lead the way - autodeskimages.autodesk.com/apac_grtrchina_main/files/autodesk... · 2012. 7. 6. ·...

88
Lead the Way Autodesk Hong Kong BIM Awards 2012

Upload: others

Post on 01-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Lead the WayAutodesk Hong KongBIM Awards 2012

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    1

    Supporting Organisations:

    Sponsors:

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    2

    AcknowledgementSincere thanks to the eight awarded organisations, Atkins, Chinachem Group, Goldin Properties Holdings Limited, Hang Lung Properties Limited, Hong Kong Housing Authority, Hsin Chong Construction Group Limited, MTR Corporation Limited and Ronald Lu and Partners, in providing such valuable information and pictures of their projects. Besides, we are extremely grateful for the contributions of the AIAB committee and members, Mr. David Fung, Ms. Han Hsi Ho, Dr. Stefan Krakhofer, Mr. Kenneth Lau, Ir Sammy Ng and Ms. Christy Wong who are profiled in this booklet. DisclaimerAutodesk HK BIM Awards 2012 – Lead the Way, Copyright 2012.Autodesk all rights reserved. Printed and bound in Hong Kong.No part of this book may be used or reproduced in any form by any means whatsoever without prior written permission of the publisher.

    The photographs, images, drawings or sketches shown in this booklet represent the artist’s imaginative impression of the projects only. They are not drawn to scale and/or may have been edited and processed with computerized imaging techniques.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    3

    Preface 4

    Award Winners’ Profile

    •Atkins 7

    •ChinachemGroup 13

    •GoldinPropertiesHoldingsLimited 19

    •HangLungPropertiesLimited 25

    •HongKongHousingAuthority 31

    •HsinChongConstructionGroupLimited 37

    •MTRCorporationLimited 43

    •RonaldLuandPartners 49

    Advisors’ Comments 55

    Outstanding Students’ Projects 65

    About AIAB 69

    Sharing from AIAB Members 70

    Contents

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    4

    Adecadeago,Autodeskacquiredatechnologycompanythathadrecentlyreleasedthefirstversionsofpioneering3Dmodellingsoftware,namedRevit.

    Sincethen,AutodeskintroducedBuildingInformationModelling(BIM),whichsignalledaneweraofAECindustry.Thisyearwecelebratedthe10thanniversaryofRevitandBIM.

    MuchasAutodesk’sAutoCAD,introducedin1982,transformedwaysbuildingsaredesigned,BIMisdisruptivetechnology.It’snew,it’sevolving,andthosewhodeployitfindamultitudeofwaystouseBIMsoftwareincludingRevit.

    Ideally,aBIMmodelspansabuilding’sentirelife–fromearlydesigns,throughconstruction,tofacilitymanagement,andperhapsevenhelpingwithdemolition.Yetasyouwilllearnfromwinnersofthisyear’sAutodeskHKBIMAwards,BIMcanbeappliedinonlycertainpartsofabuilding’slifecycle,andstilldeliverimportantbenefits.

    Aswithanydisruptivetechnology,companies–andgovernmentbodies–varyintheirenthusiasmforembracingBIM.Butasthewinnersshow,evennewcomerstoBIMcanfindthatratherthandisruptingworkflows,itswiftlydeliversawiderangeofbenefits.AndatAutodesk,weareworkinghardtohelpeveryonewithadoptingandmakingeverbetteruseofBIM.Forjustasweliveina3Dworld,weareincreasinglylivinginaworldthatisdesignedin3D.

    TheAutodeskHKBIMAwardshavebecomeanimportantwayofdiscoveringandhighlightingoutstandingapplicationsofBIM.Theawardsarenowintheirsixthyear,andtherearearecordeightwinners.

    OnbehalfoftheAutodeskteam,Iamdelightedtocongratulateallawardees:Atkins,ChinachemGroup,GoldinPropertiesHoldingsLimited,HangLungPropertiesLimited,HongKongHousingAuthority,HsinChongConstructionGroupLimited,MTRCorporationLimitedandRonaldLuandPartners.ThankyouforpartneringwithusinexploringthepossibilitiesofBIM,andwelookforwardtocontinuingworkingwithyouintheexciting,BIMfuture.

    Patrick WilliamsSenior Vice President, APAC and Emerging MarketsAutodesk

    Preface

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    5

    IalwayslookforwardtotheAutodeskHKBIMAwards.Partlybecauseit’sagreatopportunitytolearnhowBIMisbeingappliedbycompaniesandinstitutionsbasedinHongKongandMacau–whetherfordesigningbuildingstructures,discoveringpotentialclashesinvolvingbuildingservices,improvingbuildingfacades,orpreparingforhighlyefficientfacilitiesmanagement.

    AsPatricknoted,anidealBIMmodelcoverstheentirelifecycleofabuilding.Yetinpractice,BIMmodelsmaybecreatedprimarilyforaspectssuchasclashdetection.Therearesignsthatthesituationwillchange,asBIMisincreasinglyadopted,andmorepeoplebecomefamiliarwithBIM,discoveringhowtheycantapitspowertoimprovebuildings,whilstincreasingefficiency,reducingcosts,andboostingprofitability.

    IalsolookforwardstotheawardsasitisalwaysapleasuretomeetsomanypeoplewhoareworkingwithBIM.Somehavediscovereditforthefirsttime,othersareexperts,sometimeshelpingtakeBIMindirectionsthateventhoseofusinAutodeskhadnotfullyanticipated.

    AcrossGreaterChina,usageofBIMisgrowingfast,andHongKongandMacauarehelpingleadtheway,thanksinnosmallparttothedevelopers,architecturalfirms,buildingcontractors,BIMconsultantsandgovernmentdepartmentsthathavewonAutodeskHKBIMAwardsovertheyears.Theawardees’storiesarealwaysinspiring.

    Pleasejoinmeincongratulatingthisyear’seightawardees:Atkins,ChinachemGroup,GoldinPropertiesHoldingsLimited,HangLungPropertiesLimited,HongKongHousingAuthority,HsinChongConstructionGroupLimited,MTRCorporationLimitedandRonaldLuandPartners.Ihopeyouthatasyoureadoftheirawardwinningprojects,youwillagreethattheyareindeedinspiring,helpingusalldiscovermoreaboutthepotentialandpowerofBIM.

    Jim HuangGeneral Manager, Greater China RegionAutodesk

    Preface

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    6

    ForallofusintheAutodeskHongKongandMacauteam,itisagreatsourceofpridethatthesetworegionsareplayingkeyrolesindrivingadoptionofBIMacrossGreaterChinaand,indeed,worldwide.ThisyearwearegladtohosttheBIMAwardsforthe6thconsecutiveyear.ThewinnersoftheAutodeskHKBIMAwardsareattheforefrontoftransformingwaysthearchitecture,engineeringandconstructionindustryworks–and,inturn–helpingenhanceurbanliving.

    ThebenefitsofBIMarepermeatingthroughoutHongKong.Notjustinstructuresasvariedascommercialanduniversitybuildings,housingblocks,anaircargoterminalandalogisticscentre,butalsoinwaysthatpeoplemovethroughrailwaystations.Importantly,BIMisalsodeliveringbenefitsinsustainability.

    WeareforginghighlyrewardingrelationshipswithBIMpractitionersinHongKong–whohelpshowusthepotentialofBIMsoftwaresolutionsaswellasadviseusonworthwhileenhancements.WearealsoseekingtodeveloptheskillsofeveryoneusingBIM,suchasthroughmasterclassesfeaturingexpertspeakers.

    AswellascelebratingtheachievementsoflocalBIMpractitioners,theAutodeskBIMHKAwardsservesasamasterclassinitself:forthroughoutthesixyearstheawardshavebeenheld,thewinningprojectshavealwaysfeaturednew,advancedusesofBIM.

    AsBIMusageincreasesinHongKongandMacau,thenumberandqualityofsubmissionsfortheBIMawardscontinuestorise–promptingthejudgingpaneltothisyearselectarecordnumberofeightawardees.OnbehalfoftheAutodeskHongKongandMacauteam,congratulationstoAtkins,ChinachemGroup,GoldinPropertiesHoldingsLimited,HangLungPropertiesLimited,HongKongHousingAuthority,HsinChongConstructionGroupLimited,MTRCorporationLimitedandRonaldLuandPartners.Welookforwardtoseeingyourprojectscompleted,asshiningexamplesoftheuseofBIM.

    Wendy LeeBranch Manager, Hong Kong and MacauSenior Manager, Business Development – Designed in, AEC ChinaAutodesk

    Preface

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    7

    Atkins

    Project:ChinaHuarongTower

    Location:Hengqinzhen,Xiangzhou,Zhuhai,Guangdong,PRC

    Type:Mixed-useDevelopment

    Scheduled Time of Completion:TotalCompletionisscheduledforDecember2014

    Rapid Design Development and Integrated Collaboration

    Atkins has been announced to design the China Huarong Tower. After winning the one-month competition, the project was set on a “fast-track”, reducing design development time to only two months for delivering the final scheme design. In order to fully embrace the rapid design development, the BIM workflow, centred on Revit has been adopted. Revit also enabled integrated collaboration with structural and environmental engineers by sharing one 3D design model.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    8

    An auspicious design

    TheHongKongarchitecturestudioofAtkinswasinvitedtocompeteforthedesignoftheChinaHuarongTower,amixed-usedevelopmentinZhuhai.Afterwinningthecompetition,thedesignteamwasinformedthatthefinaldesignwouldbeneededinjusttwomonths.DrStefanKrakhofer,associate

    ofAtkinsArchitectureandUrbanDesignhasdevelopedthewinningdesignapplying3DBIMmodelling,asitacceleratesthedesignprocessandincreasesqualitycontrol,leadingtoaviabledesign.

    Duringtheinitialtwoweeksoptioneeringstage,nineviabledesignswereproposedandtheclientchose3favourites.Inthefollowingtwoweeks,thefinalwinningdesignwaspresented–whichfeaturedanofficetowerandahoteltower,sharingaretailgalleria.Thearchitecturallanguageissculptural,resemblingthe“ShuangYu–thesymbolofthedoublefishleapingoutofthepond”;anauspiciousdesign,befittingthesitelocatedonZhuhai’swaterfront,facingtheCotaiStripofMacau.

    ThisdesignpresentsanothersuccessfulBIMprojectbyAtkins.ThechosenBIMplatformisAutodeskRevit,partlyasAtkinsispushingBIMglobally,andwillsoon

    introduceaglobalBIMstandardtoeasecommunicationbetweendisciplines,withinAtkins,andwithclientsandgovernments.Fortheteam–includingDrKrakhofer,whohadpreviouslyspecializedinparametricdesignandprogramminginother3Ddesignsoftware–theprojectwouldprovealearningexperience.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    9

    BIM helps assess sustainability

    “ThemultidisciplinaryenvironmentofAtkinsenablesanintegrateddesignapproach,”saysDrKrakhofer.“Earlyonarchitectsandengineersteamuptoachieveasustainabledesignsolution.Weanalysetheclient’sbrief,thelocalenvironmentalsituationandstartoptioneering.UsingBIM,wecannotonlymodeleverythingin3D,butalsoautomaticallyretrieveareaschedules,componentlists,and2Drepresentations.”

    ImportantlytoDrKrakhofer,RevitBIMenablescollaborationbetweendifferentsoftwaretoolsthatimprovesthefeedbackloopbetweendesignandanalysis;creatingasustainabledesignworkflow.DuringthedesigndevelopmentoftheChinaHuarongTower,the3Dmodelwasoftenexchanged(export/import)betweenRevit,andProjectVasariforrapidlyassessingsustainablefactors,suchasthesolarandwindperformance.

