Legal considerations – from spreadsheet to deployment legal implications Maria Connolly Head of Real Estate and Energy & Renewables, TLT
TLT LLP TLT LLP
Energy storage: overview of current activity
! EFR (4 years) / FFR
! Capacity Market auction (up to 15 years)
! Standalone
! Co-location alongside existing installations
! Co-location alongside proposed installations
! Behind the meter
Capacity market auction - December 2016
1.5 GW pre-qualified battery storage projects 501 MW battery storage projects awarded contracts
TLT LLP TLT LLP
National Grid: EFR / Capacity Market
! 200 MW of EFR contracts awarded across eight projects
! Provisional Capacity Market auction results – aprox 500 MW of battery storage projects have been awarded 15 year contracts
! Over 1.4 GW of Demand Side Response projects received one year contracts
! Clear indication of the crucial role battery storage will play in the future of the national grid
TLT LLP TLT LLP
Project Structures
! Option Agreement
! Form of lease (or transfer if acquiring freehold)
! Title due diligence
! Negotiation of key documents with suppliers
! Corporate structuring
! Tax structuring
! Fundraising - debt v equity
TLT LLP TLT LLP
Standalone
! Number of sites received planning with plenty more in pipeline
! Greenfield and brownfield sites as well as conversion of solar option agreements for storage
! Life after 1.2 ROC solar projects that aren’t built out
! New grid connections
! Capacity Market
TLT LLP TLT LLP
Co-location
! Existing project structure:
! Ownership ! Funding constraints ! Do sufficient rights exist for storage?
! Shared grid connections and other infrastructure
! Mitigating risks arising from a temporary loss (de-energisation) of the shared connection
! Termination of arrangement
TLT LLP TLT LLP
Behind the meter
! Benefits: arbitrage, connection costs, Triad avoidance, uninterruptable power supply.
! Revenue streams: ancillary services to the National Grid
! The challenges:
! Storage doesn’t fit within current UK legislative & regulatory framework ! Potential for double charging of system uses charges ! Is planning permission required? ! Lack of current health & safety standards ! Issues where BTM storage is connected to a constrained network ! If BTM is co-located, this can impact on renewable incentives ! Short term nature of ancillary services contracts
TLT LLP TLT LLP
Co-ordinating revenue schemes
! Complex rules for each revenue stream – how will they interact with each other?
! Capacity Market agreements can be held with FFR contracts ! Conflicts require prioritisation of FFR over the Capacity Market obligation ! EFR and FFR contracts cannot be held simultaneously if there is any
overlap between the contracted delivery times
! Overlapping deliverables need to be reviewed carefully to identify potential conflicts
! The CM Rules “may” be amended to allow for the provision of EFR ahead of the next Capacity Market prequalifying round
! Ofgem will notify the market of it’s decision Spring 2017
TLT LLP TLT LLP
Co-ordinating revenue schemes cont…
! Procurement timing
! Contracts are procured at different times and for different periods of time, making it difficult to line-up different revenue streams.
! Wider system co-ordination risks
! Will services procured by National Grid be consistent with services procured by DNOs?
TLT LLP TLT LLP
Structuring projects
! Legal structure can provide revenue certainty
! Contracted payments can provide core revenue certainty ! Risk of construction and delivery penalties can be backed-off against
EPC and O&M contracts
BUT
! Wider risk of uncertainty
! New revenue schemes relatively immature ! New revenue schemes are still reacting to market changes ! Future changes could impact on eligibility and / or competitiveness
TLT LLP
Conclusion ! Secure land rights (and prior exclusivity) ! Careful legal structuring around co-location projects ! National Grid tender requirements ! Capacity Market auction ! Increased activity in Scotland, NI and ROI ! Future proof project documents for funding (and sale)
Maria Connolly Head of Real Estate and Energy & Renewables, TLT [email protected] Direct Dial: 0333 00 60109 Mobile: 07909 967322