2
Lead Time Accuracy Requirements
• Identified by Joint FAA/NWS Traffic Flow Management (TFM) Weather Requirements Working Group (TRWG)
• Performance-Based Weather Information Requirements– Linked to Decisions for Traffic Management Initiatives– Accuracy needed at decision points prior to onset and cessation
• New Verification Method, Different than Traditional Method– Probability of Detection (POD) and False Alarm Ratio (FAR)
only at time of onset and cessation, not throughout event duration
• Verification Metrics to Baseline Current Support against New Performance-Based Requirements– NWSH Performance Branch developed modified version of Stats
on Demand
3
Lead Time Accuracy Requirements
Accuracy Criteria Needed for Time of Onset and Cessation of IFR, MVFR, VFR Conditions
IFR, MVFR, VFR Conditions for Core Airports
Lead Time
Projection
Accuracy
(minutes)
Probability of
Detection
False Alarm Ratio
Timing Error
(minutes)
Time of Onset
0 - ≤ 2 h ± 15 min ≥ 80% ≤ 20% ≤ 15 min
> 2 - ≤ 4 h ± 30 min ≥ 75% ≤ 25% ≤ 30 min
> 4 - ≤ 6 h ± 45 min ≥ 70% ≤ 35% ≤ 45 min
> 6 - ≤ 8 h ± 60 min ≥ 65% ≤ 40% ≤ 60 min
Time of Cessation
0 - ≤ 2 h ± 15 min ≥ 80% ≤ 20% ≤ 15 min
> 2 - ≤ 4 h ± 30 min ≥ 75% ≤ 25% ≤ 30 min
> 4 - ≤ 6 h ± 45 min ≥ 70% ≤ 35% ≤ 45 min
> 6 - ≤ 8 h ± 60 min ≥ 65% ≤ 40% ≤ 60 min
4
Lead Time to Cig/Vis Event Example
Obs
00Z TAF
0:00 3:00 6:00 9:00 12:00 15:00 18:00 21:00 0:00
VFR MVFR IFRMVFR Onset 0536Z
VFR Cessation 0536Z
MVFR Forecast Onset 0500Z
VFR Forecast Cessation 0500Z
5
TAF Lead Time - IFR Onset POD
2-4 Hour Lead Time to Onset of IFR Conditions at Core Airports
Pro
babi
lity
of D
etec
tion
Num
ber of Events/F
orecasts
75%
2012 2013
6
TAF Lead Time – IFR Onset FAR
2-4 Hour Projection to Onset of IFR Conditions at the Core 30 Airports
25%
Num
ber of Events/F
orecastsF
alse
Ala
rm R
atio
2012 2013
7
TAF Lead Time - IFR Onset Timing Error
Mean Absolute Timing Error: 2-4 Hour Lead Time to Onset of IFR Conditions
30 min
Num
ber of Events/F
orecastsT
imin
g E
rror
(m
inut
es)
2012 2013
8
TAF Lead Time - IFR Cessation POD
2-4 Hour Lead Time to Cessation of IFR Conditions at Core Airports
75%
Num
ber of Events/F
orecastsP
roba
bilit
y of
Det
ectio
n
2012 2013
9
TAF Lead Time - IFR Cessation FAR
2-4 Hour Projection to Cessation of IFR Conditions at the Core 30 Airports
25%
Num
ber of Events/F
orecastsF
alse
Ala
rm R
atio
2012 2013
10
TAF Lead Time - IFR Cessation Timing Error
Mean Absolute Timing Error: 2-4 Hour Lead Time to Cessation of IFR Conditions
30 min
Num
ber of Events/F
orecastsT
imin
g E
rror
(m
inut
es)
2012 2013
11
TAF Lead Time - MVFR Onset POD
2-4 Hour Lead Time to Onset of MVFR Conditions at Core Airports
75%
Num
ber of Events/F
orecastsP
roba
bilit
y of
Det
ectio
n
2012 2013
12
TAF Lead Time - MVFR Onset FAR
2-4 Hour Projection to Onset of MVFR Conditions at the Core 30 Airports
25%
Num
ber of Events/F
orecastsF
alse
Ala
rm R
atio
2012 2013
13
TAF Lead Time - MVFR Onset Timing Error
2-4 Hour Lead Time to Onset of MVFR Conditions at Core Airports
30 min Num
ber of Events/F
orecastsT
imin
g E
rror
(m
inut
es)
2012 2013
14
TAF Lead Time - MVFR Cessation POD
2-4 Hour Lead Time to Cessation of MVFR Conditions at Core Airports
75%
Num
ber of Events/F
orecastsP
roba
bilit
y of
Det
ectio
n
2012 2013
15
TAF Lead Time - MVFR Cessation FAR
2-4 Hour Projection to Cessation of MVFR Conditions at the Core 30 Airports
25%
Num
ber of Events/F
orecastsF
alse
Ala
rm R
atio
2012 2013
16
TAF Lead Time - MVFR Cessation Timing Error
Mean Absolute Timing Error: 2-4 Hour Lead Time to Cessation of MVFR Conditions
30 min Num
ber of Events/F
orecastsT
imin
g E
rror
(m
inut
es)
2012 2013
17
TAF Lead Time - VFR Onset POD
2-4 Hour Lead Time to Onset of VFR Conditions at Core Airports
75%
Num
ber of Events/F
orecastsP
roba
bilit
y of
Det
ectio
n
2012 2013
18
TAF Lead Time - VFR Onset FAR
2-4 Hour Projection to Onset of VFR Conditions at the Core 30 Airports
25%
Num
ber of Events/F
orecastsF
alse
Ala
rm R
atio
2012 2013
19
TAF Lead Time - VFR Onset Timing Error
2-4 Hour Lead Time to Onset of VFR Conditions at Core Airports
30 min Num
ber of Events/F
orecastsT
imin
g E
rror
(m
inut
es)
2012 2013
20
TAF Lead Time - VFR Cessation POD
2-4 Hour Lead Time to Cessation of VFR Conditions at Core Airports
75%
Num
ber of Events/F
orecastsP
roba
bilit
y of
Det
ectio
n
2012 2013
21
TAF Lead Time - VFR Cessation FAR
2-4 Hour Projection to Cessation of VFR Conditions at the Core 30 Airports
25%
Num
ber of Events/F
orecastsF
alse
Ala
rm R
atio
2012 2013
22
TAF Lead Time - VFR Cessation Timing Error
Mean Absolute Timing Error: 2-4 Hour Lead Time to Cessation of VFR Conditions
30 min
Num
ber of Events/F
orecastsT
imin
g E
rror
(m
inut
es)
2012 2013
23
Summary
• Lead Time Accuracy Requirements– Decision process needs timing of Onset/Cessation of events
impacting TFM on scale of tens of minutes
• New Verification Method, Different than Traditional Method– Preliminary Flight Category verification results show significant gap
between accuracy baseline and decision process needs– TAF hourly time scale too coarse to meet need of TFM decisions– Model guidance time scale likely to lead to similar results
• Next Steps for Lead Time Assessment Tool– Wind Direction Changes, Thunderstorms, Model Guidance– Accessible on Performance Management Website– Training for Lead Time Verification Method and Results Interpretation