    Additionallytotheoptimizedanalysisfeedback,the3DRevitmodel,containingmaterialdefinitionscanbenaturallyrenderedin3dsmax,andexportedtobuildhigh-classphysicalmodels.ImportingtheRevitmodeltoNavisworks,andusingthewalkthroughfunctionalityimprovestremendouslywithcollaborativedesigndecisions.TheAtkinsteamisalsolookingintoparametricdesignusingRevit’s“Dynamo”plug-inanddesignautomation

    usingpythonscripting,allowingmoretimetobespentondesigning.

    Constraints Driven Design

    “Identifyingtheconstraints(Regulations,cost,climate,structure,MEP,BMU,visualperformance,…)ofaprojectallowsyoutodrivethedesignmoreeffectively,”saysDrKrakhofer.“Theuseof3DBIMhelpstoaddresseachaspectexplicitlyandimprovesqualitycontrol–itconstructsconfidence.”

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    10

    BIMallowsforrapidfine-tuningofthefinaldesign.Oneexampleduringdesigndevelopmentwas,toadjusttheoutlineoftheofficetowertoaccommodatealargerballroom,requestedbytheHoteloperator.IntheRevitmodel,thefloorareatableisupdatedautomaticallyandthenewmodelcouldberapidlyanalysedforitssolarperformance.TheAtkinsteamalsousedBIMforthecurtainwalldesigntoensureefficientpanelizationwithhighdegreeofrepetition.

    Toevaluatethespatialperformanceofthedesign,Navisworks’walk-throughfunctionalityhasbeenused.“InNavisworksspatialconstraintsexist,sothatonecannotwalkthroughobjects(walls)andcannavigateupanddownstairs,”saysDrKrakhofer.“Youcan

    walkyourclientthroughthedesigninthevirtualenvironment.”Duringoneofthevirtualinvestigations,thedesignteamencounteredanincongruouscolumnconfiguration.“Let’sresolvethis!”wastheimmediateresponse–togetherwiththestructuralengineersthecolumnshavebeenadjusted–thespatialqualityhasbeenenhanced.

    BIM shifting focus

    Reflectingontheprojecttodate,DrKrakhofersaysBIMrequiresmoreinvestmentofresourcesinthebeginning,buttheprocessisLEANoverall,withmoretimedesigning,lesstimeproducingplans.“Wemightbeabletodesignthreeprojectswiththenewapproach,inthetimeitwouldtakefortwowith

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    11

    traditionalmethods.Also,thedesignexperienceforcolleaguesworkingona3Dobjectinsteadof2DCADismoreexcitingandtangible-whichiswhyImovedinto3D.”

    TheconstructiveandexplicitnatureofBIMdemandsastrongdecisionmakingprocessalongwiththedesign.Thisresults–unlikewithfreeformmethods–inacloserrealitythatisperhaps95%identicaltothecompletedbuilding.AspartoftheBIMstrategy,Atkinshasintroducedcross-disciplinaryBIMmanagersthatareresponsibleformaintainingandqualityassuranceofthe3DBIMmodelsthroughouttheprojectlifetimes.

    ReflectingontheincreasingcapabilityandalsoacceptanceofBIM,DrKrakhofersays,“ObservingthebuildingindustrywearefindingthatmanyprofessionalsareeagertoadoptBIM-‘Let’sdoitinBIM’.”AtkinshasbeenusingBIMsuccessfullyonmorethan50projects

    worldwidewithanestimatedconstructionvalueexceeding$1billion.Inthelongrun,Atkinsisexpanding3DBIMto4Dandbeyond.“It’samoreintegratedapproach,”notesDrKrakhofer.

    * All images in this article are provided by Atkins

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    12

    ABouT ATkInS

    Atkins is one of the world’s leading design consultancies. We have the

    breadth and depth of expertise to respond to the most technically

    challenging and time-critical projects and to facilitate the urgent

    transition to a low carbon economy. Our vision is to be the world’s best

    design consultant.

    Whether it’s the architectural concept for a new super-tall tower, the

    upgrade of a rail network, master planning a new city or the improvement

    of a management process, we plan, design and enable solutions.

    With 75 years of history, 17,700 employees and over 200 offices

    worldwide, Atkins is the world’s 13th largest global design firm (ENR

    2011), the largest global architecture firm, the largest multidisciplinary

    consultancy in Europe and UK’s largest engineering consultancy for

    the last 14 years. Atkins is listed on the London Stock Exchange and is a

    constituent of the FTSE 250 Index.

    In 1994 Atkins established its first Asian office in Hong Kong followed

    by Singapore in 1996. Today we also have offices in Hong Kong, Beijing,

    Shanghai, Chengdu, Chongqing and Ho Chi Minh and Sydney, all part of

    an integrated network that delivers innovative multidisciplinary projects

    and employs approximately 1,000 staff across the region from China to

    South East Asia and Australia.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    13

    Chinachem Group

    Project:AsianHouse

    Location:1HennessyRoad,Wanchai,HongKong

    Type:Office

    Scheduled Time of Completion:November2016

    BIM a Star for Big Screens

    Chinachem Group is deploying BIM for a landmark project in Wanchai. The Revit model is proving invaluable, particularly for assessing the final appearance of four large, concave LED screens. The comprehensive BIM model will be used throughout design and construction phases, and facility management.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    14

    Landmark project for Chinachem Group

    ChinachemGroupisdevelopingAsianHouse,inaredevelopmentprojectinvolvingconstructionofa31-storeycommercialbuildingattheentranceofWanchaidistrictfromAdmiralty.Withitsprominentlocation,anddesignfeaturingapodiumanda“neck”withexpensiveLEDscreens,itissettobecomeanotherlandmarkofthegroup.

    “WesawthebenefitsofusingBIMasadesigntoolbythedesignconsultantinourBisneyRoadProjectwhichisoneoftheawardwinningprojectsinthelastyearBIMaward.Toreleasethefullpowerandgainthemostbenefits,wedecidetoinitiateandimplementBIMbyourselvestoextenditsapplicationinallaspectsofourprojects.”

    “WeareusingBIMfortheprojecttoensurequality,andcontrolcosts,”saysMr.AnthonyTam,QuantitySurveyor,ChinachemGroup.ThisisthefirsttimeChinachemhasdeployedBIMinfull-scale,whichwillallowmanydifferentstudies,witharangeofusesincludingplanninglayoutsandconstructiontiming,andassessingspacesandheadroom.

    Theproject’sBIMconsultantisWSPHongKong,andIrFrancisLeung,WSPHongKong’sDirectorandHeadofBIM,explainsthatprojectdesignteamsmayprovidehandsketches,CADdrawingsor3DmodelstodeveloptheBIMmodel.ThecentralisedBIMmodelthenservesasaplatformfordesignteamstostudy,boostingtheefficiencyofthedesignprocessandleadingtoanenhanceddesign.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    15

    “WithBIM,it’seasytoseetheendproduct,”saysIrLeung.“Theremaybeplacesthatarehardtovisualisefrom2Ddrawings,but3Dshowswhichpartofadesigndoesn’twork.Changescanbemadebasedonmodels,andfinaldecisionscanbemademorequickly.”

    BIM proves a boon for LED screens

    AkeyfeatureofAsianHousewherethedesignwasespeciallychallengingisthe“neck”,whichhasfourconcavesurfaces,wheredesignersaimedtolocatethreeorfourlargeLEDscreens.Thevisualeffectandappearanceofthedisplayscouldnotbesimplypresentedon2Ddrawings.Plus,asthesurfaceswerecurved,calculatingeachLEDdisplayareawouldnotbestraightforward,particularlywithaneedtooptimisetheshapeandheightofeachdisplay

    inordertoattainthebestandmostcost-effectivearrangement.

    IrLeungoutlinesseveralofthequestionsthattheteamhopedtoanswerusingtheBIMmodel:“Shouldtherebescreensonallfoursides–orwithonesidefacinganadjacentbuilding,shallwetakeawayascreen?WillthepodiumblockviewsoftheLEDscreens?Howwillitlookwithfourdifferentvideosonfoursides–orwithonlyimages?”

    The“neck”wasmodelledinRevit,producingaBIMmodelthatgeneratedareasoftheLEDdisplays,whichwereautomaticallyupdatedasthedesignerschangedthescreenshapeandheight.Screenresolutionisanotherkeyconsideration,particularlyashighdefinitionscreensarefarmoreexpensivethanthoseoflowerresolution.IrLeunglearnedofLED

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    16

    screencharacteristics,anddevisedameansofindicatingoncomputerscreenshowdifferentresolutionswouldappearinreality.

    DatafromtheBIMmodelwasthenusedtocreate3Danimations,whichshowedtheviewsforpedestriansonHennessyRoadandLockhartRoad.“WiththeBIMmodel,wecouldseeviewsfromJohnstonRoadthatshowedthescreenonthefourthsidewasvisible,ratherthanblockedbytheadjacentbuilding,”saysIrLeung.“Previously,therewasnowayofstudyingthis.”

    AswellashelpingoptimisetheLEDscreen

    designandresolution–whilstensuringtheyarewithinbudget-theBIMmodelcanaidinpositioningadvertisementsformaximumeffectiveness.Infuture,itshouldevenbepossibletoinsertvideosintotheanimation,sopotentialadvertiserscanseehowtheywillappear.

    Comprehensive deployment of BIM

    AnotherexampleoftheBIMmodelhelpingthedesignisassessinganexistingfootbridge.“Wecanjudgefromthemodelwhetherweshouldmodifythefootbridge,orjustaddanewexit,”

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    17

    saysIrLeung.“Also,theexistingbuildinghassupportforacableforthetram–themodelcananswerwhatwillhappenwiththis.”

    WithChinachemGroupsupportingcomprehensiveuseofBIMfromprojectinceptiononwards,themodelisinnovativeasElectrical&Mechanicaldesignscanbeincludedfromanearlystage–allowing3Dmodellingofthecombinedserviceslayout,showingcriticalitemsandminimisingclashes.

    Chinachem making further use of BIM

    ThoughtheAsianHouseprojectisinitsearlystages,theresultsofBIMmodellinghavealreadyencouragedChinachemtoadoptBIMforforthcomingprojects,allinvolvingluxuryhousing.

    Foroneproject,tobuildfiveblocksofresidences;BIMhashelpedconductafeasibilitystudy,suchasbyassessingandconductingasolarandmicro-climatestudytodiscoverwhichbuildingorientationswillmaximiseresidents’comfort.Theothertwoprojectsarebothsingleblockresidences,helpingChinachemassesstheeffectivenessofBIMindiversesituations.

    “WithBIM,wecanmakebetterpresentationinprojectmeetings,helpingshowcolleaguesandseniormanagementthatBIMcandomanythings,”saysMr.Tam.“Inthelong-term,wewillintegratetheuseofBIMforthewholebuildinglifecycleincludingfacilitymanagement.”

    *All images in this article are provided by Chinachem Group

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    18

    ABouT CHInACHEM

    The Chinachem Group (“Chinachem” or the “Group”) is one of Hong

    Kong’s best-known and most prolific property developers, with a

    successful corporate history of more than 40 years. Still the largest

    privately held group of its kind.

    The early years of the company were dedicated to exploration of, and

    investment in, agricultural projects and chemicals, but in the 1960s, the

    Group was one of the first to see the future of property development in

    Hong Kong and shifted its focus to the development of the city. It has

    subsequently contributed tremendously to the city, working to meet the

    needs of its citizens.

    By the mid-1970s, Chinachem had grown from a burgeoning company

    into one of Hong Kong’s largest property developers. The group has

    consistently maintained its position as a forward-thinking pioneer in the

    industry, active in the development of new towns and districts in Hong

    Kong. Tsuen Wan, Kwai Chung and Shatin were all developed in large

    part due to the dedication and foresight of the Group. Through their

    consistent efforts to improve Hong Kong, the Group continues to create

    private residences for elegant living for a wide range of Hong Kong’s

    residents and families.

