led panel installation guide ceiling mount frame

3
www.sgslight.com | [email protected] CEILING MOUNTED FRAME For TLP-X/F/M/A/E Series Risk of Fire. Do not install insulation within 3 inches (76 mm) of luminaire top. Risques d’ incendie. Ne pas installer d’isolation à moins de 76 mm (3 pouces)au-dessus du luminaire. Do not perforate the integrity of the luminaire. Only screw into the threaded mounting bracket holes located at the four corners of the fixture. Environmental Operating Temperature Range Environmental Rating Environmental Storage Temperature Range -10°C to +40°C -40°C to +60°C Refer to for more lamp electronical data info. WARNING/AVERTISSEMEN CAUTION TLP Series LED Panel Specification Dry location rated IN

Upload: rollin-zhao

Post on 16-Aug-2015

101 views

Category:

Technology


1 download

TRANSCRIPT

www.sgslight.com | [email protected]

CEILING MOUNTED FRAMEFor TLP-X/F/M/A/E Series

Risk of Fire. Do not install insulation within 3 inches (76 mm) of luminaire top.Risques d’incendie. Ne pas installer d’isolation à moins de 76 mm (3 pouces)au-dessus du luminaire.

Do not perforate the integrity of the luminaire. Only screw into the threaded mounting bracket holes located at the four corners of the fixture.

Environmental Operating Temperature RangeEnvironmental RatingEnvironmental Storage Temperature Range

-10°C to +40°C

-40°C to +60°C

Refer to for more lamp electronical data info.

WARNING/AVERTISSEMEN

CAUTION

TLP Series LED Panel Specification

Dry location rated

IN

www.sgslight.com | [email protected]

CEILING MOUNTED FRAME KITS

TLP- CL3030 TLP-CL3060

TLP- CL6060 TLP- CL6262

TLP- CL3012

TLP- CL6012

TLP- CL3030 TLP-CL3060

TLP- CL6060 TLP- CL6262

TLP- CL3012

TLP- CL6012

Frame A

Frame B

X 2 X 2

X 2 X 2

X 8 X 8

X 4 X 6

Fix the two ‘A’ frames together with one ‘B’ frame.

Slide the LED Panel in to the frame.

Identify the two frame types as illustrated above (Type A and B).

1 2

Frame B

Frame A

Frame A

1

Mount the frame to the ceiling.3 4

Ceiling

Frame A Frame B

Items Items

TLP-FDJ2

INSTALLATION STEPS

www.sgslight.com | [email protected]

Insert the other ‘B’ frame on to the ends of the ‘A’ frames.

5 Fix the ‘B’ frame with the screws supplied.

Frame B

AC100-240V4

6

AC100-240V4