Lecture 7 Cooling water system design L07-1 Energy System Design Update

Author: ngoanh

Post on 28-Apr-2018

224 views

Category:

Documents


5 download

Embed Size (px)

TRANSCRIPT

  • Lecture 7

    Cooling water system design

    L07-1 Energy System Design Update

  • H2

    C1

    C2

    C

    C

    H

    H1

    HENRefrigeration

    Distillation

    Cooling Water Systems

    T2

    T3

    T1

    Effluent TemperatureReduction

    L07-2 Energy System Design Update

  • Research Focused on Cooling Tower Systems

    Cooling tower design

    Makeup minimisation

    Process interactions: refrigeration, air compression

    Environmental protections

    Cooling water treatement: fouling, corrosion, biological fouling

    L07-3 Energy System Design Update

  • Makeup Cooling waterBlowdown

    Recirculating water

    EvaporationDrift / Windage

    CoolingTower HEN

    Open re-circulating cooling water system

    ?HE 1

    HE 4

    HE 3

    HE 2

    ConstraintsCW network design

    &CT performance

    Process changes on cooling water system

    new HE

    Processchanges

    L07-4 Energy System Design Update

  • Design Problem of Cooling Systems

    HE 1

    HE 3

    HE 3

    HE 4

    Processchange

    Network Design ?

    Constraints

    Constraints

    Performance

    Target condition ?

    Return Hot CW

    Fresh CW

    L07-5 Energy System Design Update

  • CW Network

    new HE

    HE 1

    HE 3

    HE 2

    CT isBottlenecked

    HE 1

    HE 3

    HE 2

    HE 4

    Is an additional CT necessary ?

    Traditional Method for Debottlenecking

    Parallel Design

    L07-6 Energy System Design Update

  • Cooling Water System Model

    T1 = f (F2,T2,Fair,TWBT)

    F1 = f (F2,T2,Fair,TWBT)

    QHEN = F2 CP (T2 - T0)

    E = f (F2,T2,Fair,TWBT)

    B = ECC -1

    F0T0 = (F1 - B)T1 + MTM

    CC = CB FMCM FB

    = M = E CCCC -1

    F0 = F1 - B + M

    Cycles of concentration (CC)

    CT Model

    Makeup / blowdown

    Heat Load of HEN

    CWNetwork

    QHEN

    CT

    Makeup

    Evaporation

    B

    F2T2E

    M TM

    F1T1

    F0T0

    ColdBlowdown

    L07-7 Energy System Design Update

  • ( ) ( ) ( ){ }( )( ) ahdzdWGC

    dzdWTTCTTCGdzdTGCTTLPL

    OOLPLOGPAGSLi

    ++=

    Cooling Tower Model

    Water

    Ti

    L+dLTL+dTL

    GTG+dTGH+dHW+dW

    G,TGH,W

    dZAir

    LTL

    water

    z

    dz

    G2TG2H2W2

    L2TL2

    L1TL1

    G1TG1H1W1

    air

    Interface temperature (Ti)

    ( Details given in Kim and Smith, 2001, Chem. Eng. Sci. v.56(12) pp.3641-3658 )

    L07-8 Energy System Design Update

  • 24

    26

    28

    30

    32

    34

    36

    3436

    3840

    4244

    4648

    5052

    0.5

    1.0

    1.5

    2.0

    Wat

    er O

    utle

    t Tem

    pera

    ture

    Water

    Inlet Te

    mpera

    tureWater Inlet Flowrate

    Water Outlet Temp. vs Water Inlet Conditions[Merkel's Theory ]

    0.6

    0.7

    0.8

    0.9

    1.0

    3436

    3840

    4244

    4648

    50

    0.5

    1.0

    1.5

    2.0

    2.5

    Effe

    ctiv

    enes

    s

    Water Inlet Temperature

    Water

    Inlet F

    lowrate

    Effectiveness vs Water Inlet Conditions[ Merkel's Theory ]Water Outlet Temperature Effectiveness

    high temperature & low flowrate of inlet conditionshigher heat removal of CT can be obtained

