    Er. Theresa LiewOccupational Safety and Health Division

    23 Sep 2010

    Legal Requirements on Lifting Operation

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    2/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    2

    Presentation Overview

    1. Tower Cranes Accidents

    2. Reminders on Legislation Compliance

    3. Key WSH Act Subsidiary Legislation on LiftingOperation at Worksites

    4. Some Proposed Changes to Legislation

    OSHD Building Safer Workplaces

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    3/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    3

    Recent Events

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    4/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    4

    Recent Events

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    5/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    5

    Chairman

    Mr Tan Wee Seng

    (CEO, Bovis Lend Lease Pte Ltd)

    Member

    Mr Chan Yew Kwong

    (MOM)

    Member

    Mr Albert Chan

    (Liebherr-Spore pte ltd)

    Member

    Mr Wilfred Tan

    (Tiong Woon Crane & Transport)

    Member

    Mr Frankie Tan

    (SCA)

    Member

    Mr Chiang Soon Hock

    (ASMI)

    Member

    Mr Neo Choon Keong

    (BCA)

    Member

    Mr John Stewart

    (Manitowoc Cranes)

    5

    NCSTF Secretariat

    (IS&D)

    Member

    Mr Mohd Ismadi

    (MOM)

    Member

    Mr Yeo Kim Hock

    (SCAL)

    Ma

    inTaskforce

    National Crane Safety Taskforce

    Enhance

    Capability & Competency

    Enhance Awareness

    Enhance Legislation

    & Standards

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    6/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    6

    5 workers were in the

    process of dismantling a

    tower crane from a

    height of 16 stories

    During preparatory

    works for jacking down,

    the crane jib section with

    its slewing unit toppled

    to the ground

    One erector fell together

    with the crane jib section

    & died at the scene. 3

    others were injured.

    CRANE TOPPLES, KILLED WORKER

    ON 17 MAR 2010

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    7/36 2010 Government of Singapore

    A Great Workforce A Great Workplace

    7

    SCENE OF THE ACCIDENT

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    8/36 2010 Government of Singapore

    A Great Workforce A Great Workplace

    8

    SCENE OF THE ACCIDENT

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    9/36 2010 Government of Singapore

    A Great Workforce A Great Workplace

    9

    SCENE OF THE ACCIDENT

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    10/36 2010 Government of Singapore

    A Great Workforce A Great Workplace

    10

    5 workers were installing a trolley

    platform to the jacking cage of tower

    crane to prepare for jacking up of

    crane.

    Trolley platform was being hoisted intoposition when it hit the adjacent work

    platform with a worker on it.

    Work platform became dislodged and

    fell 55m to the ground with the worker.

    The worker fortunately landed on a

    waste plastic bin which cushioned his

    fall. He survived the accident and is

    undergoing treatment for his injuries.

    COLLAPSE OF JACKNG CAGES WORK PLATFORM

    ON 13 APR 2010

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    11/36 2010 Government of Singapore

    A Great Workforce A Great Workplace

    11

    Dislodged work platform was not interconnected to

    the other two remaining platforms in accordance

    with manufacturers instructions.

    Investigation Findings

    Trolley platform at anotherworksite for illustration

    SCENE OF THE ACCIDENT

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    12/36 2010 Government of Singapore

    A Great Workforce A Great Workplace

    12

    Only Approved Crane Contractors are allowed to perform any

    erection, jumping/jacking & dismantling of Cranes

    Adequate Risk Assessment must be carried out prior to the

    commencement of work

    Risks & SWP must be communicated to all involved Must be carried out in accordance with manufacturers instructions

    as provided in the manufacturers manuals

    Must be carried out only by competent erectors under the direct

    supervision of a competent supervisor. Other works and vicinity at affected areas must be no-entry zone

    Components used for erection of tower crane must be

    original/approved by manufacturers

    Reduce risk by having designated jacking cage for tower crane

    Legislation Compliance on Cranes Erection,

    Alteration & Dismantling Work

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    13/36 2010 Government of Singapore

    A Great Workforce A Great Workplace

    13

    In accordance to the Notification for Use of Tower Cranes, all

    bolts/pins or connecting fasteners used must be in

    accordance to manufacturers design and readily identifiable.

    Connections for Mast Sections

    Recent IncidentsSalient Results & Findings

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    14/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    14

    Expendable Foundation Anchors of Tower

    Crane must not be re-cycled as in accordance

    tomanufacturers

    instruction.

