Last Update: 1 September 2016
St. Louis District
Construction (Water Supply) Location: Project authority covers combined sewer overflows within the City of St. Louis and St. Louis County, Missouri. Description: The purpose of the project is to eliminate or control combined sewer overflows within the City of St. Louis and St. Louis County, Missouri. The sponsor requested five items of work: three sewer rehabilitations, one pump station alteration, and one local sewer construction. Issues: Administration policy precludes budgeting for this initiative and this project was funded previously via congressional adds. Additional future work beyond capability identified herein would require increase in current authorization limit. Importance: Metropolitan St. Louis Sewer District (MSD) serves a population of approximately 1.4 million people over an area of 524 square miles. MSD is responsible for operating and maintain 8,585 miles of sewer, which include 1,781 miles of combined sewers, located in residential neighborhoods, public parks and other publicly accessible locations. The replacement or rehabilitation of the combined sewers to meet stricter water quality requirements in highly urbanized areas has become a priority for MSD. MSD will implement $4.7 Billion in needed wastewater improvements throughout its service area over the next few decades. Risk: Operating, maintaining, and keeping these sewers functional are a necessity for economic development to occur and are a requirement to protect the health and safety of the public. Consequence: The USEPA Region VII issued a Notice of Violation to the Metropolitan Sewer District in May 2007 which requires posting of signs by all combined sewer overflow surface discharge locations to warn the public of the potential health hazards. The EPA estimates that these sites discharge 226 million gallons of untreated sewage into receiving waters on an annual basis.
Old Mill Creek Sewer Line Repairs Activities for FY 16: Funds were used to supervise completion of Task Orders (TO) 1 & 2 of Old Mill Creek (OMC) Phase 3 construction, issue TO 3 of OMC Phase 3 construction, and to finalize the cost-sharing agreement for Harlem-Baden project. Acquisition Strategy: Additional TO was awarded under existing IDIQ contract. Amount That Could Be Used in FY 17: Carryover funds will be used to supervise completion of TO 3 of OMC Phase 3 construction. An amount of $12,800,000 could be used to complete TO 4 of OMC Phase 3 ($2,000,000) and initiate and complete Harlem-Baden project, pending execution of cost-sharing agreement ($6,000,000 for Phase 2 in three increments; $3,000,000 for Phase 3 in two increments; $1,800,000 for first increment of Phase 8). Project Sponsor/Customer: Metropolitan St. Louis Sewer District. Congressional Interest: Senate: Blunt and McCaskill (MO); House: Clay (MO-1).
Phase
FY 16 Allocation
FY 17 Budget
FY 17 Total Capability
Construction $2,000,000 $0 $12,800,000
Project Fact Sheet St. Louis, MO (Combined Sewer Overflows)
Section 219(f)(32) of Water Resources Development Act (WRDA) of 1992 (Public Law (PL) 102-580) as amended by Section 502(b) of WRDA of 1999 (PL 106-53) and Section 5100 of WRDA 2007 (PL 110-114)
![Page 2: Last Update: 1 September 2016 Project Fact Sheet M… · Last Update: 1 September 2016 . St. Louis District . Construction (Water Supply) Location: Project authority covers combined](https://reader036.vdocuments.net/reader036/viewer/2022081613/5fbaabe5dad52c4abd53a34c/html5/thumbnails/2.jpg)
St Louis
Franklin
Lincoln
Washington
St Charles
Calhoun
Jefferson
Jersey
Monroe
St Louis(City)
Madison
St Clair
Randolph
Metro East/Chain ofRocks
£¤50
£¤66
£¤67
£¤61
£¤40
¡¢44
¡¢64
¡¢270
¡¢170
¡¢70
¡¢55
¡¢255MO
IL
210
230
170
180
190
200
160
150
140
Cuivre
Cahokia-Joachim
Peruque-Piasa
LowerMissouri
LowerKaskaskia
Meramec
Big
I
Legend Location in DistrictVicinity Map
MO ILIL
MO
0 6.5 133.25Miles
ST LOUIS MISSOURI (COMBINED SEWER OVERFLOWS)CONSTRUCTION
USACE: St. Louis District, Geospatial Engineering Branch
Harlem Baden ProjectCity of WellstonSt LouisVillage of HillsdaleOld Mills Creek Phase 1/2/3
Interstate HighwayUS HighwayState HighwayWatershed Lines
WORK PROPOSED WITH FUNDS REQUESTEDFOR THE BUDGET FISCAL YEAR.
WORK COMPLETED.
WORK UNDERWAY WITH FUNDS AVAILABLEFOR THE CURRENT FISCAL YEAR.
WORK REQUIRED TO COMPLETE THE PROJECTAFTER THE BUDGET FISCAL YEAR.PROJECT
AREA
COMBINED SEWEROVERFLOW
St Louis
Hillsdale
Minerva
Arlingto
n
Wellsmar
Blackst
one
Union
Wells
Dr Martin Luther King
Hodiam
ont
Abner
Wabada
Belt
Ashland
Clara
Bailey
Semple
Grove
Crescen
t
Highland
Kennerly
Ferris
Lotus
Ridge
Storey
Rowan
St Louis
Cote Brilliante
Darby
Irving
Burd
Idadale
Hamilto
n
Edelle
Cheste
r
Cockrill
Lorraine
Oakdale
Mcarthur
Evanston
St Edward
Romaine Laurel
Audrey
Chevrolet
Siemers
Selber
Isabella
Darver
Planned
IndustrialBlakem
ore
Hebert
Overle
a
Labadie
Greer
Lincoln
Palm
TheodosiaMaffittNorthland
Brown
Terry
Roosevelt
Edmun
d
Elmbank
Harlem BadenSewer Separation Project
40cShaw
Jeffe
rson
36a
Russell
287b-A
8th
204
206c
206b
207a
Spruce
37b
208
39c Walnut
287b
38b
38a
3rd
289290c
36b
39a
Broadw
ay
4th
Lafayette
14th
King
shigh
way
Mcree
290b
I-64Clark
Tuck
er
Christy
Vandeventer
Morga
nford
I-70
Bates
Truma
n7th
Chippewa
Manchester
Market
I-44
Arsenal
Gran
d
Gravois I-5
5
Rank
enOh
io
St Louis
Old Mill Creek RehabilitationPhase 1/2/3
HARLEM BADEN SEWER SEPARATION
OLD MILL CREEK REHABPHASE 1 & 2SOUTH ARSENAL
SEWER REHABVANDEVENTER TO GRAND
SEWER REHAB
OLD MILL CREEK REHABPHASE 3