    CT Modelling Result

    L07-9 Energy System Design Update

  • HE 1

    HE 2

    HE 1

    HE 2

    Parallel Series

    New Insights on Cooling Water Systems

    IncreaseCW return temperature

    DecreaseCW recirculation flowrate

    Heat removalof cooling tower

    is increased

    Series Arrangements

    Not all of cooling duties require CW at the CW supply temperature

    L07-10 Energy System Design Update

  • FeasibleRegion

    HotProcessStream

    Q

    T

    Tcw, inmax

    Tcw, outmax

    Tmin

    Tmin

    Limiting CoolingWater Profile

    55

    40

    20

    T( C)

    400 1400 3200 3400Q(kW)

    75

    200 1800 2400 3400Q(kW)

    T( C)

    Cooling WaterComposite Curve

    55

    40

    20

    75

    20

    Representation of Cooling Water Networks

    Targeting forMaximum Re-use

    Construction ofComposite Curve

    L07-11 Energy System Design Update

  • Q(kW)

    T( C)

    55

    40

    20

    75

    45.7 kW/ oC75 oC

    44.3 kW/ oC 40 oC

    90kW/ oC20 oC

    45.7 kW/ oC 40 oC

    1

    90kW/ oC20 oC

    45.7 kW/ oC75 oC

    45.7 kW/ oC40 oC

    Cooling Water Mains

    4

    3

    2

    44.3 kW/ oC40 oC

    0 kW/ oC75 oC

    0 kW/ oC20 oC

    Adaptation of Kuo and Smiths method for water system design( Trans. IChemE, vol 76, part A, March 1998, p 287 )

    L07-12 Energy System Design Update

  • Constraints on CW Return Temperature

    CW treatment problem limits the CW return temperature.

    Q

    T CW Composite Curve

    No Re-use

    Maximum Re-use

    Temperature limitation

    Maximum re-use does not guarantee the optimal condition.

    L07-13 Energy System Design Update

  • T

    New Pinch

    ModifiedCW composite

    Q

    With Pinch

    EnergyPenalty

    2.TemperatureShift

    T

    Q

    T

    Q

    1. Heat LoadShift

    CW Composite Curve Modification

    L07-14 Energy System Design Update

  • Q[kW]

    T[ C ]

    Feasibleregion

    for modification

    T[ C ]

    Q[kW]

    T*

    Increase CPTemperatureLimitation

    ModifiedOriginal

    Modified

    Original

    Q[kW]

    T[ C ]

    T*

    Tshift

    TemperatureShift

    Limiting CW Profile Modification

    IncreaseCP Tshift

    L07-15 Energy System Design Update

  • Air 732.24 t/h

    HE 1

    HE 2

    CW NetworkCT

    15.1 t/h

    Blowdown Makeup7.6 t/h 22.7 t/h

    732.24 t/h43.3 oC

    28.8 oC

    TDBT = 29.4 oCCycles of

    Concentration = 3

    Evaporation

    10 oC

    TWBT = 23.9 oC

    HE 4

    HE 3

    Base Case

    Debottlenecking Example

    Limiting Cooling Water Data

    2542.1

    488.9

    635.5

    52.7

    37

    36

    33

    4*

    2

    1640.22003728.81

    8166.6

    Q[kW]

    CP[kW/oC]

    Tcw, in[oC]

    HeatExchanger

    4835 3250250

    Tcw, out[oC]

    3

    - Tmin = 10 oC

    L07-16 Energy System Design Update

  • CW from CT

    Heat Load of HEN = 15.6 MW

    CoolingSystemModel

    HE 4

    HE 1

    HE 3

    HE 2

    Too Hot !