    Foundation Anchors

    Recap of Past DirectivesFrom Past Incidents

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    15/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    15

    Other Key WSH Subsidiary

    Legislation on Lifting Operation

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    16/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    16

    Regulation 10

    3D

    Type of Work that requires PTWS (High-risk

    Construction Work - HRCW)

    Demolition work;

    Excavation and trenching work in a tunnel or hole exceeding 1.5m in depth;

    Lifting operations involving tower, mobile or crawler crane;

    Piling work;

    Tunneling work;

    Work on a Scaffold where a person could fall > 2m; and

    Work involving entry into a confined space.

    Any person who carries out any of the said work without a PTW issued shall

    be guilty of an offence

    Fine $20,000 (max)

    WSH (Construction) Regulations 2007 - PTW

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    17/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    17

    Identifying work risks Ensuring work is allowed to commence only

    after the hazardous work environment andcondition have been adequately assesses

    and certified safe.

    In line with the RA framework as it validatesthe implementation of control measures

    Part III

    3D Implementing Permit-to-work System for select high-risk construction work (HRCW)

    A proven and systematic method of

    WSH (Construction) Regulations 2007

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    18/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    18

    HRCW must be carried out

    with due regard to safety and

    health of persons performingthe work

    Persons are informed of the

    hazards associated with the

    HRCW and precautions to be

    taken

    Necessary safety precautions

    taken and enforced when the

    Implementing PTWSThe PTW shall provide that:

    Step 1 - Application

    Step 2 - Evaluation

    Step 3 - Issue

    Step 4 - Posting

    Monitoring

    Imp

    lementingPTWS

    Regulation 11

    WSH (Construction) Regulations 2007 - PTW

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    19/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    19

    Appoint a Project manager

    Appoint a Safety Assessor (who shall be either aWSHO for the worksite or a competent person);

    Take so far as is reasonably practicable measuresto ensure PTWS is implemented in accordancewith regulations

    Regulation 11

    Duty of Occupier to:

    Implementing PTWS

    WSH (Construction) Regulations 2007 - PTW

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    20/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    20

    Made by Supervisor of person carrying out HRCW

    Made in such form and manner as required byProject Manager

    State measures to be taken to ensure safety andhealth or persons carrying out HRCW

    Addressed to Project Manager and submitted toSafety Assessor for Evaluation and Endorsement

    Step 1 Application of PTW

    Regulation 13

    WSH (Construction) Regulations 2007 - PTW

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    21/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    21

    Assess or evaluate whether all reasonably practicablemeasures have been taken to ensure safety and health ofpersons who will be carrying out HRCW

    Inspect site where HRCW is to be carried out with Supervisor

    If Safety Assessor is satisfied that HRCW can be carried out

    safely, he shall endorse PTW and forward to Project Managerfor approval

    Duty ofSafety Assessor to exercise due diligence whenperforming his functions in relation to evaluation and

    endorsement of PTW

    Step 2 Evaluation of PTW

    Regulation 14

    On receipt of PTW, the Safety Assessor shall:

    WSH (Construction) Regulations 2007 - PTW

    f

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    22/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    22

    Proper evaluation of the risks and hazards involved based on

    available information No incompatible work carried out at the same time and in

    same vicinity

    All reasonably practicable measures will or have been taken

    All persons involved are informed of the associated hazards Duty ofProject Manager to exercise due diligence when

    performing his function in relation to issuance of PTW

    Step 3 Issuance of PTW

    Regulation 15

    On receipt of endorsed PTW, the Project Manager may issuePTW if he is satisfied that:

    WSH (Construction) Regulations 2007 - PTW

    A G W kf A G W k l

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    23/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    23

    Clearly post a copy of PTW issued including,where practicable, a sketch of the areawhere the HRCW is permitted

    Ensure that copy of PTW not removed until

    date of expiry / revocation of PTW or on

    completion of HRCW

    Step 4 Posting of PTW

    Regulation 16

    After issuance of PTW, Duty of Supervisor to:

    WSH (Construction) Regulations 2007 - PTW

    A G t W kf A G t W k l

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    24/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    24

    AE test and examination

    LM to be tested and examined by AE at least once a year (or

    as determined by Commissioner)

    Certificate of test and examination by AE to kept available forinspection

    [GP]

    Brake

    Crane provided with readily accessible and efficient brake (or

    other safety device for that purpose)

    [GP]

    WSH (GP) Regulations: Requirement on LM

    A G t W kf A G t W k l

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    25/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    25 All Rights Reserved

    LIFTING SUPERVISOR

    has successfully completed a training course approved by

    the Commissioner; and

    has, in the opinion of the occupier, such relevantexperience in lifting operations for at least one year.

    RIGGER & SIGNALMAN

    No person shall be appointed as a RIGGER/SIGNALMAN

    unless he has successfully completed a training course

    approved by the Commissioner

    Factories (OOC) Regulations: Appointment of Personnel by Occupier

    A G t W kf A G t W k lR i i f C O

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    26/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    26

    Registration of Crane Operator

    No person shall operate a mobile crane or tower crane in a

    factory unless he is registered as a crane operator under these

    Regulations and is the holder of a valid certificate.

