser will be solely responsible for contents of the advertisement/ violation of any law in the contents/ actions arising from contents.6. Advertisement release orders are valid only when accompanied by full remittance by Cheque / DD drawn in favour of “IEEMA”, payble at Mumbai. Remittance by electronic mail transfer can also be made in favour of IEEMA. Our IFSC code is BKID0000049 of Bank of India, Worli Naka Branch, Mumbai 400 018.7 Advertisement material should be provided in one of the following electronic formats with desired colour output. a. TIFF with 400 dpi resolution b. PDF with high resolution suitable for printing c. CDR version 12 with all text converted to curves and at 400 dpi resolution d. JPG/JPEG with 400 dpi resolution e. PSD/PS version CS1 with 400 dpi resolution and at actual print size. Contact Person : Ms. Priya Soman Address : 501, Kakad Chambers, 132, Dr. Annie Besant Road, Worli, Mumbai 400 018 Tel.:+91 (0)22 2493 0532 Fax:+91 (0) 22 2493 2705, E -mail: [email protected]

8. Please keep a copy for your record sent to us for your future reference.

Page 4: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011

Last Date for Submission: 10th October 2011

IEEMA DIRECTORY - 2012 MEMBER LISTING FORM

1. Name of Organisation:

Name to be printed in Directory as :

2. Year of Establishment:

3. Website:

4. SSI Status: o Yes o No

If Yes, Registration No:

5. Annual Sales: (2010-2011)

a. Turnover in Rs. Crores:

b. Export Turnover in Rs. Crores:

6. Number of Employees: Total Manager/s Engineer/s

7. Certification:

a. System Certification: o IS0 9001-2008 o ISO 14000

Others (Please specify):

b. Product Certification o BIS o IEC o KEMA o UL o ASTA

Other/s (Please specify):

8. Chief Executives:

a. Name of Chairman:

Tel: Fax: STD CODE NUMBER NUMBER

Email:

b. Name of Managing Director:

Tel: Fax: STD CODE NUMBER NUMBER

Email:

c. Name of Chief Executive Officer:

Tel: Fax: STD CODE NUMBER NUMBER

Page 5: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011

9. Addresses

A. Registered Office

Address:

Tel: Fax: STD CODE NUMBER NUMBER

Contact person: Email:

B. Head Office

Address:

Tel: Fax: STD CODE NUMBER NUMBER

Contact person: Email:

C. Marketing Office/s (Attach separate sheet for more details)

a. Address:

Tel: Fax: STD CODE NUMBER NUMBER

Contact person: Email:

b. Address:

Tel: Fax: STD CODE NUMBER NUMBER

Contact person: Email:

D. Works: (Attach separate sheet for more details)

a. Address:

Tel: Fax: STD CODE NUMBER NUMBER

Contact person: Email:

b. Address:

Tel: Fax: STD CODE NUMBER NUMBER

Contact person: Email:

Page 6: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011

E. Office/s Abroad:

1.

2.

3.

10. Name of Bankers and their contact details:

1.

2.

3.

11. Collaboration details: (Attach separate sheet for more details)

a. Product/s:

Company Name:

Address:

Tel: Fax: STD CODE NUMBER NUMBER

Contact person: Email:

b. Product/s:

Company Name:

Address:

Tel: Fax: STD CODE NUMBER NUMBER

Contact person: Email:

12. Products and Services:

a. Products Manufactured:

b. Products Marketed:

c. Service/s:

Page 7: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011
Page 8: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011

Last Date for Submission: 10th October 2011

Company Name:

Address:

Name of Official:

Designation:

Tel: Fax: STD CODE NUMBER NUMBER

Email:

Contact details of your responsible person for queries/clarifications.