    Tin = 30.4 oC

    Tin = 28.8 oC

    CP = 1020.9 kW/oCTout = 44.1 oC

    Results of Parallel Design Method

    CW to CT

    CP = 1020.9 kW/oCTout = 44.1 oC

    CP = 1020.9 kW/oC

    Heat Removal ofCooling System = 14.6 MW

    L07-17 Energy System Design Update

  • Targeting of Cooling Systems for Debottlenecking

    Q

    CW Supply linefor Parallel Design[No Re-use]

    Cooling WaterComposite Curve

    T

    MaximumRe-use

    A

    B

    FeasibleCW Supply

    LineInitial

    condition Isothermal line ofcooling systemoutlet temperature

    C : Target condition

    CT water inlet flowrate

    A : Parallel design [no re-use]

    B : Maximum re-use

    Target (C)Heat removal of

    cooling water system

    Parallel(A)

    15.60 MW

    Case

    14.61 MW

    Max. re-use(B)

    15.69 MW

    L07-18 Energy System Design Update

  • T

    T*

    52.7 C

    35 C

    36 C

    48 C

    T

    37 C

    51.8 C

    34.1C

    37C

    47.1 C

    TemperatureShift

    PinchMigration

    35.1C

    Cooling Water Network Design Without a Pinch Pinch migration Limiting CW profile modification

    Q(MW)15.6

    50.3

    T( C)

    13.3

    28.8

    T* Tshift

    Targetsupply line

    Tshift = 0.9 oC

    L07-19 Energy System Design Update

  • 15.6

    Target CW Supply lineCP = 725 kW/oC

    28.8

    50.3 oC

    CW Composite Curve

    T( C) Modified CWCompositeCurve

    Q(MW)

    CW Network Design for Debottlenecking

    CP = 725 kW/oCTin = 28.8 oC

    Tout = 50.3oC

    CW from CT CW to CT

    CP =110.7

    HE1

    HE2

    HE4

    HE3CP =310

    CP =104.3

    CP =200

    CP =488.9

    CP = 68.2

    CP = 236.1

    L07-20 Energy System Design Update

  • New CW network design

    HE 1

    HE 3

    HE 2

    HE 4

    Parallel Design

    Debottlenecked Design of Cooling Systems

    CT capital cost penalty can be avoided

    HE1

    HE2

    HE4

    HE3

    L07-21 Energy System Design Update

  • HE1

    HE2

    HE4

    HE3

    New CW Network

    new HE

    HE 1

    HE 3

    HE 2

    Minimise penalty oncooling water system

    Cooling water pinch analysis

    Process changesof cooling system

    Summary Retrofit analysis gives design guidelines for debottlenecking

    of cooling water systems.

    L07-22 Energy System Design Update

  • Working Session 7Cooling water system design

    WS07-1 Energy System Design Update

  • Evaporation

    CW NetworkBlowdown Makeup

    623.4 t/h

    50.3 oC

    28.8 oC

    Cycles ofConcentration = 3

    HE1

    HE2

    HE4

    HE3

    Too High !

    CT

    Previous problem....

    Temperature limitation [47 oC] to CW return temperature

    WS07-2 Energy System Design Update

    Air 732.24 t/h

    TDBT = 29.4 oCHumidity = 0.0165

  • Q(kW) 15599

    CW Supply linefor Parallel Design

    28.8

    44.1 oC

    47 oCCooling WaterComposite Curve

    TemperatureConstraint

    T( C)

    Task 1:

    1. Calculate new cooling water supply conditions with temperature constraint to the return temperature.

    2. Fill the Answer 1

    New conditions of CW supply to CT

    Flowrate [t/h]

    Temperature [oC]

    Flowrate [kW / oC]

    47

    Answer 1:

    WS07-3 Energy System Design Update

    * Assume that the heat capacity of cooling water is 4.2 kJ/kg oC.

