RES-Electricity Directive 2001: 2010 Target: 21% for RES-Electricity in total EU electricity consumption; National indicative target: Member State must take appropriate steps to encourage greater consumption of RES-Electricity (usually through support schemes).TRANSCRIPT
![Page 1: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/1.jpg)
Legal Aspects of SolarInvestments in CEE-SEE
Bryan Jardine, Partner, Wolf Theiss Bucharest
![Page 2: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/2.jpg)
2
TOPI
CS
1. Renewable Energy in CEE-SEE2. Main legal aspects of Solar PV
projects in CEE-SEE3. Wolf Theiss RES-Electricity Guide
![Page 3: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/3.jpg)
3
CEE-SEE: European Union and Energy Community
• Countries in CEE-SEE• Two main communities regarding Energy:
–European Union–Energy Community
![Page 4: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/4.jpg)
4
European Union
• RES-Electricity Directive 2001–2010 Target: 21% for RES-Electricity in total EU
electricity consumption–National indicative target: Member State must take
appropriate steps to encourage greater consumption of RES-Electricity (usually through support schemes)
![Page 5: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/5.jpg)
5
European Union (Continued)
• Renewable Energy Directive (in force from June 2009)• Climate-Energy Package: 20-20 in 2020
–Mandatory national targets for overall share of renewable energy in gross final consumption of energy, and for share of renewable energy in transport
–Rules for statistical transfers, joint projects, and access to the electricity grid for renewable energy
![Page 6: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/6.jpg)
6
Energy Community
• Athens Treaty of October 2005• Implementation of acquis communautaire for renewables• Contracting Parties: European Union, Albania, Bosnia and
Herzegovina, Croatia, Macedonia, Montenegro, Serbia and Kosovo
• Each member has now adopted targets for implementation of acquis communautaire for renewables (mainly RES-Electricity and Transport)
![Page 7: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/7.jpg)
7
Solar Photovoltaic Energy
• Fastest growing renewable energy technology• Cost is a major factor limiting growth BUT costs
decreasing with current rapid technological advancements and volume installations
• Paradigm Shift Scenario: PV electricity could provide up to 12% of EU electricity demand by 2020
Source: European Photovoltaic Industry Association
![Page 8: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/8.jpg)
8
Attractive Feed-In Tariffs
• Czech Republic: 20 year tariff of 465 €/MWh (installed capacity above 30 kW) or 469 €/MWh (installed capacity below 30 kW)
• Slovak Republic: 15 year tariff of 425.12 €/MWh (installed capacity above 100kW) or 430.72 €/MWh (installed capacity below 100kW)
• Bulgaria: 25 year tariff of 386 €/MWh (installed capacity above 5 kW) or 421 €/MWh (installed capacity below 5 kW)
![Page 9: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/9.jpg)
9
Attractive Feed-In Tariffs (Continued)
• Slovenia: - On-ground: 15 year tariff of 290 €/MWh (installed
capacity above 1MW but below 5MW), 359 €/MWh (installed capacity below 1MW) or 390 €/MWh (installed capacity below 50 kW)
- Building-Integrated: 15 year tariff of 362 €/MWh (installed capacity above 1MW but below 5MW), 437 €/MWh (installed capacity below 1MW) or 478 €/MWh (installed capacity below 50 kW)
![Page 10: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/10.jpg)
10
Legal/Regulatory Uncertainties • Czech Republic
- Parliamentary Bill to remove 5% protection in some cases- Regulator: feed-in tariffs for solar PV will drop by 30% in
2011 - Distribution System Operators: suspension of all new
applications to reserve grid capacity for solar PV and wind• Slovak Republic
- Transmission System Operator: 120 MW aggregate cap for solar PV projects above 1MW reached in Dec 2009
![Page 11: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/11.jpg)
11
Legal/Regulatory Uncertainties (Continued)
• Bulgaria- No year-on-year guarantee of amount of tariff- Conflicting Ministerial declaration regarding the future of
renewables- Indications that tariff will be reduced, but year-on-year guarantee
will be introduced
• Slovenia- Fixed and variable parts in feed-in tariff, although currently for
solar PV variable part is not significant
![Page 12: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/12.jpg)
12
Important Land-Related FactorsRough example: To generate 5000 MWh from a 5MWp solar PV installation, 15-20 hectares of land will be required
![Page 13: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/13.jpg)
13
Land-Related Legal Issues
• Large plots in State ownership- Lack of overall planning regarding use of State-owned
land- Uncertainty regarding competent authority- Uncertainty regarding whether secure rights can be
granted over State-owned land
![Page 14: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/14.jpg)
14
Land-Related Legal Issues (Continued)
• Privately-owned land- Land registry either inexistent or out-of-date- Heritage from communist era: large plots parcelled- Unclaimed plots: cumbersome appropriation process
• Effect on landscape and wildlife: Strong objections from environmentalists during permitting process
• Hope: Increase in module efficiency will bring savings in land-related factors (less hectares for similar MWp)
![Page 15: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/15.jpg)
15
For other regulatory aspects, ask:
Horst Ebhardt Andreas Schmid
Jacques IsabelleRon Given
Bryan Jardine Zoltán Faludi
![Page 16: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/16.jpg)
16
Or refer to:
14 jurisdictions covered:
European Union: Austria, Bulgaria, Czech Republic, Hungary, Romania, Slovak Republic, and Slovenia
Energy Community: Albania, Bosnia & Herzegovina, Croatia, Kosovo, Macedonia, Serbia and Ukraine
![Page 17: Legal Aspects of Solar Investments in CEE-SEE](https://reader035.vdocuments.net/reader035/viewer/2022070506/568c53381a28ab4916b9e019/html5/thumbnails/17.jpg)
17
Wolf Theiss RES-Electricity Guide
• Building Permits, Environmental Permits and Environmental Impact Assessments
• Energy Permits, Concessions, and Tender Proceedings• RES-Electricity Promotion Schemes• Financial Incentives Guarantees of Origin, Grid
Connection Issues, and Carbon Credits