Last Update: 1 September 2016 St. Louis District Construction (Water Supply) Location: Project authority covers combined sewer overflows within the City of St. Louis and St. Louis County, Missouri. Description: The purpose of the project is to eliminate or control combined sewer overflows within the City of St. Louis and St. Louis County, Missouri. The sponsor requested five items of work: three sewer rehabilitations, one pump station alteration, and one local sewer construction. Issues: Administration policy precludes budgeting for this initiative and this project was funded previously via congressional adds. Additional future work beyond capability identified herein would require increase in current authorization limit. Importance: Metropolitan St. Louis Sewer District (MSD) serves a population of approximately 1.4 million people over an area of 524 square miles. MSD is responsible for operating and maintain 8,585 miles of sewer, which include 1,781 miles of combined sewers, located in residential neighborhoods, public parks and other publicly accessible locations. The replacement or rehabilitation of the combined sewers to meet stricter water quality requirements in highly urbanized areas has become a priority for MSD. MSD will implement $4.7 Billion in needed wastewater improvements throughout its service area over the next few decades. Risk: Operating, maintaining, and keeping these sewers functional are a necessity for economic development to occur and are a requirement to protect the health and safety of the public. Consequence: The USEPA Region VII issued a Notice of Violation to the Metropolitan Sewer District in May 2007 which requires posting of signs by all combined sewer overflow surface discharge locations to warn the public of the potential health hazards. The EPA estimates that these sites discharge 226 million gallons of untreated sewage into receiving waters on an annual basis. Old Mill Creek Sewer Line Repairs Activities for FY 16: Funds were used to supervise completion of Task Orders (TO) 1 & 2 of Old Mill Creek (OMC) Phase 3 construction, issue TO 3 of OMC Phase 3 construction, and to finalize the cost-sharing agreement for Harlem-Baden project. Acquisition Strategy: Additional TO was awarded under existing IDIQ contract. Amount That Could Be Used in FY 17: Carryover funds will be used to supervise completion of TO 3 of OMC Phase 3 construction. An amount of $12,800,000 could be used to complete TO 4 of OMC Phase 3 ($2,000,000) and initiate and complete Harlem-Baden project, pending execution of cost-sharing agreement ($6,000,000 for Phase 2 in three increments; $3,000,000 for Phase 3 in two increments; $1,800,000 for first increment of Phase 8). Project Sponsor/Customer: Metropolitan St. Louis Sewer District. Congressional Interest: Senate: Blunt and McCaskill (MO); House: Clay (MO-1). Phase FY 16 Allocation FY 17 Budget FY 17 Total Capability Construction $2,000,000 $0 $12,800,000 Project Fact Sheet St. Louis, MO (Combined Sewer Overflows) Section 219(f)(32) of Water Resources Development Act (WRDA) of 1992 (Public Law (PL) 102-580) as amended by Section 502(b) of WRDA of 1999 (PL 106-53) and Section 5100 of WRDA 2007 (PL 110-114)

Upload: others

Post on 16-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Last Update: 1 September 2016 Project Fact Sheet M… · Last Update: 1 September 2016 . St. Louis District . Construction (Water Supply) Location: Project authority covers combined

Last Update: 1 September 2016

St. Louis District

Construction (Water Supply) Location: Project authority covers combined sewer overflows within the City of St. Louis and St. Louis County, Missouri. Description: The purpose of the project is to eliminate or control combined sewer overflows within the City of St. Louis and St. Louis County, Missouri. The sponsor requested five items of work: three sewer rehabilitations, one pump station alteration, and one local sewer construction. Issues: Administration policy precludes budgeting for this initiative and this project was funded previously via congressional adds. Additional future work beyond capability identified herein would require increase in current authorization limit. Importance: Metropolitan St. Louis Sewer District (MSD) serves a population of approximately 1.4 million people over an area of 524 square miles. MSD is responsible for operating and maintain 8,585 miles of sewer, which include 1,781 miles of combined sewers, located in residential neighborhoods, public parks and other publicly accessible locations. The replacement or rehabilitation of the combined sewers to meet stricter water quality requirements in highly urbanized areas has become a priority for MSD. MSD will implement $4.7 Billion in needed wastewater improvements throughout its service area over the next few decades. Risk: Operating, maintaining, and keeping these sewers functional are a necessity for economic development to occur and are a requirement to protect the health and safety of the public. Consequence: The USEPA Region VII issued a Notice of Violation to the Metropolitan Sewer District in May 2007 which requires posting of signs by all combined sewer overflow surface discharge locations to warn the public of the potential health hazards. The EPA estimates that these sites discharge 226 million gallons of untreated sewage into receiving waters on an annual basis.

