Page 1: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

LCLS Transition to ScienceDOE Status Review of the LUSI MIE Project

NEH status and XFD operations

Hal Tompkins, John ArthurLCLS Experimental Facilities Division

June 30, 2009

Page 2: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

2 H. [email protected]

2NEH status NEH ARR – June 30, 2009

Current NEH status

LCLS is operating through the Front End Enclosure, just upstream of NEH

New NEH building is fully functional

NEH hutches & shielding are in place

Hutch door installation being finalized

PPS systems are installed

Safety systems not yet certified

Page 3: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

3 H. [email protected]

3NEH status NEH ARR – June 30, 2009

800-2000 eV to Hutch 1

800-2000 eV to Hutch 2

2000-25000 eV to Hutch 3-6

insertable

insertable

Beam delivery to NEH

Shadow Wall

Wall 2

NEHFEE

stoppers

Temp stop

Page 4: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

4 H. [email protected]

4NEH status NEH ARR – June 30, 2009

LCLS operating structure

LCLS DirectorDale Knutson

Accelerator Systems DivJohn Seeman

operate accelerator for science

Business DivCindy Lowe

Experimental Facilities Div

Jochen Schneideroperate instruments for

science

Engineering Physics DivDavid Schultz

Strategic Projects DivJohn Galayda

LCLS Construction

LUSI

Page 5: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

5 H. [email protected]

5NEH status NEH ARR – June 30, 2009

Near Experimental Hall

Far Experimental Hall

Front End Enclosure

Undulator Hall

XFD responsibility

ASD responsibility

Division of responsibility

Page 6: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

6 H. [email protected]

6NEH status NEH ARR – June 30, 2009

Experimental Facilities Division (XFD)

XFD Director

OperationsArea MgrFloor Coord’sUser AdminOps tech staff

ScienceInst Scientists

R&DR&D tech staff

XFD Safety Officer

Page 7: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

7 H. [email protected]

7NEH status NEH ARR – June 30, 2009

Experimental Facilities Division Tasks

Manage safe operations in LCLS experimental areas

Manage LCLS user program

Maintain and upgrade X-ray instrumentation

Enable good user science; initiate in-house research

Page 8: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

8 H. [email protected]

8NEH status NEH ARR – June 30, 2009

XFD processes

Strong ties between XFD and ASDASD operating structure used as a model for XFD

Preparing key processes and documentationXFD directives: describe roles/responsibilities and prescribed actions

XFD training plan and training records plan

SAD, ASE to include NEH

Instrument Readiness Review (IRR) process for adding capability to LCLS experimental area incrementally

Page 9: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

9 H. [email protected]

9NEH status NEH ARR – June 30, 2009

XFD operations roles

XFD DirectorDevelop long-range goals, schedules

Authorize significant changes in operation

Delegate operations authority to Operations Head

XFD Safety OfficerOversee safety aspects of all XFD activities

Participate in scheduling

Participate in development of hazard mitigation plans

Operations HeadManage operations

User AdministrationDetailed User scheduling

User logistics and general training

Page 10: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

10 H. [email protected]

10NEH status NEH ARR – June 30, 2009

XFD operations roles, cont.

Area ManagerCoordinate activities in areaManage maintenance in areaRelease work in area

Floor Coordinator24/7 coverageRelease all work involving x-ray beams

Instrument ScientistRelease work on instrumentParticipate in schedulingManage maintenance of instrumentSupervise Users

Page 11: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

11 H. [email protected]

11NEH status NEH ARR – June 30, 2009

XFD staffing

XFD began 2009 with some staff in placeJ. Schneider, J. Hastings, J. Arthur (upper management)

H. Tompkins (NEH Area Manager)

P. Stefan, S. Moeller (diagnostics physicists)

N. van Bakel (detector physicist)

J. Bozek (AMO scientist)

D. Fritz, A. Robert, S. Boutet, Y. Feng (LUSI scientists)

Matrix support from Laser group, Controls group, DAQ group, Rad Physics

A total of about 20 people

Page 12: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

12 H. [email protected]

12NEH status NEH ARR – June 30, 2009

New staff supporting XFD early operationsZ. Van Hoover (XFD Safety Officer)

J. Bringetto (XFD Documentation Specialist)

H. Kamil (LCLS User Admin)

C. Bostedt (AMO scientist)

D. Rich, J-C Castagna, M. Holmes (operations engineers)

C. Brown, D. Peterswright, W. Polzin (Floor Coordinators)

Being hired, needed for AMO commissioning3 more Floor Coordinators (offers going out now)

Coming soon, not essential for AMO commissioningAdditional technicians

Administrator

Additional scientists

XFD staffing

Page 13: LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities

13 H. [email protected]

13NEH status NEH ARR – June 30, 2009

End of Presentation