    Today the Group boasts an impressive and diverse range of high-quality

    properties that span Hong Kong Island, Kowloon and the New Territories,

    with business interests including hotel ownership and operation,

    residential and commercial properties, as well as retail and industrial

    interests in a number of Hong Kong’s best-known and most iconic

    buildings.

    Chinachem has added to its portfolio of business interests on a global

    scale, investing in ventures related to its core businesses and associated

    industries, together with biochemistry, electronics, education and

    finance.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    19

    Goldin Properties Holdings Limited

    Project:TianjinGoldinMetropolitan–CentralBusinessDistrict(CBD)Phase1

    Location:TianjinCBD,PRC

    Type:Office/Hotel/ ServiceApartment/Entertainment

    Scheduled Time of Completion:End2015

    Mastering a Complex Project

    As Goldin Properties began a complex project, featuring a 117-storey building topped by a diamond structure, they deployed BIM to help make the design process smoother. After proving a boon in early design work, the BIM model looks destined for use throughout the lifetime of the buildings.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    20

    Major complex features landmark building

    GoldinPropertiesisdevelopingthe“TianjinGoldinMetropolitan”,acomplexcombiningaCentralBusinessDistrictandcommunitydevelopment,togetherwithaninternationalpologround.Atitsheartisabuildingdubbed117–whichwithaplanned117floorswillhaveaheightof597metres,makingitalandmarkforTianjin.“ThiswillbethetallestbuildinginnorthChina,andwouldtodayrankastheworld’sninthhighestbuilding,”saysIrRaymondChan,SeniorProjectManagerofGoldinProperties.

    Asix-starhotelwilloccupyfloors94-116ofthebuilding;floors7to93willbeforoffices.“Below,therewillbeapodiumanda30-metrehighlobby,alongwithafour-levelbasement,”saysIrChan.“117willhaveadiamondshapedstructureontop,withaclubinside–anobservationfloorwillprovidemagnificentviewsofthesurroundings.”TianjinGoldinMetropolitanwillalsofeatureatheatre,servicedapartments,andtwo50-storeytowers.

    BIM for understanding the design

    ThisisthefirsttimeGoldinGrouphasdeployedBIM,andIrChanandcolleagueslearnedofwaysitcouldhelpthemthrough

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    21

    theirBIMconsultantWSP.“WewereshownmanyadvantagesofBIM,andwe’reusingBIMforTianjinGoldinMetropolitanasit’saverycomplicatedprojectwithmanyelements,”saysIrChan.“BIMcanhelpeveryoneinprojectteamstomakesenseofthedesign,andensureeverythingisinposition.Plus,BIMcanboostefficiencyandimprovecontrolofprojectmanagement.”

    WithoutBIM,theprojectteamwouldhavetorelyontraditional2Ddrawings,andnoonecouldreallymasterandmanageallinformation.Theprojectwouldproceedwithmanyuncertainties.ForTianjinGoldenMetropolitan,useofBIMfocusesonthe

    CentralBusinessDistrict,asthemultipleelementsmakeitespeciallycomplex.Eventhoughtheprojectisstillinarelativelyearlystage,BIMisalreadyprovinghelpful.

    “Wehaveheldmanycoordinationmeetingsbetweenconsultants,andtheBIMmodelhashelpedrevealconflictsamongdifferentelements,”saysIrChan.“Theengineeringandmechanicalconsultantsfinditespeciallyusefulforunderstandingandfine-tuningthedesign.”

    Creative use of BIM

    OnelocationtheBIMmodelhasprovenitsworthisthebasementcarpark.Thegoalwasforheadroomofatleast2.8metres.Thestructuralconsultantoriginallybelievedtheyhadmetthisrequirement,yettheylearnedotherwiseaftertheirdatawasusedtocreatetheBIMmodel–whichrevealedmanyclashes,withheadroomoftenonly2.5metres.

    “TheheadroomstudyemployedBIMininnovativeway,usinganimaginaryceilingattheheightoftheheadroom,”saysIrChan.TheBIMteamcreatedaReflectedCeilingPlan,withafalseceilingindicatedbyathinbandofcolour.AnyMechanical&Electricaland

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    22

    Structuralelementsappearingonthecolouredceilingareashowedwheretheheadroomwasinsufficient–makingiteasytoseewheretherewerepotentialclashes.

    TheteammemberscouldthenreviewtheBIMmodel,concentratingonassessingclashesincriticallocations.Theythenagreedonthemostrealisticachievableheadroom,andrevisedthedesign,suchasbyinstructingtheconsultanttoraisebeamsorlowerairductsinsomeplaces.

    3D model for the life of the buildings

    “Usuallywhenweareworkingoncoordination,anddesignmodelling,it’shardtovisualisethewholepicture,”saysElvisSo,ProjectManager,GoldinProperties.“YetBIMgeneratesthisoverallpictureeasilyonacomputer–makingthedesignprocesssmoother.”

    TheBIMmodelisprovingitsworthaboveground,too,suchasincoordinatingelementsoftheextensivepodiumthatwillinterconnect117withmuchoftheCentralBusinessDistrict.Landscapedesignerswhootherwisedon’tknowstructureandElectrical&MechanicalcanseetheBIMmodel,andsounderstandhowthesitewillappear,enablingthemtocreateoptimallandscapefeatures.

    Thewholeteam,comprisingmembersfromdisciplinesrangingfromstructuraltolandscaping,isworkingcloselytogether–achievingthegoalofmoderncoordinateddesign,whichwaspreviouslyimpossiblewith“sequential”designdevelopment.“BIMhelpsusfindlocationswhereconstructionwon’tmeetthedesignintent–givingusachancetomakemodificationsbeforeconstruction,”saysIrSo.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    23

    ThoughBIMwasinitiallyintroducedtodetectpotentialconflicts,theGoldinprojectteamnowconsidersitwillprovepowerfulfromthedesignstagetocompletion,andthewholeBIMsystemcanbepassedtofutureoperations.

    “Ifthecontractorwants,theycanapplyBIMtoconstruction–sotheycanvisualisetheconstructionprocess,”notesEdmondTing,ExecutiveDirector,GoldinProperties.“WewillalsousetheBIMmodelforsafetyandpropertymanagement.Ifatenantmovesout,thenewownercaninputtheiramendedlayouttotheBIMmodel,whichcanbemaintainedforthelifeofthebuildings.”

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    24

    ABouT GoLDIn ProPErTIES HoLDInGS LIMITED

    Goldin Properties Holdings Limited “Goldin” (formerly known as

    Matsunichi Communication Holdings Limited) is a premier property

    developer specialising in Mainland property market. It is listed on the

    main board of the Stock Exchange of Hong Kong Limited (HKEX) (Stock

    code: 00283). The Group’s headquarter is in Hong Kong.

    Goldin commenced property development business since 2007. To align

    with the robust growth of the Chinese economy, the Group has been

    focusing on the high-end properties market. As a premier developer

    of quality properties, Goldin is currently developing a world class

    metropolis in Tianjin.

    Apart from actively pursuing the development of this mega project in

    Tianjin, Goldin is always looking for suitable sites in other mainland

    cities with good development potentials to increase for its land bank.

    The economic growth potential of various cities is the Group’s prime

    consideration in formulating its plan to develop property projects in

    China.

    In return, this offers tremendous driving force for Goldin to build the

    most suitable accommodation to meet with the clients’ expectation.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    25

    Hang Lung Properties Limited

    Project:BluePoolRoadResidentialDevelopment

    Location:I.L.5747,Nos.11-39BluePoolRoad,HongKong

    Type:LowRiseResidentialDevelopment

    Tentative Time of Completion: 2013

    Holistic Design for Luxury Townhouses

    BIM is helping a project team to design a luxury housing development for Hang Lung Properties Limited, including arranging building services in a confined space under a road and within the low-rise buildings.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    26

    Low-rise buildings yet significant challenges

    BluePoolRoadResidentialDevelopmentisaluxurytownhouseprojectofHangLungPropertiesLimited.SetonanarrowsiteonaslopeatHappyValley,itwillfeaturenineblocksofthree-storeyhouses.

    “Asit’salow-riseproject,somemaythinkusingBIMisnotworthwhile,”saysJeffCheung,ContractsManagerofthemaincontractor,TysanBuildingConstructionCo.Ltd.“Yettherearechallenges,includinglandscapingthehillsideslope,designingaretainingwall,andarrangingbuildingservicesinthedenselypackedsite.”

    ThisisthefirsttimeHangLungPropertiesLimitedhasusedBIM.WithBIM,itwouldbepossibletoseeconflictsbeforeactualconstructionandtherebymitigatetheabortiveworks.

    Streamlined design reduces costs

    TheBIMmodelwascreatedbyRayLau,BIMEngineer,ForidaLimited,bycombiningdesignsfromthearchitect,engineersandlandscapearchitect.“AllcomponentsintheBIMmodelhavegenuinedimensions,”hesays.“Weincludedthevariousbuildingservicesinthesmallarea,andmodelledtheretainingwall.”

    HangLungPropertiesLimitedaimedtominimisereworkingoftheexistingslope,andRayusedsurveydatatocreateaslopeprofileintheBIMmodeltoachievethisend.Thedesignteam,maincontractorandconsultantsheldmanymeetingsinwhichtheydiscussedthemodel,andworkedonthedesignfortheslopeworkandretainingwall.

    Theretainingwallcomprises24roughlyL-shapedstructures,ratherlikealinearjigsawpuzzle.“WithoutBIMwecouldn’thaveanaccuratedesignoftheL-shapedwall,”saysTommyLee,SeniorProjectManager,TysanBuildingConstructionCo.Ltd.Therewasalsoaplanterwall,asalandscapefeature.

    AftertheBIMmodelwasfirstbuilt,Rayusedittohelptoprojectthecostsofthematerialsfortheplanterwalls.Theresultingfigure

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    27

    wassignificantlyoverbudget.TheprojectteamworkedtostreamlinethedesignintheBIMmodel,andwithinamonthachieveda40%reductionintheconcretevolumeandformworkneeded.

    “Intheearlystagesoftheproject,theBIMmodelalsoshowedtheteamthewholedrainagesystem,whichledtomajorchanges,”saysNelsonWong,BuildingServicesManager,TysanBuildingConstructionCo.Ltd.Many

    clashesthathadgoneunnoticedon2Ddrawingswererevealedinthe3Dmodel,suchasdrainsrunningalongtheemergencyvehicleaccess(EVA).

    Arranging services below road and over ceilings

    TheBIMmodelwasalsousedtocheckaccesstobuildingserviceslaidundertheemergencyvehicleaccess(EVA)runningbehindthe

    With BIM, our team works efficiently with landscape architect during the design process. BIM visualizes the design and extracts 3D geometry data to assist the decision making concerning aesthetic, function and cost.

    Through the collaboration, BIM successfully helps to maintain the design principle while optimizing the structural design to reduce significantly the concrete volume and in turn the construction cost.

    BIM helps not only to visualize but also facilitate the design, saving time and cost ultimately.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    28

    houses.Themanholecovershadtobepreciselypositioned,tofitintothepatternofpavingstones.

    Around13typesofutilitieshadtobelaidunertheEVA,withinastriparoundsixmetreswideandalittlelessthan2metredeep.Themainutilitiesherearedrainagefortheslope,theemergencyvehicleaccess,planters,featuredpoolsandthehouses;othersincludeelectricalpowersupply,security,surveillance,telephonelines,broadbandfibres,gas,aswellaswatersuppliesforpotable,flushing,irrigationandfeaturedpoolsontheslope.Addingtothecomplexity,someofthepipesneededtobeofspecificgradients.