Index to Product GroupsA - Cables & Accessories J - Industrial Control and B - Capacitors (Fixed/Variable) Automation Systems C - Conductors & Accessories K - Instrument Transformers D - Consumer Products L - Instruments-Sensing, E - Design & Consultancy Measuring, Indicating, F - Electrical / Electronics Testing etc. Components & Accessories M - Insulating Materials G - Energy Meters N - Insulators H - Engineering Projects O - Lifts & Escalators I - Generators & Generating P - Lighting & Lighting Accessories Equipments

Q - Medical EquipmentR - MotorsS - Power ElectronicsT - Software ServicesU - Stampings & LaminationsV - Switchgear & ControlgearW - TransformersX - Transmission Line Towers & Accessories Y - Winding Wires Z - Other Products

A - Cables & Accessories

1. Communication Cables a) Jelly Filled o b) Optical Fibre Cables o 2. Control Cables a) FR/FRLS o b) PVC o 3. HT Power Cables a) FR/FRLS o b) Paper Insulated o c) PVC o d) XLPE o 4. Instrumentation Cables a) Telecommunication Cables o b) Thermocouple Extension/ o Compensating Cables 5. LT Power Cables a) FR/FRLS o b) PVC o c) XLPE o 6. Special Purpose Cables a) Housewiring o b) Mining Cables o c) Submarine Cables o d) Trailing Cables o e) Welding Cables o

7. Cable Accessories a) Cable Fault Locators o b) Cable Guards o c) Cable Jointing Kits o d) Cable Terminations o e) Cable Ties o f) Cable Trays o g) Clamps & Cleats o h) Conduits & Conduit Fittings o 8. Other (PI. specify) o

B - Capacitors (Fixed/Variable)

1. DC Electrolytic Capacitors o 2. Energy Storage Capacitors o 3. Harmonic Filter Capacitors o 4. Medium Frequency o Capacitors 5. Motor Starting Electrolytic o Capacitors 6. Shunt & Series Power o Capacitors - HV 7. Shunt & Series Power o Capacitors - LV 8. Other (PI. specify) o

C - Conductors & Accessories

1. Aluminum Bars, Rods

a) AL Busbars/Flats o

b) AL Conductors (AAC) o

c) AL Conductor Steel o

Reinforced (ACSR)

d) AL foil for Power Capacitors o

e) All Aluminium Alloy o

Conductors (AAAC)

f) All Aluminium Alloy Conductor o

Steel Reinforced (AACSR)

2. Copper Bars, Rods, Strips, Plates, Sheets etc. a) Bare Copper Conductors o

b) Coils of Refined Cu/Cu-Zn o

based Alloys/ Other Cu Alloys

c) Copper Busbars o

3. Accessories a) Cu/AI Braided Connectors, o

Jumpers

b) Other (PI. specify) o

Page 9: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011

D - Consumer Products

1. Dryers o 2. Fans o 3. Grinders, Mixers, Juicers o 4. Refrigerators/Airconditioners o 5. Vacuum Cleaners o 6. Washing Machines o 7. Microwave Ovens/Grills o 8. Others (PI. specify) o

E - Design & Consultancy

1. Complete Electrification a) Electrification of Air Ports, o Shipyards, Harbours

b) Electrification of Commercial o

Establishments, Hotels,

Hospitals etc.

c) Electrification of Industrial o

Plants

d) Railway Electrification o 2. Industrial Automation o 3. Power Project a) Gas & Diesel Power Stations o b) Hydro-Electric Power Stations o c) Thermal Power Stations o d) Nuclear Power Stations o e) Wind/Solar Power Stations o 4. Switching Stations and Switchyards a) Load Despatch Centres o b) Switchyards for Generating, o Receiving & Interconnecting Stations 5. Transmission Line and o Towers Erection

F - Electrical / Electronics Components & Accessories

1. Adaptors o 2. Enclosures (for Various o Conditions such like Flame proof, Hazardous area etc.) 3. Filters o 4. Grounding System and o Related Accessories a) Earth Electrodes o b) Earth Resistors o 5. Junction Boxes o 6. Light Emitting Diodes (LEDs) o 7. Metal Oxide Varistors o 8. Printed Circuit Boards (PCBs) o 9. Resistors, Resistance Boxes, o Rheostats 10. Silicon Diodes o 11. Thermistors o 12. Thermocouples o 13. Thermostatic Bimetal Strips o 14. Thyristors/SCRs o 15. IGBTs/ MOSFETs o 16. Others (PI. specify) o