Old Mill Creek Sewer Line Repairs Activities for FY 16: Funds were used to supervise completion of Task Orders (TO) 1 & 2 of Old Mill Creek (OMC) Phase 3 construction, issue TO 3 of OMC Phase 3 construction, and to finalize the cost-sharing agreement for Harlem-Baden project. Acquisition Strategy: Additional TO was awarded under existing IDIQ contract. Amount That Could Be Used in FY 17: Carryover funds will be used to supervise completion of TO 3 of OMC Phase 3 construction. An amount of $12,800,000 could be used to complete TO 4 of OMC Phase 3 ($2,000,000) and initiate and complete Harlem-Baden project, pending execution of cost-sharing agreement ($6,000,000 for Phase 2 in three increments; $3,000,000 for Phase 3 in two increments; $1,800,000 for first increment of Phase 8). Project Sponsor/Customer: Metropolitan St. Louis Sewer District. Congressional Interest: Senate: Blunt and McCaskill (MO); House: Clay (MO-1).

Phase

FY 16 Allocation

FY 17 Budget

FY 17 Total Capability

Construction $2,000,000 $0 $12,800,000

Project Fact Sheet St. Louis, MO (Combined Sewer Overflows)

Section 219(f)(32) of Water Resources Development Act (WRDA) of 1992 (Public Law (PL) 102-580) as amended by Section 502(b) of WRDA of 1999 (PL 106-53) and Section 5100 of WRDA 2007 (PL 110-114)

Page 2: Last Update: 1 September 2016 Project Fact Sheet M… · Last Update: 1 September 2016 . St. Louis District . Construction (Water Supply) Location: Project authority covers combined

St Louis

Franklin

Lincoln

Washington

St Charles

Calhoun

Jefferson

Jersey

Monroe

St Louis(City)

Madison

St Clair

Randolph

Metro East/Chain ofRocks

£¤50

£¤66

£¤67

£¤61

£¤40

¡¢44

¡¢64

¡¢270

¡¢170

¡¢70

¡¢55

¡¢255MO

IL

210

230

170

180

190

200

160

150

140

Cuivre

Cahokia-Joachim

Peruque-Piasa

LowerMissouri

LowerKaskaskia

Meramec

Big

I

Legend Location in DistrictVicinity Map

MO ILIL

MO

0 6.5 133.25Miles

ST LOUIS MISSOURI (COMBINED SEWER OVERFLOWS)CONSTRUCTION

USACE: St. Louis District, Geospatial Engineering Branch

Harlem Baden ProjectCity of WellstonSt LouisVillage of HillsdaleOld Mills Creek Phase 1/2/3

Interstate HighwayUS HighwayState HighwayWatershed Lines

WORK PROPOSED WITH FUNDS REQUESTEDFOR THE BUDGET FISCAL YEAR.

WORK COMPLETED.

WORK UNDERWAY WITH FUNDS AVAILABLEFOR THE CURRENT FISCAL YEAR.

WORK REQUIRED TO COMPLETE THE PROJECTAFTER THE BUDGET FISCAL YEAR.PROJECT

AREA

COMBINED SEWEROVERFLOW

St Louis

Hillsdale

Minerva

Arlingto

n

Wellsmar

Blackst

one

Union

Wells

Dr Martin Luther King

Hodiam

ont

Abner

Wabada

Belt

Ashland

Clara

Bailey

Semple

Grove

Crescen

t

Highland

Kennerly

Ferris

Lotus

Ridge

Storey

Rowan

St Louis

Cote Brilliante

Darby

Irving

Burd

Idadale

Hamilto

n

Edelle

Cheste

r

Cockrill

Lorraine

Oakdale

Mcarthur

Evanston

St Edward

Romaine Laurel

Audrey

Chevrolet

Siemers

Selber

Isabella

Darver

Planned

IndustrialBlakem

ore

Hebert

Overle

a

Labadie

Greer

Lincoln

Palm

TheodosiaMaffittNorthland

Brown

Terry

Roosevelt

Edmun

d

Elmbank

Harlem BadenSewer Separation Project

40cShaw

Jeffe

rson

36a

Russell

287b-A

8th

204

206c

206b

207a

Spruce

37b

208

39c Walnut

287b

38b

38a

3rd

289290c

36b

39a

Broadw

ay

4th

Lafayette

14th

King

shigh

way

Mcree

290b

I-64Clark

Tuck

er

Christy

Vandeventer

Morga

nford

I-70

Bates

Truma

n7th

Chippewa

Manchester

Market

I-44

Arsenal

Gran

d

Gravois I-5

5

Rank

enOh

io

St Louis

Old Mill Creek RehabilitationPhase 1/2/3

HARLEM BADEN SEWER SEPARATION

OLD MILL CREEK REHABPHASE 1 & 2SOUTH ARSENAL

SEWER REHABVANDEVENTER TO GRAND

SEWER REHAB

OLD MILL CREEK REHABPHASE 3