    “BIMhelpedusalot,”saysTommyLee,SeniorProjectManager,TysanBuildingConstructionCo.Ltd.“ItgaveusaveryearlyimpressionofhowthingswouldlookundertheEVA,sowe

    couldunderstandthewholesystemunderthisarea.”WorkingwiththeBIMmodel,thebuildingservicesteamminimisedtheclashesbetweenallservicesandthesub-structure.

    Thoughthetownhousesareonlythree-storeybuildings,Nelsonexplainsthattheypresentedchallengesfordesigners,“Theyareluxuryhousesinthemiddleofthecity,withalotofservices.Forinstance,theyhavemotorisedblindsbuiltintothecurtainwallsandwithinthedouble-glazing.”

    Themostchallengingaspectofdesigningthehouseswasachievingmaximumheadroomtoensurespaciousroomsforusers.Thistaskwascomplicatedbytheautomationsystemrequiringdoubleofthewiringoftraditionalhouses.Toaccountforthisandmaximiselivingspace,serviceswereconcentratedaboveareassuchascorridors.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    29

    UsingtheBIMmodel,themainprojectteamandthesub-contractorsarrangedthebuildingservicesinmuchthesamewayasundertheEVA:creatingandrefiningadesignwiththeservicesfittingintoasmallspace,withaccessformaintenance,butwithoutdetectableclashes.

    Impressive benefits of BIM

    TheprojectteamisimpressedbythewaysinwhichtheBIMmodelhasperformed,anddeliveredimpressiveresults.“BIMisaverygoodplatform,”saysTommyLee.“Youcanhaveaholisticviewofadesign,withoutwhicheveryonewouldhave2Ddrawingsoftheirownsystems,whichyouwouldhavetocombine.WorkingwithaBIMmodel,theE&Mteamcancoordinatebetweenthemselves,anddevisethebestoptionsforaproject.”

    RayLaudemonstrateda“walkthrough”animationhecreatedfromtheBIMmodel,

    showinghowthecompletedprojectwilllook.Itresemblesaguidedtour,withanappearencerecallingarealisticcomputergame:youenterfromBluePoolRoad,andpasstheretainingwallwithawaterfeatureandgreenery,beforecomingtoastopbesideoneofthehouses.ThisisthefirsttimeTysanhasbeeninvolvedincreatingsuchavideo.

    * All images in this article are provided by Hang Lung Properties Limited

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    30

    ABouT HAnG LunG ProPErTIES LIMITED

    Hang Lung Properties Limited, a constituent stock of the Hang Seng

    Index and Hang Seng Corporate Sustainability Indices in Hong Kong,

    is a leading real estate developer in Hong Kong and mainland China.

    Boasting a diversified portfolio of investment properties in Hong Kong,

    the Company has progressively branched out into the Mainland since the

    1990s, building, owning and managing world-class commercial complexes

    in key cities that have earned international acclaim for their exceptional

    quality of architectural design, services and sustainable features.

    Riding on the immense success of its two landmark properties in

    Shanghai, Plaza 66 and Grand Gateway 66, the Company’s footprint

    has expanded to Shenyang, Jinan, Wuxi, Tianjin, Dalian, and now

    Kunming following the successful acquisition of a prime site in that

    city in September 2011. Subsequent to the grand openings of Palace 66

    in Shenyang in 2010 and Parc 66 in Jinan the following year, the next

    world-class investment property to come on stream will be Forum 66 in

    Shenyang.

    As Hang Lung’s business continues to grow with soaring perspectives,

    the Company is set to develop into the most admired mega national

    enterprise in the market.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    31

    Hong kong Housing Authority

    Project:ConstructionofPublicRentalHousingatShaTinArea52Phase1(knownasShuiChuenOPh1)

    Location:ShaTin,HongKong

    Type:PublicHousing

    Scheduled Time of Completion: February2014

    Pioneering BIM for Quantity Surveying

    The Housing Authority is implementing probably the Greater China Region’s first project for obtaining detailed quantities data from a BIM model. The “5D” model – with three physical dimensions plus time and cost data – generates data far more quickly than traditional QS methods. The standardised approach and guidelines developed in the project may extend the use of BIM in the construction industry.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    32

    Pioneering research and design project

    In2006theHongKongHousingAuthorityfirstadoptedBIM,andhasmaderemarkableachievementsinsustainableconstructionandstrengtheningsitesafetythroughapplyingBIMtechnologyindesignandsiteplanning.Now,theHousingAuthorityaimsforallnewprojectsfrom2014/15onwardstouseBIM.

    ThesuccessandfutureplanspromptedtheHousingAuthority’sQuantitySurveyingSectiontoinvestigatehowtotapBIM’spotentialforhelpingtogeneratedatasuchasquantitiesandcostsofconstructionprojects.Thiscouldleadtoseveraladvantagesovercurrentpractices.Traditionally,designintentandcostdataareoftenseparatedandisolatedindifferentdigitalenvironments–makingitextremelydifficultandtimeconsumingtoextractdataforplanningandcontrollingconstructionprojectfinanceandriskissues.

    TheHousingAuthoritydecidedtoundertakearesearchinahousingprojectunderconstruction,inpartnershipwiththecontractorChinaStateConstructionEngineering(HongKong)Ltd.andtheBIMconsultantisBIMLimited.AsthereisnopreviousexampleofBIMbeingappliedtogeneratedetailedquantitiesbasedonisBIM’s

    approachintheGreaterChinaRegion,thisprojectcouldbesaidthefirstintheRegion.

    BIM in parallel with traditional QS methods

    TheprojectcoversanewpublicrentalhousingdevelopmentinShuiChuenOPhase1inShatinofHongKong.ThisHK$1.3billiondevelopmentinvolvesconstructionoffiveblockswith3,039domesticflats.TheresearchspansfourworktradeswhicharePiling,Excavation,ConcreteWorksandUndergroundDrainage,whichtogetheraccountforaroundHK$301millionoftheprojectcost.

    Quantitysurveyorsarestillapplying

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    33

    conventionalpractices,takingmanualmeasurementfromdrawingsandtransferringdimensionstosheetsorspreadsheetstocarryoutcostestimatesorinterimpaymentassessments.Theresearchrunsinparallelwiththiswork,seekinganewwaytouseBIMinformationtoboostefficiencyandproductivitybyautomatedquantification,increaseaccuracybyreducingdatavariability,andfacilitatesharingofdataamongstakeholders.

    Standardised approach and guidelines

    “Atfirst,therewasnoBIMmodel–wecreatedonefrom2Ddrawings,”saysElvisLi,CEOof

    isBIMLimited.Themodelcurrentlyhasover85,000objects.

    Usingthismodel,teammembersdevelopedasystematicapproachforquantitytakeoffprocess,costsmanagementandcashflowsimulationlinkingtheBIMdatabasewithaCostdatabase.ThisapproachwasdubbedQuantitySurveyingBuildingInformationModelling(QSBIM).QSBIMaimstoprovidequantitysurveyorsaneffectivewaytotransfer,extractandverifythecostrelatedinformationfromBIMmodellingelementstoaBQdatabase.

    “OneofthechallengesinextractingquantitiesistherequirementtofollowthemeasurementrulesintheHongKongStandardMethodofMeasurementofBuildingWorks(HKSMM),”saysSunnyChoi,SeniorQuantitySurveyoroftheHousingAuthority.“AnotherchallengeisdifferentmethodsofbuildingupBIMmodelswillgiveoutdifferentquantities.”

    isBIMdraftedastandardapproachofmodellingforthefourworktrades,coupledwithstandardisedguidelinesbasedontheHKSMM,toassistquantitysurveyorstoextractquantitiesdatafromBIMmodels.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    34

    over 200,000 measurement records generated directly from BIM model

    ThroughintegratingextractedquantitiesfromBIMmodel,constructionprogrammeandcostinformation,theresearchteamhascreated5D[i.e.3Dmodelsplustime(the4thdimension)andcost(the5thdimension)]cashflowsimulations,whichhelprevealingactualandpredictedcashflowoftheproject.“Sofar,wehavegeneratedover200,000measurementrecordsdirectlyfromtheBIMmodel,”saysMrLi.“Therewillbemanymoreinfuture.”

    TheresearchspansApriltoNovemberthisyear,andtheresultswillhelptohaveabetterunderstandingonprojectcashflow.MrLi

    demonstratesonewayofshowingtheresults,inwhichitispossibletoselectatimeanddate,andinstantlyshowa3Dimageofthepartlybuilthousingblockstogetherwithagraphandfiguresindicatingprojectcosts. “ExtractingquantitiesfromBIMmodelsisveryfastcomparedtomanualmeasurementsandcalculationforinterimpaymentassessments,”saysMrChoi.“Forthetraditionalpractice,weneedtoheadbacktotheofficeaftervisitingthesite,andassesstheamountofworkscompleted,whichmaytakeonetotwoweeks.”ComparingthequantitiesobtainedthroughtheQSBIMandfromtraditionalquantitysurveyingpractice,thedifferenceiswithin10%;thediscrepancieswilldecreaseasthenewmethodisfine-tuned.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    35

    May extend the use of BIM in construction industry

    “Ifthismethodindeedworksasexpected,wecanintroduceittocontractors,”saysMrChoi.“IfwefindaconstantdifferencebetweenQSBIMandtraditionalmethodsorthegapbeminimisedwemaytrytouseQSBIMtospeedupinterimpaymentassessment,whichwillbeawin-winsituationforboththeHousingAuthorityandcontractors.”

    Thoughtheresearchprimarilyfocusesoncashflowforecastandpaymentassessment,thegradualdevelopmentofstandardapproachofmodellingandmeasurementguidelinesallowQSBIMbeextendedtootherquantitysurveyingfunctions,suchaspreparingBillsofQuantitiesforBIMmodels.AnditmaybeemployedfarmorewidelywithinHongKong.

    * All images in this article are provided by Hong Kong Housing Authority

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    36

    ABouT HonG konG HouSInG AuTHorITy

    The Hong Kong Housing Authority (HA) develops and implements a

    public housing programme which seeks to achieve the Government’s

    policy objective of meeting the housing needs of people who cannot

    afford private rental housing. Approximately 30% of the Hong Kong

    population is now living in public rental housing units.

    The HA plans, builds, manages and maintains different types of public

    housing, including rental housing estates, interim housing estates, and

    transit centres. In addition, the HA owns and operates some flatted

    factories and ancillary commercial and other non-domestic facilities. The

    HA also supports the Government’s policy in providing subsidised home

    ownership flats to qualified persons.

    The Housing Department (HD) acts as the executive arm of the HA to

    help the Government achieve its policy objective on public housing.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    37

    Hsin Chong Construction Group Limited

    Project:28HennessyRoadCommercialDevelopmentProject

    Location:28HennessyRoad,HongKong

    Type:GradeAOffice

    Scheduled Time of Completion: EndJune2012

    3D Designs All Can See

    The BIM model for a Swire Properties development shows all project members the 3D appearance that would otherwise be only a mental image in the minds of one or two engineers. The model has helped to finalise the design, avoid clashes, and ensure smooth progress with construction in a small space accessed from a narrow, busy road.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    38

    From 2D to 3D

    SwirePropertiesisdeveloping28HennessyRoad,anoctagonal28-storeycommercialtower,withacurtainwallplusa“sky”gardenonthesecondfloor.Thoughthearchitect’sinitialdesignwasenteredinaBIMmodel,themajoruseofBIMwasbycontractorHsinChongConstructionGroupLimited,astheprojectenteredtheconstructionstage.

    “WedevelopedadetailedRevitBIMmodelbasedon2Dcoordinateddrawings,tohelpwithcoordinationandconstructionplanning,”saysC.M.Kwok,ChiefBuildingServicesEngineer,HsinChong.“Wefocusedonitemswheretherewashighriskofproblems,mainlyforengineering,E&Mservicesandspatialcoordination.”