G - Energy Meters 1. Single Phase o Electromagnetic Energy Meters 2. Single Phase Solid State o

Energy Meters 3. Three Phase o Electromagnetic Energy Meters 4. Three Phase Solid State o Energy Meters 5. VAR Meters - Analog & Digital o H - Engineering Projects 1. Complete Electrification a) Electrification of Air Ports, o Shipyards, Harbours b) Electrification of Commercial o Establishments, Hotels, Hospitals etc. c) Electrification of Industrial Plants o d) Railway Electrification o 2. Industrial Automation a) CNC Machine Controls o b) Manufacturing Systems o c) Process Controls o 3. Power Projects a) Diesel Power Stations o b) Gas Power Stations o c) Hydro-Electric Power Stations o d) Thermal Power Stations o e) Nuclear Power Stations o f) Wind/Solar Power Stations o 4. Switching Stations and Switchyards a) Load Despatch Centres o b) Switchyards for Generating, o Receiving & Interconnecting Stations 5. Transmission Line and Towers Erection a) Transmission Line and Towers o above 145Kv b) Transmission Line and Towers o upto 145Kv

I - Generators & Generating Equipments

1. AC Generators (Alternators) a) HT Alternators o b) LT Brushless Alternators o c) LT Slip Ring Alternators o 2. DC Generators o 3. Diesel Generator Sets o 4. Turbine Generator Sets a) Gas Turbine Generator Sets o b) Hydro Turbine Generator Sets o c) Steam Turbine Generator Sets o d) Mini/Micro Hydels o 5. Boiler o 6. Balance of Plant Equipment o J - Industrial Control and Automation Systems 1. Amplifiers o 2. Analysers o 3. Controllers o 4. Counters o 5. DCS/SCADA-Supervisory o Controls and Data Acquisition 6. Encoders o 7. Programmable Logic o Controllers

8. Timers o 9. Transducers o 10. Transmitters o 11. Others (PI. specify) o

K - Instrument Transformers 1. Capacitor Voltage o Transformers 2. Current Transformers o 3. Voltage Transformers o

L - Instruments - Sensing, Measuring, Indicating, Testing etc. 1. Calibrators o 2. Function Generators o 3. Impulse Generators o 4. Indicating Instruments a) Alarm Annunciators o b) Aplha-Numeric Mimic Displays o c) Event Recorders and Loggers o d) Fire Alarm Equipment o e) Phase Sequence Indicators o 5. Measuring Instruments a) Ammeters-Analog & Digital o b) Capacitance Meters o c) Frequency Meters o d) Multimeters o e) Ohmmeters o f) Power Factor Meters o g) Tachometers o h) Voltmeters-Analog & Digital o 6. Scanners 7. Sensing Equipment a) Limit Switches o b) Micro Switches o c) Photo Electric Detectors o d) Position Detectors o e) Proximity Switches/ Detectors o f) Timer Switches o 8. Testing Equipment a) Battery Test Equipment o b) Dielectric Test Equipment o c) High Voltage Testing Equipment o d) Line Fault Locators o e) Oil Testing Equipment o f) Oscilloscopes o g) Synchroscopes o h) Test Benches o i) Others (Pl. specify) o 9. Others (Pl. specify) o

M - Insulating Materials 1. Films & Composites a) Composites of paper o b) Composites of Synthetic Papers o & Non Wovens c) Films for Cables o d) Films for Capacitors o e) Films for Electrical Insulation o f) Films for Rotating Machines o g) Films for other components o 2. Glass Fibre and Articles a) Glass Epoxy Laminates o b) Glass Fibre Laminates o c) Tapes & Sleeve-Varnished/ o Unvarnished

