Page 1: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Laura Mester

Chief Administrative Officer

Michigan Department of Transportation

August 3, 2012

Page 2: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

20

04

20

04

20

04

20

05

20

05

20

05

20

06

20

06

20

06

20

07

20

07

20

07

20

08

20

08

20

08

20

09

20

09

20

09

20

10

20

10

20

10

20

11

20

11

20

11

0

10

20

30

40

50

60

70

Good Fair Poor

% o

f La

ne

Mile

s2004 - 2011 Pavement Condition

Page 3: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Trunkline Investment Scenarios

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Perc

en

t G

oo

d/F

air

Match All Federal Aid (w/NITC)

Match All Federal Aid (w/NITC)and additional $845M

$22 B

$14 B

$21 B

$4 B$8 B $10 B$2 B

$6 B

$8 B

$19 B

with MDOT’s share of $1.4 B

Page 4: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012
Page 5: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Moving Ahead for Progress in the 21st Century Act, or MAP-21

SAFETEA-LU expired September 30, 2009

10 extensions – covering 1,010 days

Signed into law July 6, 2012

Two year bill – FY 2013 & 2014

Extends current law through end of FY 2012

Page 6: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

SAFETEA-LUAnnual Avg.

% of Total

MAP-21 Annual Avg.

% of Total

Highways $39.5 b 78.8% $40.7 b 77.4%

Transit $9.4 b 18.8% $10.6 b 20.2%

Safety $1.2 b 2.4% $1.2 b 2.4%

Total $50.1 b $52.6 b

Page 7: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Minimum guaranteed for donor states watered down

No earmarks

Significant consolidation of highway & transit programs

Approximately 100 programs impacted by consolidation

With most project eligibilities preserved, agencies should have more flexibility

Page 8: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Performance measures integrated into planning processes

NHS performance and condition

Highway and transit safety

Air quality

Freight movements

Transit state of good repair

Page 9: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Heavy in reforms to accelerate project delivery

Broadens use of CE

Speeds up agency review process

Enhances focus on freight

Expanded options for innovative financing

Transit bus capital program formulized

Requires transit agencies to develop asset management plan

Page 10: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Continue to learn about MAP-21

Formed a barrier buster group to identify and address implementation issue

May need policy decisions from Commission

Participation with USDOT in implementing guidance and regulations

Page 11: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Reinventing Michigan to become a world

trading center means developing

infrastructure that will meet the modern day

demands of an international economy.

Page 12: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Canada is Michigan’s largest trade partner and shared over $70 billion in two-way trade in 2011.

Thirty-four other states rely on Canada as their largest trading partner; more than $597 billion passed between the two countries in 2011.

Based on the trade volume, Detroit is the busiest border crossing in North America but currently also serves as the biggest bottleneck in the entire Pan-American freeway system with no freeway-to-freeway connection.

Increasing trade volumes and continued congestion demonstrates the need for additional capacity at the border.

Page 13: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

NITC will provide direct freeway-to-freeway connection, which is essential to efficient trade. That is why hundreds of groups, businesses and organizations around the state have endorsed this project.

The freeway-to-freeway link will attract more businesses to Michigan and provide a vital economic boost to the region.

Page 14: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

NITC will be built at no expense to Michigan taxpayers as Canada has committed $550 million for the Michigan portion of the crossing (freeway connection and customs).

The bridge will be built, financed and eventually managed by private businesses through a public/private partnership, with Michigan and Canada still owning this valuable infrastructure.

Page 15: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

$550 Canadian investment can also be used as leverage to match up to $2.2 billion in federal road funds for projects statewide.

Receiving this federal match means additional job opportunities and a stronger infrastructure system for our state.

The NITC means jobs! This project will create 10,000 immediate jobs, add more than 30,000 associated jobs during construction, and retain an additional 25,000 long-term jobs.

NITC is a unique opportunity for Michigan that will support new trade, create new jobs and provide additional funds for our roads without costing Michigan taxpayers.

Page 16: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012
Page 17: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Michigan Dashboard

Infrastructure Dashboard

MDOT’s Scorecard

MDOT System Measures

Commission Measures

Asset Management Council

FHWA Stewardship AgreementAligning Measures is Critical to Efficiency

www.michigan.gov/midashboard

www.michigan.gov/mdot

Page 18: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

New material mixes Warm mix asphalt

Carbon fiber

Recycled concrete and asphalt

Page 19: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Best value contracting

methods

Pre-cast bridges

Bridge in a Backpack

Page 20: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

Saved $48.1 million in State Trunkline Funds

Saved $4 million in Comprehensive Transportation Funds

Cut aeronautics program costs $2.9 million by reducing services or using alternate funding

Total $55 Million

Page 21: Laura Mester Chief Administrative Officer Michigan ... › downloads › laura_mester_mi... · Trunkline Investment Scenarios 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 2010 2011 2012

“Providing the highest quality

integrated transportation services for

economic benefit and improved

quality of life.”