    KwokandP.S.Lau,BuildingServicesManager,HsinChong,wereconfidentthatwiththeirexperience,mostofclasheswillberesolved

    afterworkonthe2DCSID.Yetcombinedservicesdrawingsarehighlycomplexin2D,withmanylinesrepresentingwalls,pipes,ductsandsoforth–andmaybeonlyexperiencedengineershavea3Dmentalimageofhoweverythingwilllookoncebuilt.“BIMishelpful,”saysLau.“It’seasiertodemonstratewhatwillhappentotheclient,sotheycanunderstandspatialinformation.WhenusingAutoCADforcoordination,itcanbedifficulttoconvincetheclientthattherewillbeminimalclashes.”

    Curtain wall and plant room

    OnepartofthebuildingwhereBIMprovedespeciallyusefulwasthecurtainwall,partlyastherewereconcernsthatrainwatermightleakintothebuildingthroughthemullionsandtransoms.“WeusedtheBIMmodeltoexplainthesystem,andshowthatthecurtainwallwoulddischargewatertooutsidewhilst

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    39

    preventingleaks,”saysLau.

    TheteamcreatedaspecialBIMmodelforthecurtainwall,toalsoassesstheexteriordesign,aswelltheinnerstructureandinterconnections.Thiswasusedforfinalisingthedesignofthecurtainwall–andensuringitwouldfitwiththebuildingstructure.

    BIMalsoprovedinvaluableforcoordinatingtheplantroom,whichwillbedenselypackedwithequipment.AcolourcodedBIMmodelhelpedKwokandhisteamdiscusstheplantroomarrangementwithSwirePropertiesandconsultants.InregularBIMreviewmeetings,theyviewedwalkthroughs,andsharedtheirpointofviewonequipmentarrangementsoitwillbemoreefficienttocarryoutoperationandmaintenance.Allavailablespacewasfullyutilised,withthelayoutseparatedintoupperandlowerzones,andaccessrouteswithsufficientroomforoperatorsandmaintenancestaff.

    Max headroom in mechanical plant rooms and the sky garden

    ThoughdifferentMEPsystemswerecoordinatedoncein2D,the3DBIMmodeldidrevealissueswiththecombinedserviceswithintherooflevel.WorkingwiththeBIMmodel,theprojectteamoptimisedthelayoutofbuildingserviceelements,suchasbyreducingsizesofsomeducts,andreroutingpipes.Clasheswereeliminated,andheadroomwasincreasedfrom1.5metresto2.2metres,whichexceededthe2.1metresaccessrequirement.Lowerinthebuilding,theskygardenabovethelobbydidnotpresentchallengesregardingserviceelements,asthespaceisrelativelyopen.ButBIMdiddeliverabenefit,asallprojectteammemberscouldseehowthegardenwilllook,andfinalisethedesign.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    40

    Modelling into the fourth dimension

    Theprojectsitehasonlyoneaccess,fromanarrow,busyone-waystreet.“Wewereconcernedaboutaccessandtruckparkingthatwouldhindertheconstructionprogram,soweuseda4DBIMmodeltodemonstratethetimerelatedtrafficflowandconstructionsequencefromthebasementtotypicalfloors,”saysKwok.

    Themodelrevealedwaysforcreatingatemporaryplatformwheretruckscouldpark,aswellasconstructionofthebasement,andthen

    buildingthegroundfloorandtakingdowntheplatform.Itincludedmaterialandequipmentstorage,andchangedovertime–thefourthdimension.

    The4Dmodelwasbuiltuptothe5thfloor,tohelpwithdevisingthefour-dayconstructioncyclefortypicalfloors.“Weshowedconstructionworkssequencingandhowtofilltheconcreteareasportionbyportion,andpresentedthemodeltotheclient,”saysKwok.Onceworkwasunderway,Kwokfounditsatisfyingtoseethatactualconstructionwasperhaps80%asintothemodel.Also,theschedulingforvehicleaccessdevisedin

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    41

    theBIMmodelworkedwellinpractice,withnotrafficjamsduetomaterialloadingandunloading,andspacerequirementsfulfilled.

    Changes in design stage not after building

    ReflectingonusingBIMfortheproject,Kwoksaysitwasespeciallyimportantforgivingtheclientanunderstandingoftheactualsituation,sochangessuchasmovinganexhaustoutletoralengthofpipingcouldbemadeinthedesignstage–ratherthanafterconstructionastypicalwhenusing2Ddrawings.

    ThoughcreatingtheBIMmodelinitiallydemandedmanpower–togetherwithassistancefromBIMconsultantForidaLimited–itdidhelpreduceclashes;andoverall,manpowerneededwasreducedbyperhaps10%.TheexperiencegainedthroughtheprojectwillhelpwithusingBIMinfuture,withsufficienttimeattheprojectcommencement

    stage,whenHsinChongmayfirstcreate3Dmodels,andthenoutputcoordinated2Ddrawingsforfrontlinepeopleuse.

    “YoucanhavealotofengineeringdatainaBIMmodel,whicheveryonecanread,”saysLau.“Thisisalsogoodforfacilitiesmanagement,withdataonequipmentthatcanbeusedformaintenance.”SwirewillindeedincorporatetheBIMmodelfor28HennessyRoadwithinthefacilitiesmanagementsoftware,whichshouldmeanthemodelremainsusefulforyearstocome.

    * All images in this article are provided by Hsin Chong Construction Group Limited

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    42

    ABouT HSIn CHonG ConSTruCTIon GrouP LIMITED

    Founded in 1939, Hsin Chong Construction Group (Hsin Chong) (Stock

    Code: 0404.HK) is one of the leading construction groups in Asia.

    Hsin Chong’s scope of services has grown to cover the entire spectrum

    of building construction, civil engineering, electrical and mechanical

    engineering, project and construction management, interiors and special

    projects, property development and asset management services. Hsin

    Chong is on the HKSAR Government – approved list of contractor for

    public works (Group C - for contracts of any value).

    Hsin Chong has also expanded its territorial coverage. From its firm

    foundation in Hong Kong, Hsin Chong has successfully applied its proven

    expertise to Macau, Chinese Mainland and overseas regions with solid

    results.

    In Hsin Chong, we promise to do our utmost to ensure total customer

    satisfaction. In face of today’s challenging economic situation and

    intensely competitive market, we are constantly in search of ways

    to improve our work efficiency and quality. At the same time, we are

    allocating more resources towards promoting the use of new technology

    to enhance industrial safety and environmental protection.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    43

    MTr Corporation Limited

    Project:ExpressRailLink–WestKowloonTerminusBuilding

    Location:WestKowloonDistrict,HongKong

    Type:Infrastructure–RailwayTerminus

    Scheduled Time of Completion: 2015

    Mega Station Builders Deploy Mighty BIM

    The MTR Corporation is making extensive use of BIM during the construction of the West Kowloon Terminus, by far the largest railway station in Hong Kong. The massive, detailed BIM model was originally deployed for modelling the Terminus structure ahead of construction to identify spatial clashes and construction co-ordination issues, its uses have expanded through collaboration with the project teams within MTR Corporation and its contractors. The project team plans to leave a legacy in the form of an ‘as built’ model in addition to the usual as built drawings to the terminus operator.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    44

    Huge rail terminus

    TheMTRCorporationisbuildingtheWestKowloonTerminus,astheterminusandimmigrationbordercrossingfortheHongKongsectionoftheExpressRailLinkconnectingHongKongwithGuangzhouandvariousMajorcitiesintheMainland.ThiswillbebyfarthelargeststationinHongKong,with4basementlevelsand15platformsatlowestbasementlevel,30metresbelowground;theplatformswhichaccommodateshuttlesandlong-haultrainsare216mand432mlongrespectively.Theterminusboxisupto600mlongand250mwide,providingagrossfloorareaofaround400,000squaremetres,comparedtoaround500,000squaremetresforHongKongInternationalAirportTerminal.Therewillbeimmigrationandcustomsfacilitiesunderground,and2majorunderpassstructurespassingthroughthebasements.Northofthe

    terminuswillbeapublictransportinterchange.

    “ThestationhasanarchitecturallyinspiredroofwhichwillbeoneofthemostcomplexinAsia–andwillbeoneofitskinds,”saysTerryMartin,SeniorConstructionEngineer–Civil,MTRCorporation.“Ithascurvilinearfreeformsteeltrussesupto175minlengthand50,000m2ofcomplexcurtainwallingandcladdingcomprisingindividuallyshapedpanels.ItalsoprovidesanaccessibleopenpublicareaontopwithpanoramicviewsacrosstoHongKongIsland.”

    De-risking the structure

    Intheproject’searlystagesduetocomplexgeometry,3Dmodellingwasusedfordesigningtheroofstructure,includingitscurtainwallingandcladding.Astheprojectneared

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    45

    construction,therewerediscussionswithintheMTRCorporationprojectteamregardingpotentialapplicationofBIMtomodeltheentiredesignoftheterminus.

    “Wehaveachallengingconstructionprocessforthewholeprojectwithmultipleinterfacesofmanydisciplines;wethoughtofusingBIMtointerrogateourdesigns–withtheintentionofensuringdeliveryofarobustdesigntoourcontractors,saysTerryMartin.“Wewantedtode-riskthestructure,ensuringitwasadequatelycoordinated.”allowingthecontractorstobuildusingthe2Dconstructiondrawingswithminimaldelaysduetoco-ordinationorclashissues.

    TheMTRCorporationteamalsodecidedtherightwaytoproceedwouldbetoownandmanagethedevelopmentoftheBIMmodel.Theywouldstartwithcivilandarchitecturalaspects,progressingtoincorporatingbuildingservices,andallowprovisionforupdatingthemodelduringthelifecycleoftheproject,makingitusefulforoperationandmaintenance.“Wewantedtoleavealegacybehind–afullycoordinatedmodelwhichcouldbegiventotheoperatoroftheTerminus,”saysTerryMartin.

    AfterreviewingotherprojectsthathaveusedBIM,assessingBIMconsultant’scapabilitiesandresources,andissuingacompetitivetenderforaBIMconsultancy,theCorporationappointedIntellibuild.Initially,themaingoalwasforthemtotake2Ddrawings,andmodelwhatthecontractorswouldbuild.

    Massive, detailed BIM model

    TheMTRCorporationissued15,000drawingstoIntellibuild,togetherwiththeroofdesigner’sBIMmodelforinformation.Intellibuildcreatedamodelthatincludesallaspectsofthestructureandfinishesandnowhasbuildingservicesbeingincorporatedtoallowspatialcheckswiththereinforcedconcretefameandarchitecturalfinishes.Buildingservicesassmallas50millimetresindiameterwillbemodelled.“We’reincludinganythingthathasspatialconsideration,”saysIrAndrewWong,SeniorConstructionEngineer–XRLTerminus,MTRCorporation.

    Themodelnowhasaround90%ofthebuildingcompleted;itshallbeupdatedwithcontractordesignedelementsatalaterstage.TheBIMmodelisamassivefilewhichhashadtobespiltintodiscreetmanageablefilesandprovidesavisualisationoftheworkingdocuments,”notesIrWong.

    Extremely effective communication tool

    Whilecreatingtheterminusinvirtualreality,theIntellibuildteamhavecollaborativelyworkedwiththeCorporationandcontractors

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    46

    toprovidesolutionstoconstructionissuesthrough3Dvisualisationofthedesign.Thishasledtoearlyresolutiontoconstructionissuesatanappropriatetimethatmayhavemanifestedduringconstruction.

    “TheBIMmodelisanextremelyeffectivecommunicationtool,”saysTerryMartin.“Wehaveheldcollaborationworkshopswithdesignconsultantsandourdeignmanagers,visualisationofproblemsfrom2Ddrawingsalonewasnotalwayspossible.Wedisplayedthemodelonascreen,andworkedoutsolutiontoissues.ItbecameverycleartoalljusthowpowerfulBIMis.”