Page 10: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011

3. Luminaire a) Commercial Decorative o

Lighting Luminaire

b) Floodlights o

c) Hazardous Area Lighting o

Luminaire

d) Industrial Lighting Luminaire o e) Street Lighting Luminaire o

f) Others (PI. specify) o 4. Accessories a) Ballasts o

b) Chokes o c) Dimmers o

d) Electric Ignitors o e) Lamp Holders o f) Starters o

g) Other (PI. specify) o

Q - Medical Equipment (PI. specify) o

R - Motors 1. AC Motor a) 3 Phase Slip-Ring Induction o

Motors

b) 3 Phase Squirrel Cage o Induction Motors

c) AC Synchronous Motors o d) Single Phase AC Induction o Motors 2. DC Motors a) Series o b) Series-Shunt o c) Shunt o 3. Linear Motors 4. Micro Motors 5. Servomotors 6. Stepper Motors 7. Universal Motors 8. Parts for Motors a) Brush Holders o b) Carbon Brushes o c) Commutators o d) Diecast Rotors o e) Slip Rings o f) Other (PI. specify) o 9. EFFI Motors o 10. Other (PI. specify) o

S - Power Electronics

1. AC Drives o 2. Battery & Battery Charges o

3. Converters and Inverters o

4. DC Drives o 5. Medium/High Frequency o Furnace Inverters

6. Rectifiers o 7. Uninterrupted Power Supply (UPS) o a) Upto& including 5 KVA o b) Above 5 KVA o 8. Voltage Regulators o 9. Other (PI. specify) o

T - Software Services 1. Industrial Automation a) CNC Machine Controls o b) Manufacturing Systems o c) Process Controls o 2. Information Technology o

U - Stampings & Laminations 1. Cold Rolled Grain o Oriented Sheet Steel 2. Cold Rolled Non-Grain o Oriented Sheet Steel 3. Electrical Steel Lamination o for Transformers 4. Electrical Steel Stamping o for Fans 5. Electrical Steel Stamping o for Meters 6. Electrical Steel Stamping o for Motors / Alternators 7. Hot Rolled Dynamo Grade o Steel Sheets 8. Others (PI. specify) o

V - Switchgear & Gontrolgear 1. Auxiliary Contactors o 2. Control Panels/Desks o 3. Control Relays a) Electromechanical o b) Static o 4. Distribution Boards o 5. HT Circuit Breakers a) Bulk Oil Circuit Breakers o b) Minimum Oil Circuit Breakers o c) SF6 Circuit Breakers o d) Vacuum Circuit Breakers (VCB) o 6. HT Fuses a) Drop-out Fuses o b) HRC Fuses o 7. Air/Gas Insulated o Switchgear (AIS/GIS) o 8. Ring Main Units (RMU) o 9. Isolators/Load Disconnectors o 10. Lightning Arresters o 11. LT Circuit Breakers a) Air Circuit Breakers (ACB) o b) Earth Leakage Circuit o Breakers (ELCB) c) Miniature Circuit o Breakers (MCB) d) Moulded Case Circuit o

Breakers (MCCB) 12. LT Fuses a) HRC Fuses o b) Rewirable Fuses o 13. LT Switches a) Changeover Switches o b) Domestic Switches o c) Double Break Switches (Power) o d) Knife Switches o e) Micro Switches o f) Push Button Switches o g) Rotary Switches o h) Selector Switches o i) Timer Switches o 14. Motor Control Centers o

3. Insulating Oil a) Capacitor Oil o b) Switchgear Oil o c) Transformer Oil o d) Other Insulating Oil o

(PI. specify)

4. Insulating Varnishes & Enamels a) Natural Resin Enamels ob) Synthetic Enamels oc) Impregnating Varnishes for o

Electrical Insulating purpose

5. Jellies/Compounds for Cable 6. Mica and its Articles 7. Paper, Paper Board and Articles a) Paper Reels ob) Paper Boards o c) Paper Laminates o d) Paper Composites o 8. Resins o 9. Others (PI. specify) o

N - Insulators

1. Cast Resin Insulators o 2. Condenser Bushings o 3. Disc Insulators o 4. Hollow Insulators o 5. Insulators for Distribution o Transformers 6. Long Rod Insulators o 7. Polymer Insulators o 8. Composite Insulators o 9. Porcelain Bushings o 10. Post Insulators o 11. Solid Core Insulators o 12. Others (PI. specify) o

