T-160 (Marshall Ford to McNeil) Transmission Line Upgrade

through the Balcones Canyonlands Preserves

Jennifer LeeperLCRA Senior Environmental Coordinator

Oct. 8, 2015

Page 2: LCRA's T160 Project within the BCP

Project• LCRA Transmission

Services Corporation

• Upgraded existing 14.5-mile T-160 (Marshall Ford to McNeil) transmission line

• From 69-kV (kilovolt) to 138-kV

• Serving significant growth in Austin and northwest of Austin

Page 3: LCRA's T160 Project within the BCP
Page 4: LCRA's T160 Project within the BCP

Project Location and Balcones Canyonlands Preserves (BCPs)

Crosses multiple preserves

Page 5: LCRA's T160 Project within the BCP

Endangered Species

Golden-cheeked Warbler (GCWA) Black-capped Vireo (BCVI)Photo by John Ingram

Page 6: LCRA's T160 Project within the BCP

Endangered Species

Karst invertebrates Jollyville Plateau Salamander(JPS)

Page 7: LCRA's T160 Project within the BCP

Project Phases to Reduce ImpactsStarted early discussions – worked directly with BCP biologist, City of Austin hydrogeologist and U.S. Fish and Wildlife Service (FWS)

Phase I – Clearing/trimming and soil borings

Phase II – Construction

Page 8: LCRA's T160 Project within the BCP

BCCP MitigationMitigation through the Balcones Canyonlands Conservation Plan (BCCP) Infrastructure Application process to offset impacts to habitat

Why mitigate?

Photo by Ron Smith Photo by Jennifer Leeper

Page 9: LCRA's T160 Project within the BCP

FWS Guidance Met with U.S. Fish and Wildlife Service (FWS) for guidance concerning project activities and JPS habitat

Page 10: LCRA's T160 Project within the BCP

Outside Services for JPS and KarstHired Zara Environmental, LLC (Zara) to assist with karst investigations and best management practices to avoid impacts to the JPS

Photos by Zara Environmental, LLC

Page 11: LCRA's T160 Project within the BCP

Work by Zara to Reduce Impacts• Down-hole video analysis of soil borings• Subsurface drainage basin mapping of

protected caves (BCCP requirement) • Void mitigation plan

Photo by ZaraEnvironmental, LLC

Photo by Ron Smith

Page 12: LCRA's T160 Project within the BCP

Best Management Practices to Protect Endangered Species

Page 13: LCRA's T160 Project within the BCP

Galvanized versus Weathering Steel

Page 14: LCRA's T160 Project within the BCP

Untreated Versus Treated Water

Page 15: LCRA's T160 Project within the BCP

Breeding season for GCWA and BCVI is March 1-Sept. 1

Golden-cheeked WarblerBlack-capped Vireo

Page 16: LCRA's T160 Project within the BCP

Preventing the Introduction of Exotic Species

Tawny Crazy Ants

Red Imported Fire Ants

Page 18: LCRA's T160 Project within the BCP

Preventing the Spread of Oak Wilt

Page 19: LCRA's T160 Project within the BCP

Protection and Containment of Spills

Page 20: LCRA's T160 Project within the BCP

Preventing Wildfires

Page 21: LCRA's T160 Project within the BCP

Key IngredientsCommunication PlanningCreativity FlexibilityTeamworkRespectTraining and awarenessBalance

Page 22: LCRA's T160 Project within the BCP

BCVI Habitat in the TL ROW

Photo by William Reiner

Transmission Line Corridor on the City of AustinKent Butler Ecological Reserve

Page 23: LCRA's T160 Project within the BCP

Habitat Improvement in 2009…

2009 Nest

Habitat improvement areas

Page 24: LCRA's T160 Project within the BCP

… Led to BCVI Nest Success in 2013, 2014 and 2015!

2013 Nest

2014 Nest2015 Nests

Page 25: LCRA's T160 Project within the BCP

BCVI on Nest

Photo by William Reiner

Page 26: LCRA's T160 Project within the BCP

Success at Kent Butler

Three BCVI fledged the nest by May 22, 2015, offspring of the banded male that had returned from the previous year

Photo by William Reiner

Page 27: LCRA's T160 Project within the BCP

BCVI Nesting on Ribelin Preserve

Nest not successful, but ROW vegetation attracted BCVI

Photo by Erik Huebner