    Themodelwillbeusedforcommunicationwiththeprojectcontractorsandotherstakeholders.Forinstance,theprojectteamwillcarryout

    walkthroughvisualisationsofkeyareasoftheterminussuchaspassengerflowthroughtheimmigrationfacilitiesandontothedepartureplatforms.

    other benefits

    UseofNavisworkssoftwarehasallowedpeoplewithoutintimateknowledgeofBIMtounderstanddesignandconstructioninthe3Dworld,significantpeopledevelopmentandnewskillsetshavebeenachievedopeninganewmindsetofwhatcanbeachievedbynewtechnologyanddevelopingideasforitsapplicationanduse.

    SomemaintenanceissuesarealsobeingaddressedusingtheBIMmodel.Forinstance,awalkthroughhelpedshowoperationandmaintenancestaffhowmaintenanceaccess

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    47

    doorsintheroofwillhelpgainaccesstoBuildingServiceswithintheroofspace.

    “ThereisalwaysopportunityevolvingfromtheBIMmodel,”saysTerryMartin.“Forexample,wearelookingatmethodsofgettingrailwaytracksdowntobasementfour–usingBIMforflowpathanalysiswhichwilldepictthespatialconstraintsofthisimportantpartoftheproject.”

    Later,awalkthroughinNavisworkswillbeusedtoprovide3Dvisualisationandawalkthroughofthevastquantityofsignage.

    Terminus project enhanced by BIM

    TheterminusBIMmodelbeganwithasmallcoreofpeoplewithintheMTRCorporationprojectteam,andhassincegrownandcontinuesgrowing.“Wearesharingthemodelwithcontractors,”saysTerryMartin.Contractorscanusethemodelintheirconstructionplanningandprovidetheirstaff

    with3Dpreviewsoftheconstructionsworks,developmentofmethodstatementsandtoenhanceunderstandingofconstructionsafetyissuesthatmayarise.Therearepossibilitiesforthemtolookatthemodelsin4D–includingtime,andperhapstouseBIMinassessingquantities,helpingtominimisewastageandenhanceproductivity.

    “ThetruevalueofBIMisdifficulttoquantify,howeverconsiderationtothepotentialtimesavedandavoidanceofabortiveworksisparamount,”reflectsTerryMartin.“WeknowtheprojectismuchbetterwithBIMthanwithoutit.”Aswellasdeliveringbenefitssuchasminimisingclashesandabortiveworks,theterminusBIMprojectisprovidingon-the-jobtrainingin3DtechnologyforbothMTRCorporationandthecontractors’constructionprojectstaff–andhelpingtheMTRCorporationmovetowardsincreasingdeploymentofBIM.

    * All images in this article are provided by MTR Corporation Limited

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    48

    ABouT MTr CorPorATIon LIMITED

    Carrying an average of 4 million passengers every weekday, the MTR is regarded as one of the world’s leading railways for safety, reliability, customer service and cost efficiency.

    The MTR Corporation was established in 1975 as the Mass Transit Railway Corporation with a mission to construct and operate, under prudent commercial principles, an urban metro system to help meet Hong Kong’s public transport requirements. The sole shareholder was the Hong Kong Government.

    The Company was re-established as the MTR Corporation Limited in June 2000 after the Hong Kong Special Administrative Region Government sold 23% of its issued share capital to private investors in an Initial Public Offering. MTR Corporation shares were listed on the Stock Exchange of Hong Kong on 5 October 2000.

    The Corporation marked another major milestone on 2 December 2007 when the operations of the other Government-owned rail operator, the Kowloon-Canton Railway Corporation, were merged into the MTR, heralding a new era in Hong Kong railway development.

    Other than bringing more efficient and competitively-priced services to local rail passengers, the merger brings new growth opportunities to the MTR Corporation’s businesses in and outside of Hong Kong.

    The merged rail network comprises nine railway lines serving Hong Kong Island, Kowloon and the New Territories. In addition, a Light Rail network serves the local communities of Tuen Mun and Yuen Long in the New Territories while a fleet of buses provide convenient feeder services.

    The Corporation also operates the Airport Express, a dedicated high-speed link providing the fastest connections to Hong Kong International Airport and the city’s newest exhibition and conference centre, AsiaWorld-Expo.

    From Hong Kong, passengers can travel with ease to Guangdong Province, Beijing and Shanghai in the Mainland of China using the MTR’s intercity railway services.

    The Corporation also operates the Airport Express, a dedicated high-speed link providing the fastest connections to Hong Kong International Airport and the city’s newest exhibition and conference centre, AsiaWorld-Expo.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    49

    ronald Lu & Partners

    Project:CICZeroCarbonBuilding

    Location:KowloonBay,HongKong

    Type:Community

    Scheduled Time of Completion: June2012

    Fast-Tracking Design Process for an Energy-Plus and Climate-Responsive Building

    Faced with the challenge of fast-tracking the design process of Hong Kong’s first zero carbon building, Ronald Lu & Partners deployed BIM modelling–which, in a timely manner, helped resolve challenges ranging from optimum siting of the building and enhancing landscape aesthetics, to designing and building maximizing natural daylight.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    50

    Hk’s First Zero Carbon Building

    Withitslowprofile,andcurvedroofpackedwithphotovoltaicpanels,ZCB,HongKong’sfirstzerocarbonbuilding,looksfuturistic,almostlikeasplendidhomeinasciencefictionmovie.Thebuildingisdesignedtobeenergy-plus:i.e.producingmorerenewableenergythanitconsumesonanannualbasis.Itisalsoaspiredtoharmonizewiththeurbanenvironmentandenhancethemicro-climateofthesiteanditsimmediatesurrounding.

    CreatedfortheConstructionIndustryCouncil,ZCBisindeedmeanttoshowthewaytoamoresustainablefuture,showcasingtechnologiestoreduceenergyuse,andslashcarbondioxideemissions.AfteritopensinAugustthisyear,buildingprofessionalsandthegeneralpubliccanvisittoexploreexhibits,an

    officeandademonstrationeco-home.

    ZCBwasdesignedusingBIM,whichwasparticularlyvitalgiventherewasaverytighttimeframe:thearchitectRonaldLu&PartnersreceivedthecommissioninAprillastyear,withbuildingcompletiondueayearlater.“Weneededveryclosecollaborationbetweeneveryoneinvolvedfromdesigntoconstruction,”saysTonyIp,SeniorArchitect,RonaldLu&Partners.

    Locating the building with BIM

    ZCBisona1.4-hectaresite,andasimplifiedBIMmodelwasusedtooptimisethebuilding’slocationandorientation.Informationonthemassing–themainbuildingform–wasextractedfromthemodel,andpassedtotheengineeringconsultantforfiniteelement

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    51

    analysiscoveringaspectssuchasamountsofsunlightreceived,andwinds.

    Thishelpedwithpositioningthebuildingsoitcouldreceiveoptimumwindflow,whilstminimisingsolarheating.

    “WealsousedtheBIMmodeltodesignthebuildingenvelopeinordertominimiseenergyuse,”saysMr.Ip.“Forexample,wehadwindowsatacertainelevation,andtheenvironmentalconsultantrecommendedwechangetheirsize.WewentbacktotheBIMmodel,revisedthewindows,andtheconsultantthenperformedanotheranalysistoseeiftherewasanimprovement.”

    Thedesignevolvedtooptimisewindowandwallratios,withlargerwindowsfacingnorth,andsomeshadingtothesouth.

    Enhancing aesthetics of the site

    “Alsoduringthedesign,weminimisedcutandfillvolumeofthesoil,”saysMr.Ip.“BIMreallyhelpedustovisualisethisina3Dway,asweassessedhowmuchmaterialtodigoutforthebasement,andwaystodistributethistoformaringpath.”

    WiththeBIMmodel,Mr.Ipandcolleaguesensuredthatthepedestrianaccessrouteswouldnotbetoosteep.Aestheticswereconsidered,too.Planscalledfortreestobeplanted,

    partlytohelppurifytheairandserveasanaturalnoisebarrier,andthesewereincludedintheBIMmodel.“Weuseda3Dwalkthroughtovisualisethesenseofarrival,includingthebestsitingofthemainentranceandaviewingplatform,”saysMr.Ip.

    Curvilinear roof impossible without BIM

    “BIMcanreallyhelpusdo3Ddesign,”addsMr.Ip.“Forthefirstdesignworkshop,mostconsultantscametoouroffice,andweusedthe3Dmodeltoshowthedesignintent.They

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    52

    allgaveinput,andcouldeasilyunderstandthedesign.”

    AkeyfeatureofZCBisthecurvilinearroof,whichMr.Ipsayscouldnotbecreatedwithout3Dmodelling:itwouldnotbepossibletosimplygiveengineersdrawingsofcrosssections.Virtualrealityprovedreallyusefulinshowingtheroofdesign,suchasthroughscreenprintsfromtheBIMmodel,whichcouldbeemailedtoengineers.

    Makingtheroofpresentedchallenges.“Thiswasmadeofreinforcedconcrete,andthecontractorhadtodeterminehowtocastthisinacurvedform,”saysMr.Ip.“WedidBIMfor3Dcoordination,andtransferredthisto

    thecontractor.”Aidedbythe3Dmodel,thecontractorcreatedtheroofwhilstusingtheminimumamountofformwork.

    TheBIMmodellikewisehelpedwithinstallingtheroof’sarrayofphotovoltaicpanels,eachofwhichhasuniquesettingoutpointstoensureoptimumorientation.

    BIM proves its worth for interior too

    Attherearofthebuilding,thecurvingroofmeetsaglasswall,andthewindowworkscontractorusedthe3Dmodeltorealisethecomplexdesign.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    53

    Inside,too,theBIMmodelproveditsworth.Theenvironmentalconsultantusedittoperformsolarpathanalyses,tooptimiseinternaldaylighting.Airflowswereenhancedtominimiseneedforairconditioning,includingbyfeaturingcentrallylocated“windcatchers”.Keyexhibits–whichwillshowcaseenvironmentallyfriendlydesign–wereincludedintheBIMmodel,tocheckforconflicts,andreviewspatialsequences.

    ThemodelhelpedtorefinesomeoftheMEP(mechanical,electricalandplumbing)design,suchaseliminatingclashesbetweenlargehigh-volume-low-speedceilingfansandhangingexhibits,andspecifyingtheexactsettingoutforconcealedelectricalconduitsintheceiling.

    Complex building designed faster with BIM

    RonaldLu&PartnersisstillinattheearlystageofusingBIM,thoughfoundithighlyusefulforthecomplexZCBproject,whichcouldnothavebeenbuiltsoquicklyusingtraditionaldesignmethods.

    “WehavebeenusingBIMforaroundfiveyears,”saysVincentChau,BIMCoordinator,RonaldLu&Partners.“Wehaveasupportteam,fortrainingcolleaguesandhelpingprojectteamintheirBIMprocessandsetupBIMstandardandprocedure.”

    * All images in this article are provided by Ronald Lu and Partners

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    54

    ABouT ronALD Lu & PArTnErS

    Ronald Lu and Partners is an award-winning architecture and interior

    design practice dedicated to the delivery of world-class projects and

    green built environments across the globe.

    Founded over 35 years ago, we have consistently pioneered sustainable

    architecture and are recognised as industry leaders. We have over 500

    staff across our Hong Kong headquarters and four mainland China

    offices, and more than 70% of our accredited professionals have

    achieved BEAM Pro or equivalent international standard, which drives

    sustainability throughout our firm. We embrace a holistic approach

    and are committed to excellence in design and construction, as well as

    maximising opportunities for greater social, economic and environmental

    benefits for communities.