O - Lifts & Escalators

1. Elevators & Conveyors o 2. Escalators and Moving o Walkways 3. Hydraulic Lifts o4. Lifts and Hoists o

P - Lighting & Lighting Accessories

1. Emergency Lighting o 2. Lamps o a) Compact Fluorescent o Lamps (CLF)

b) Fluorescent Tubular o Lamps (HPMV)

c) GSL Lamps o d) Halogen Lamps o e) High Pressure Mercury o Vapour Lamps (HPMV)

f) High Pressure Sodium o

Vapour Lamps (HPSV)

g) Metal Halide Lamps (MH) o h) LED Lighting o i) Others (PI. specify) o

Page 11: Last Date for Confirmation - IEEMA | Your link to electricityieema.org/wp-content/uploads/2015/03/MemDirectoryLis… ·  · 2017-09-07Last Date for Confirmation 10th October 2011

3. Power Transformers a) Upto & including 10 MVA o (above 36 KV) b) Above 10 MVA upto 100 MVA o c) Above 100 MVA upto 300 MVA o d) Above 300 MVA o 4. Reactors o 5. Special Type o a) Booster Transformers o b) Constant Current Transformers o c) Constant Voltage Transformers o d) Control Transformers o e) Dry Type Transformers o f) Earthing Transformers o g) Amorphous Core Transformers o h) Other (PI. specify) 6. Other Related Products a) Bucholz Relays o b) On-load Tap Changers o c) Radiators o d) Winding Temperature Indicators o 7. Others (PI. specify) o

X - Transmission Line Towers & Accessories 1. Transmission Line Towers o 2. Towers for Communication o 3. Transmission Line o

Erection & Maintenance Tools 4. Structures and Parts of o Iron & Steel 5. Sundry Hardware a) Earth Wire Pins o b) End Fittings o c) Guard Rings o

15. Motor Starters a) Auto Transformer Starters o b) Direct-on-line (DOL) Starters o c) Slipring Motor Starters o d) Star-Delta Starters o e) Soft Starters o 16. Plugs & Sockets o 17. Power Contactors o 18. Power Control Centers o 19. Power Switches o 20. Protection Relays o (0/L Differential etc.) a) Digital o b) Electromechanical o c) Numerical o d) Static o 21. Push Buttons & Push o Button Stations 22. Relay Protection Panels o 23. Switch-Fuse Units o 24. Switchboards o 25. Terminal/Terminal o Blocks/Connectors 26. Others (PI. specify) o

W - Transformers 1. Auto Transformers o a) Upto and including 100 MVA o b) Above 100 MVA o 2. Distribution Transformers a) Upto 100 KVA o b) 100 KVA to 1600 KVA o c) Above 1600 KVA upto o 10 MVA/36KV

d) Horns o e) Insulator Brackets o f) Spacer Dampers o g) Spacers o h) Suspension Clamps o i) Others (PI. specify) o

Y - Winding Wires

1. Cotton Covered Wires o and Strips 2. Enamelled AL Winding Wires o 3. Enamelled Cu Winding Wires o 4. Continuously Transposed o

Winding Wires 5. Paper Covered Wires and o Strips 6. Plastic/ Rubber Insulated o Winding Wires 7. PVC Insulated Winding Wires o 8. Winding Wire for Sealed o Refrigeration Equipment 9. Winding Wires for o Submersible Pumps 10. Others (PI. specify) o

Z - Other Products

1. Electro-Magnets, o Permanent Magnets o 2. Welding Machines/ Weld Guns 3. Bus Duct System o 4. Lighting Poles o 5. Renewable Energy a) Solar o b) Wind o c) Bio-mass/Fossil Fuel o d) Others o6. Others (PI. specify) o

Please reply to:Ms. Priya Soman

IEEMA501, Kakad Chambers, 132, Dr. Annie Besant Road, Worli, Mumbai 400 018

Tel.: +91 22 2493 0532 Fax: +91 22 2493 2705 Email: [email protected]