lean bim, martin brown @fairsnape
TRANSCRIPT
![Page 2: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/2.jpg)
Alfred Bosom 1934
Latham
Building Down Barriers
Egan, Rethinking Construction 1998
Accelerating Excellence
Be Valuable
Never waste a Good Crisis
CE Survival Guide
Construction Strategy 2011
Social Value Act 2012
PAS 1192
Construction Vision 2025
collaborative
working journey
![Page 3: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/3.jpg)
To produce the right product at the
right time in the right quantity for
the customer and to produce exactly
what you need and nothing more…
Lean Thinking
BIM Thinking
![Page 4: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/4.jpg)
"everything we do goes into everything we do"
HONDA
![Page 5: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/5.jpg)
“everything we do goes into … only 60% of what we do"
CONSTRUCTION
TypicalConstruction Project Footprint?
![Page 6: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/6.jpg)
compelling reasons for adopting
‘Lean BIM’and pre-requisites for
success
![Page 7: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/7.jpg)
BIM in conjunction with leanconstruction (ie Last Planner)can get Construction closerto Honda
“everything we do … goesinto everything we do”
![Page 8: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/8.jpg)
BIM, like lean constructionforces us to focus on endgame first, understandingclient value and pulling thatvalue through design andconstruction.
![Page 9: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/9.jpg)
BIM will drive lean andpredictable programmingand material sequencing.
![Page 10: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/10.jpg)
![Page 11: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/11.jpg)
![Page 12: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/12.jpg)
BIM will streamline thesupply value stream formaterials, enabling just intime supply, adding valuereducing waste and cost.
![Page 13: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/13.jpg)
BIM, like Last Plannercan reduce firefightingand stress on projectmanagement team.
![Page 14: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/14.jpg)
BIM will greatly assist inimproving information flowand communications,between project partnersand supply chain
![Page 15: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/15.jpg)
BIM and Lean constructionboth need committedleadership at organisationand at project level.
![Page 16: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/16.jpg)
Core processes (eg design and construction) need to be (re)shaped around Lean Thinking and BIM requirements.
![Page 17: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/17.jpg)
BIM is a people collaborationmindset requiring leanapproaches to ensure people(the last planner)involvement
![Page 18: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/18.jpg)
Early contractor and supplychain involvement withstrong collaborative culturemust be in place.
![Page 19: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/19.jpg)
“The construction aspects of projects is the easy bit - "a
doddle”
The harder, more complex bitis the collaborative working‘glue’ that surrounds thedesign, build and operationof the facility,
whether BIM is used or not”
![Page 20: Lean BIM, Martin Brown @fairsnape](https://reader031.vdocuments.net/reader031/viewer/2022032216/55a6b8831a28ab826b8b4671/html5/thumbnails/20.jpg)
Improving Construction is a monumental challenge
but now we have new tools we just need to use them!
BIM
Social Media
Restorative Sustainability
CircularEconomy
Image: http://www.squarewheels.com/
Lean