    Our expertise in sustainability is integrated with our broad spectrum of

    design services including master planning, new build, interior design,

    urban regeneration and architectural research. We are delivering projects

    ranging from BEAM Plus assessment standard (and national/international

    equivalents), up to the state-of-the-art Zero Carbon building.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    55

    Advisors’ CommentsIntroduction

    Thisyear,weareextremelyhonouredtoreceivetheinvaluablesupportfromthelocal

    supportingorganisationsandoverseasBIMadvisors.Anadvisorypanelwasformedbythe

    representativesoflocalsupportingorganisationstodiscussandreviewtheselectedprojects,

    andtheircommentswereconsolidatedandrecorded.Inadditiontothecommentsofthe

    selectedprojects,theoverseasadvisorsalsosharedwithusabouttheBIMdevelopmentin

    otherpartsoftheworld.

    Supporting organisations

    • CharteredInstituteofArchitecturalTechnologists,HongKongCentre(CIAT)

    • HongKongInformationTechnologyJointCouncil(HKITJC)

    • InstitutionofCivilEngineers,HongKong(ICEHK)

    • TheCharteredInstituteofBuilding,HongKong(CIOB)

    • TheCharteredInstitutionofCivilEngineeringSurveyors(ICES)

    • TheHongKongInstituteofArchitects(HKIA)

    • TheHongKongInstituteofBuildingInformationModelling(HKIBIM)

    • TheHongKongInstituteofClerksofWorks(HKICW)

    • TheHongKongInstituteofFacilityManagement(HKIFM)

    • AutodeskIndustryAdvisoryBoard(AIAB)

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    56

    Advisory Panel - Representatives of Supporting Organisations

    Mr.HermannFONG, Chairman, Chartered Institute of Architectural Technologists, Hong Kong Centre

    Ms.SOChing, Chair, Board of Practices, The Hong Kong Institute of Architects

    Mr.RickyWAN, Member of Executive Committee, Hong Kong Information Technology Joint Council

    Ir.Dr.StewartWAN, The Hong Kong Institute of Building Information Modelling

    Mr.JosiahKYLEUNG, Chairman, Institution of Civil Engineers,

    Hong Kong

    Mr.DickLI, Chairman of CPD and Promotion Committee The Hong Kong Institute of Clerks of Works

    Dr.LEEFookPuiBilly, President, The Chartered Institute of Building, Hong Kong

    Ms.CelinePCTAM, President, The Hong Kong Institute of Facility Management

    Mr.HonbyCHAN, Chairman, The Chartered Institution of Civil Engineering Surveyors, Hong Kong Region

    Mr.DavidYAU, Chairman, Autodesk Industry Advisory Board

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    57

    Advisors’ Comments from Supporting Organisations

    Atkins ThiscasedemonstratedgooduseofBIMandsustainabledesignintheearlystageofprojectconception.WithBIMandsupportedbydifferentsoftware,thedesignteamquicklydevelopedandcompareddifferentdesignoptions,selectedthebestonewiththebestsustainabilityperformancewithoutcompromisingarchitecturalappearanceandclient’srequirements.

    Chinachem GroupBIMwasusedtocoordinateacomplexshapeandoptimizetheLEDplacement.Inthiscase,BIMenabledthedesignofasphericalcurvedscreenonacomplexstructure,andhelpedtooptimizethebalanceofpriceandqualitybymakingdifferentdesignoptionsavailablequickly,tocompareandfinalizetheresult.BIMwasusedinpresentationtodifferentpartiesandauthorities.ThiscasealsodemonstratedBIMasatoolfordesigndecisionmaking.

    Goldin Properties Holdings LimitedGooduseofBIMforcoordinationofE&Mandstructuralsystems.ThedeveloperadoptedBIMusagewhichhasnowbecomeabasicrequirementofmanyoftheconstructionprojects.TheprojectdemonstratedeffectiveuseofBIMtechnologyinsystemcoordinating,bysettinguptheBIMmodelproperlyandintelligently,thedesignteamcouldeasilycrosscheckthedesignrequirementswiththemodel.Thus,savingtimeforthedesignteamfromdoingcoordinationworksandreducingconstructionwastage.

    Hang Lung Properties LimitedThisprojectadoptedtheuseofCivilBIMinundergroundsystemsdesignwhichisinacongestedutilityareatoensurenomajordisruptionstotheneighbourhood.Thebenefittothedeveloperwastoavoidmessycomplaintsandpossibledelaysfromdamagetoutilities.Thiscasealsodemonstratedgooduseinhelpingretainingwallcoordinationandintegrationtotherestoftheproject.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    58

    Hong kong Housing AuthorityNewadoptionofBIMapplicationforcostcontrol.TheBIMmodelwasembeddedwithquantityandcostinformation,whichinreturn,couldbeaveryeffectivetooltochecktheactualworkdoneforprogresspaymentandcostcontrol,sothattheteamcouldeasilycomparethescheduledandactualprogramme.ThiscaseisaverygooddemonstrationofBIMusagebyQuantitySurveyorforschemefinancialcontrolandforecastandprovidedagoodcasetodemonstratebusinesspracticetransformation.

    MTr Corporation LimitedTheBIMservedasaplatformforcommunicationamongsttheprojectteamanddifferentstakeholders.Itwashardtounderstandthebuildingcompletelywithtraditional2Ddocumentation.WeappreciatethatMTRhassetupacomprehensiveworkflowonthemanagementprocessofBIMwhichinreturncanbenefittocostsavingandminimizetheriskoftheconstruction.ItwasoneofthemostcomprehensiveusagesofBIMduringconstructionstage.

    ronald Lu and Partners TheuseofBIMassistedinthedesignoptimizationforasustainabledesignproject;provingbetterplanningcouldreduceconstructionwastage;alignmentofsolarpanelsformaximizingenergyproductionwhilstkeepingitasanarchitecturalfeature;andbalancesoilfromcutandfilltominimizesoildisposalandtransportation.Thepresentationwasveryclearwhichhelpedtodemonstrateoutstandingsustainabledesign.

    Hsin Chong Construction Group Limited BIMwasusedtooptimizetheclearheadroomwhichenabledtheclienttomaximizeGFAusage.Theplantroomdesigncouldhelptoincreaseefficiencyandfulluseoftheoverheadspace.ThiscaseprovidedagooddemonstrationofdetailedcurtainwalldesignusingBIM,andearlycoordinationofconstructiondetailswhichcouldhelpthemanufacturerproducedetaileddesigninacosteffectiveway.Theprojectprovidedagoodcasetodemonstratebusinesspracticetransformation.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    59

    Advisors’ CommentsDr. Calvin Kam

    Atkins – Informed Early DesignWorkingunderafast-trackedschedule,thedesignteamusedRevitandVasaritoperformwindandsolarexposureanalysesduringearlyprojectphasestocommunicatethedesignintenttoprojectpartnersandensureasustainabledesign.BIMsupportedcollaborativeinputfromtheprojectteamandmodel-basedanalysestoproperlyinformearlydesigndecisions.

    Chinachem Group – Design VisualizationAsianHouseprojectdemonstratesthepowerofenhancedvisualizationenabledbyBIM.Theteamusedhigh-resolutionrenderingstoexploreandselectthebestdesignandarrangementforalargeLEDdisplayincorporatedintothebuildingfacade.

    Goldin Properties Limited – Complex MEP CoordinationStrictceilingheightrequirementspromptedclashdetectionandtheproductionofreflectedceilingplanstoidentifylow-hangingMEPcomponentsandre-routethemtoreduceconflictsanddelaysduringtheconstructionprocess.BIMfacilitatedthecollaborationofmultipletradestofindthebestroutingsolutionsandshowthemwithinthemodel.

    Hang Lung Properties Limited – Design optimizationAchallenginghillsidesiterequiredauniqueretainingwallandlandscapedesignaccommodatingtheirregularthree-dimensionalslope.BIMwasusedtomodelexistingsiteconditions,streamlinetheinitialretainingwalldesignwhilereducingconcretevolumeby40%,andcapturetheretainingwalldatatoassistconstructionefforts.

    Hong kong Housing Authority – Quantity and Cost ControlThisteamdevelopedQuantitySurveyingBuildingInformationModeling(QSBIM)toreducethetimetogeneratecostestimates,andincreaseaccuracy.Thisapproachsystemizesthequantitytakeoffprocess,linksBIMtocostdatabases,andcombinesquantitiesextractedfromBIMwithcostinformationandtheprojectscheduletoproducecashflowsimulations.TheinnovativeQSBIMsystemgreatlyimprovedestimationproductivity,andresultedinmoreaccurate,informeddecisionsrelatedtoprojectfinancesandbudgeting.

    overviewRangingfromearlydesignanalyses,toconstructionmonitoringandcostmanagement,toincorporatingend-userconsiderationsforfacilitymanagement,theprojectsinthe2012HongKongBIMAwardsillustratetheincreasedproductivity,costsavings,andimprovedqualitymadepossiblethroughBIM-enableddesignandconstruction.ThewidevarietyofprojectsandstakeholdersrepresentedisatestamenttoBIM’svalueanditsdiffusionwithintheHongKongdesignandconstructioncommunity,bringingitsstateofpracticetotheforefrontofindustryprogression.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    60

    Hsin Chong Construction Group Limited – Facility operationsFacilitymanagementwasakeyconsiderationthroughouttheBIM-enableddesignprocess.Themodelwasusedtooptimizeequipmentlayout,providesafeandfunctionalaccesspathsforefficientoperationsandmaintenance,andmanagebuildinginformationtoassistendusersinfuturefacilitymanagement.

    MTr Corporation Limited – Process BenefitsUsingBIMtoidentifydesignandconstructionissuesreducedprojectrisk,avoidedabortiveworks,minimizedmaterialwaste,andincreasedoverallcostsavings.Thiswaslargelyaccomplishedthroughleveragingthe3Dmodelforenhancedvisualization,andusingitasacommonplatformformutualunderstandingofthedesignintentamongmultiplestakeholders.

    ronald Lu and Partners – BIM for SustainabilityOptimizingsolarandwindresourceswasoneofthechiefgoalsoftheZeroCarbonBuilding,andthiswasachievedbyvaryingthebuildingorientationandcurvedexteriorshapewithintheBIMandmodel-basedanalyses.Theresultwasmaximizedsolarexposureandnaturalventilation,whichoptimizeddaylighting,reducedsolarheatgain,andimprovedPVarrayenergycollection.

    outlookAfterreviewingthisshowcaseofexemplaryprojectsIwouldencourageHongKong’sBIMauthoritiesandleaderstoraisetheirstandardofpracticethrough:

    -Increasingthematurityofmodeluses,movingfromvisualizationtotheautomationandoptimizationofdesignandconstructiontasks.-EstablishingandtrackingBIM-basedobjectivesthroughtheprojectlifecycle,andbenchmarkingperformancetofuelcontinuousimprovements.-IncreasingthelevelofintegrationbetweenvariousprojectstakeholdersinordertoestablishBIMasatoolforenhancedcollaborationandoptimizedprojectvalue.-CreatingKeyPerformanceIndicators(KPI)andmetricsandthenmonitoringthemthroughoutthelifeoftheprojectstoprovideanaccuratepictureofBIMadoptionperformanceanditsReturnonInvestment(ROI).-Documentingstandardsandbestpractices,andprovidingcontinuousfeedbackmechanismstocreateaBIMknowledgebaseforguidingimplementationinnewprojectsandacrosstheHongKongdesignandconstructionindustry.