  • Task 2 :

    1. Open the file WS07.exe

    2. Input the CW supply conditions with temperature constraint

    input parameters

    Air flowrate : 732.24 t/hAir temperature : 29.4 oCAir humidity : 0.0165 kg water / kg airNumber of cycles: 3First assumption of CT water outlet temperature : 32 oC

    3. Check cooling water exit conditions with new supply conditions and fill the Answer 2

    WS07-4 Energy System Design Update

  • Target conditions

    Heat removal of CT [kW]

    47

    Answer 2 :

    CW exit temp. from CT[oC]

    50.3

    15599

    28.8

    CW inlet temp. to CT[oC]

    New conditions

    WS07-5 Energy System Design Update

  • 2. Air heat exchanger

    Heat load distribution

    Change of CT operating conditions

    New Design Option

    Increase the air flowrate of cooling tower

    decrease the temperature of hot return cooling water

    decrease the flowrate of hot return cooling water1. Hot blowdown extraction

    WS07-6 Energy System Design Update

  • CWNetworkColdBlowdown

    Makeup

    QAHEEvaporation T2

    F2

    T1F1AHE

    Flowrate beforeand after AHE

    doesnt change.

    T1 > T2

    T = T1-T2

    CT

    Now, we consider the case for the introduction of AHE

    CoolingSystemModel

    CPCT,in = 857.1 kW/oCTCT,in = ?

    TCW,IN = 28.8 oC

    Find a CT inlet temperature

    F2 = F1

    WS07-7 Energy System Design Update

  • Task 3 :

    1. Open the file WS07.exe

    2. Input different CW supply conditions with reduced temperature less than 47 oC and same CW flowrate

    3. Check CW exit conditions with new supply conditions and fill the Answer 3

    4. Find the target temperature of CW supply to CT when AHE is introduced. And, calculate the required heat removal of AHE

    WS07-8 Energy System Design Update

  • Answer 3 :

    Temp. of CWsupply to CT [oC]

    47

    ::

    Heat removal ofAHE [kW]

    46

    45

    ::

    ::

    Temp. of CWexit from CT [oC]

    0

    45

    28.8Target ? Target ?

    WS07-9 Energy System Design Update

  • CWNetwork

    Design with Air Heat Exchanger

    734.65 t/h

    28.8 oC

    ? oCAHE

    47 oC

    QAHE = ? MW

    QCWN =15.6 MW

    CT

    WS07-10 Energy System Design Update

  • Working Session 7Solution

    SOL07-1 Energy System Design Update

  • Q(kW) 15599

    CW Supply linefor Parallel Design

    28.8

    44.1 oC

    47 oCCooling WaterComposite Curve

    TemperatureConstraint

    T( C)

    New conditions of CW supply to CT

    Flowrate [t/h]

    Temperature [oC]

    Flowrate [kW / oC]

    47

    Answer 1:

    SOL07-2 Energy System Design Update

    857.09

    734.65

  • Target conditions

    Heat removal of CT [kW]

    29.256

    With 47 oC return temperature conditions,the cooling systems cannot satisfy the desired heat removal andCW exit temperature.

    CW exit temp. from CT[oC]

    50.3

    15208 kW = (47 oC - 29.256 oC) X (857.09 kW/oC)

    28.8

    CW inlet temp. to CT[oC]

    New conditions

    SOL07-3 Energy System Design Update

    47

    15599 15208

    Answer 2 :

  • Answer 3 :

    Temp. of CWsupply to CT [oC]

    47

    ::

    Heat removal ofAHE [kW]

    46

    45

    ::

    ::

    Temp. of CWexit from CT [oC]

    0

    43.2 28.8

    Target conditions

    SOL07-4 Energy System Design Update

    29.256

    29.033

    3256.94

    45

    29.145 857.09

    1714.18

    3256.94 kW = (47 oC - 43.2 oC) X (857.09 kW/oC)

  • CWNetwork

    Design with Air Heat Exchanger

    734.65 t/h

    28.8 oC

    43.2 oCAHE

    47 oC

    QAHE = 3.26 MW

    QCWN =15.6 MW

    CT

    SOL07-5 Energy System Design Update

    Air heat exchanger with the capacity of 3.26 MWis required for heat load distribution.