    Dr. Calvin kamPhD, AIA, PE, LEED AP

    Dr.CalvinKamistheFounderandCEOofbimSCORE—the“GPSNavigator”foranyenterpriseorprojectteamchartingacourseforBuildingInformationModeling.Dr.KamistheDirectorofIndustryProgramsandaConsultingAssistantProfessoratStanfordUniversity’sCenterforIntegratedFacilityEngineering(CIFE),wherehespecializesinstrategicinnovationsuchasBuildingInformationModeling(BIM),VirtualDesignandConstruction(VDC)andSustainableDevelopments.HeisaCo-founderandtheSeniorProgramExpertoftheNational3D-4D-BIMProgramwithGSAPublicBuildingsService.Singaporegovernment’sBuildingConstructionAuthorityhasappointedCalvinasaninternationalexperttoadviseits2015constructionproductivityandBIMroadmap.Heservesasthe2010&2011NationalChairoftheAmericanInstituteofArchitects(AIA)TechnologyinArchitecturalPractice(TAP)NationalKnowledgeCommunity,andthe2011&2012NationalCo-ChairofAIACenterforIntegratedPractice.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    61

    Atkins ThisprojectisanimpressivedemonstrationofAtkins’commitmenttoBIM-enabledsustainabledesignpractices,whilemaintainingafast-trackdesignschedule.AtkinswasabletoachieveamoreenergyefficientdesignbytakingadvantageofintegratedanalysistoolsinRevit,3dsMaxDesignforlightinganalysis,aswellasProjectVasariforwindanalysisandsolaranalysis.Byincorporatesustainabledesigndecisionmakingduringtheearlieststagesofdesign,Atkinswasabletoachieveanoptimaldesignfaster.

    Chinachem GroupThisprojectillustratesthevalueofmodel-baseddesignforfaster,moreeffectivedesigndecision-making.TheLEDisasignificantfeatureofChinachemGroup’sdesign.Therefore,understandingtheidealshapeoftheLED“neck”ofthebuildingisimportanttotheoveralleffectofthebuilding.BymodellingtheneckinRevit,ChinachemwasabletoaccuratelyvisualizetheeffectoftheLEDpanels,andoptimizethedesignfortheidealLEDresolution.Visualizationscreatedin3dsMaxusingtheRevitmodelhelpedChinachemcommunicatedesignintenttotheclientmoreclearly,supportingthedecision-makingprocess. Goldin Properties Holdings LimitedTheTianjinGoldinMetropolitanprojectisagoodexampleofcollaborationamongMEPengineersandstructuralengineerstosolveadesignchallenge.Inthiscase,theprojectteamusedacreativeapproachtoidentifyissuesinthedesignoftheproject’sbasement.Theteamworkedtogethertoreachasolutionforadesignchallenge,demonstratingtheeffectivenessofmultidisciplinarycoordinationinspeedingprojectwork. Hang Lung Properties LimitedHangLungPropertiesLimitedusedBIMtodesignauniqueretainingwallwithinterestinglandscapedesignfeaturesaspartoftheirBluePoolRoadResidentialDevelopmentproject.BIMsupportedthefirm’scollaborationwiththelandscapearchitect,tofinddesignsolutionsthatwerebothstructurallysoundandaestheticallyappealing.BIMhelpedtheprojectteamreduceconcretevolumeoftheretainingwallby40percent,helpingtoreduceconstructionandlaborcosts.

    Advisors’ CommentsMr. Phillip G. Bernstein

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    62

    Mr. Phillip G. BernsteinFAIA, RIBA, LEED AP

    PhilisaVicePresidentforStrategicIndustryRelationsatAutodeskwhereheisresponsibleforthecompany’sfuturevisionandstrategyfortechnologywithparticularfocusonthebuildingindustryaswellascultivatingandsustainingthefirm’srelationshipswithstrategicindustryleadersandassociations.FormerlyaprincipalwithPelliClarkePelliArchitects,heteachesProfessionalPracticeatYalewherehereceivedbothhisB.A.andhisM.Arch.Heisco-editorofBuilding(In)TheFuture:RecastingLaborinArchitectureandBIMInAcademia,aSeniorFellowoftheDesignFuturesCouncilandformerChairoftheAIANationalContractDocumentsCommittee.

    Hong kong Housing AuthorityThisprojectdemonstratesthevaluethatBIMcanprovidefor5Dmanagementofprojectcostsandcashflow.HongKongHousingAuthorityleadsChinainadoptingasystemtousetheinformationinbuildingmodelstoautomatequantification,increaseaccuracyofquantitydataandcosts,andsharedataamongprojectstakeholders. Hsin Chong Construction Group Limited ThisprojectisagoodexampleofthecollaborationbenefitsthatBIMextendstotheconstructionprocess.HsinChongConstructionGroupLimitedwasabletousethemodeltominimizeclashesintheplantroomdesignandexpandtheheadroomintherooflevelofthebuilding.Themodelwasalsousedfor4Dconstructionplanning,whichfacilitatedimprovedcommunicationamongthedeveloper,consultants,andsub-contractors. MTr Corporation LimitedInthisproject,MTRCorporationLimitedtookadvantageofthebenefitsofBIMforcollaborationandcommunicationwithprojectstakeholderstoidentifydesignissuesaheadofconstruction.Throughthisproject,MTRexpandedtheuseofBIMamongseveralofthefirm’sbuildingandcivilteams,helpingtoadvancethefirm’suseofBIMforbusinesspracticetransformation. ronald Lu and Partners ZCBisdesignedtobeHongKong’sfirstcarbon-neutralbuilding,animpressiveachievement.RonaldLuandPartnersusedBIMtoachievetheirambitiousdesigngoals.Specifically,BIMhelpedtheprojectteamdeterminethearticulationofsolarpanelstomaximizesolarreception,whileminimizingsolarheatgain.BIMalsoenabledtheteamtostrategicallylocateinnovativegreenfeaturesofthebuilding,andspeedthedesignandconstructionprocess.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    63

    Advisors’ CommentsDr. Li Yun Gui

    BIM closes gap between construction and

    manufacturing Constructionhasmanysimilaritieswithmanufacturing.Theirworkingmodesmaydiffer,butwecanseeatrendintheconstructionprocessbecomingmoreakintoamanufacturingprocess.Inaway,bothindustriesproducemerchandise.Amultitudeofmerchandiseimpactsourdailylives,yettheproductoftheconstructionindustryisrelativelysimple:livingspace.

    Thetwoindustries’productionprocessesareradicallydifferent:afactoryproductionlinehasafixedlocation,withproductsinvariousstagesofcompletionmovingalongaline.Theconstructionprocesscombinesfactorymanufacturingandin-situinstallation,sotheconstructionindustrycanbenefitifmoreworkcanbedoneinfactories,minimisingin-situproductionwork. Longbeforebeingdeployedinconstruction,informationtechnologywasemployedinmanufacturingindustryproductionprocesses,inventorymanagement,andchannelsandsalesprocesses.Wecanseeitresultedinincreasedefficiencyofmanufacturingprocesses,andledtosubstantialreductionsinproductioncosts,oneofthereasonsbeingtheimplementationoftheproductdatamanagementconcept.TheconstructionindustryisstillintheeraofCAD–computeraideddrafting;blueprintsareyettobecomehistory.WecannowseethatadoptingBIMhasbecomethedirectiontheconstructionindustrymustfollowtoenhanceitsworkflow.

    BIM’sroleistomakeconstructionprojectinformationmoreaccessibletotheprojectteam,inplanning,surveying,construction,supervision,operationandmaintenance.Alldecisionsthroughoutthelifeofabuilding–fromconcepttodemolition–canrelyoninformationasthebasisfordecision-making.BIMcandirectlyapplydigitaltechnologyintheconstructionfield,describingproblemstohelpresolveissuesindigitalconstructionprojects.Designers,engineersandtechnicianscanmakethecorrectresponsestoavarietyofbuildinginformation,ensuringasoundbasisforaprojectdeployingBIM.

    BIMisamethodology,applicabletothewholeprojectlifecycle,supportinganintegratedmanagementenvironmentforconstructionprojects,significantlyimprovingefficiencyandreducingriskthroughouttheconstructionprocess.ThedevelopmentofnewBIMtechnologyisbecomingbothachallengetothetraditionalconstructionindustry–whichmustdeterminewhetheritiswillingtoreformandinnovateandbecomemoreefficientwithlessrisk–andachallengetothetraditionalindustrypatternsofbehaviourandmanagementstyles.

    TherearethreemainaspectstotheroleofBIM:“Numbers”,“People”and“Action”.“Numbers”referstodigitalinformation.BIM’scoreroleissolvingdataissuesbyusinginformationsharingintheconstruction

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    64

    Dr. Li yun Gui China Academy of Building Research

    Dr.LiYunGuihasbeenaresearcherformanyyears,engagedinhigh-risebuildingstructuralanalysisanddesign,ITapplicationintheconstructionfieldandtheapplicationoftheoreticalresearchandapplicationdevelopment.Heisresponsibleforthedevelopmentofhigh-risebuildingstructurefiniteelementanalysisandthedesignsoftwareSATWE,whichhasbecomeaprimarysoftwareforChina’shigh-risebuildingsstructure.ThissoftwarehasbeenpromotedtoSingapore,Vietnam,HongKongetc.

    Dr.LihaswonanumberofawardsinChina.HecurrentlyistheViceGeneralEngineerofChinaAcademyofBuildingResearch.

    process.AutodeskBIMsoftwareiswidelyusedaroundtheworldtoprovideeffectivetoolsandtechnicalsupport.

    “People”referstocommunicationsbetweendifferentpeopleintheconstructionprocess:howcanwecollaborate,whilstretainingpersonalisation?Anentireconstructionproject–fromprojectplanning,designandconstruction,tooperation,maintenance,andevendemolition–requirestheinvolvementofdifferentpersonnel,andthroughouttheprocessinvolvescommunications,decision-making,andcollaboration.Therearevarioustraditionalandcommonplacepracticesofdifferentindustriesindifferentcountries;thesemustbereflectedinthewaysBIMisappliedandadopted.

    “Action”referstotheactualconstruction.Thisisourmission,andwillnotchangenomatterwhetherweapplyBIMornot.WearepromotingtheapplicationofBIMinconstructionprojectstoenablebetterresults,reduceerrors,reducewaste,improvequality,increaseefficiency,andsupportsustainabledevelopment.

    Theaward-winningprojectsdemonstratesuccessfulusesofthetechnology,suchasfordesigncollaboration,clashchecking,decision-making,constructionprojectmanagementandvisualisation.Chinahasahugenumberofconstructionprojects;accordingto2010statistics,upto700,000projectswereunderconstruction,withtotalconstructionareaof2.6billionsquaremetres,andprojectinvestmentofupto10trilliondollars.BIMcanbewidelyused,andweexpectBIMtoplayagreaterroleinmanyprojects.

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    65

    Outstanding Students’ Projects

    Thisyear,weareexcitedtohighlightthreeoutstandingstudentsfromlocaluniversitiesandhigherinstitutions.ThestudentsshowtheadvancedBIMusageintheirprojects.Autodesksupportsthelocaleducationalinstitutionsonmakingthelatesttechnologyavailabletostudenttraining,tonurturetheskillsofanewgenerationofarchitectsandengineerswhowillplaykeyrolesinHongKong’sAECindustry.ThesophisticateduseofBIMinallthreeprojectsishighlyencouragingregardingthelocaldevelopmentofBIM-whichwillinturnleadtobetterdesigned,moresustainablebuildingsinHongKongandacrosstheregion.

    The three awarded students are:

    Yim Tak On DepartmentofArchitectureChuHaiCollegeofHigherEducation

    Lam Ka Chun DepartmentofConstructionHongKongInstituteofVocationalTrainingCouncil(TsingYi)

    Kwok Wing Ho, Matthew DepartmentofArchitectureTheUniversityofHongKong

  • Lead the WayAutodesk Hong Kong BIM Awards 2012

    66

    Institution: ChuHaiCollegeofHigherEducationName: YimTakOnDepartment: ArchitectureCourse: ArchitecturalDesign&Theory

    Project Name: YouthEco-Housing@AndersonRoadEX-Quarry

    Challenges and Solutions: TheprojectisaboutreusetheEX-Quarryas