    No person shall employ or cause or permit any person who isnot registered as a crane operator under these Regulations to

    operate a mobile crane or tower crane in a factoryNote:

    a) To drive a mobile crane - must have the relevant driving license

    b) To operate a mobile crane must be registered crane operatorc) Lorry loader operator not required to be registered if purpose is

    mainly to transport materials or goods. However, operator must

    still be trained and competent to operate lorry crane safety.

    (Proposed mandatory training for such operators)

    Factories (OOC) Regulations: Registration of Crane Operator

    A Great Workforce A Great Workplace

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    27/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    27

    (a) co-ordinate all lifting activities;

    (b) ensure that only registered crane operators, appointed riggers and appointed

    signalmen participate in any lifting operation involving the use of a mobile crane or a

    tower crane;

    (c) ensure that the ground conditions are safe for any lifting operation to be performed by

    any mobile crane;

    (d) unless he is present to supervise a lifting operation, ensure that there is a set

    ofsafe lifting procedures for any lifting operation by a mobile crane or a

    tower crane;

    (e) briefall crane operators, riggers and signalmen on the safe lifting procedures referred toin sub-paragraph (d); and

    (f) if any unsatisfactory or unsafe conditions are reported to him by any crane operator or

    rigger, take such measures to rectify the unsatisfactory or unsafe condition or

    otherwise ensure that any lifting operation is carried out safely.

    (Proposed Change - Lifting Supervisor to supervise in accordance to Lifting Plan)

    Factories (OOC) Regulations: Duty of Lifting Supervisor

    A Great Workforce A Great Workplace

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    28/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    28 All Rights Reserved

    Duty of Crane Operator

    LS is present or has approved the carrying out of such

    operation

    weight of the object is known (indicated in the LiftingPlan/PTW);

    he has received a clear signal from a signalman (whenrequired)

    No lifting unless

    A Great Workforce A Great Workplace

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    29/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    29 All Rights Reserved

    List of Relevant Approved Codes by WSH Council

    for Lifting Operation

    SS536 : CP for the safe use of mobile cranes

    CP 62 : CP for the safe use of tower cranes

    CP 63 : CP for the lifting of persons in work

    platforms suspended from cranes

    A Great Workforce A Great Workplace

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    30/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    30

    News ReportsA lorry crane was involved in a tree

    pruning operation.A 33-year-old foreign worker from

    the landscape management

    company, which owns the tree-

    pruning vehicle, was arrested for

    causing death by negligence.

    A Great Workforce A Great Workplace

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    31/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    31

    Intervention 1 Launch of Joint Ops

    Woodpecker on 28 July A Joint Ops codenamed Operation

    Woodpecker conducted on 28 July

    10 by MOM, LTA, NParks and HDB

    Ops covered 15 worksites on publicroads island-wide

    Ops aimed to reinforce safety

    guidelines for works on public roads

    and to allow the participatingagencies to garner sense of the level

    of safety awareness and compliance

    to safety standards

    A Great Workforce A Great Workplace

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    32/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    32

    Findings of Joint Ops Woodpecker

    on 28 July 2010 Workers carrying out tree-pruning activities in man-bucket

    were provided with necessary safety equipment (eg safety

    harness, safety gloves, glasses etc).

    All the lorry crane operators checked had undergone either a

    structured training course or OJT.

    Operators had also extended the outriggers of the lorry cranes

    to ensure stability.

    Contractors were generally aware of the need to demarcate the

    work zone through the placement of appropriate cones,

    barriers and warning signages, as stipulated in LTA's Code of

    Practices for Traffic Control at Work Zone. However there

    were sites inspected where the cones, barriers were found to

    have been placed too close to the work area.

    Some sites inspected did not conduct RA implement a PTW for

    lifting operations involving lorry cranes.

    A Great Workforce A Great Workplace

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    33/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    33

    Issuance of Technical Circular on SWP for Operating

    Lorry Cranes on Public Roads

    Circular intended to remind

    employers on common hazards

    involved in such works and

    preventive measures which included

    the following:

    Risks due to Traffic Movement

    Risks involved in Operation of

    Lorry Cranes Risks due to Working at Heights

    Risks due to Contact with

    Overhead Cables and Structures

    A Great Workforce A Great Workplace

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    34/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    34

    Compliance Assistance

    Code of Practice Traffic Controland Road Safety by LTA

    WSH Guidelines for Landscape

    and horticulture Works byWSHC and CUGE

    Technical Advisories for Safe

    Operation of Lifting Equipment

    A Great Workforce A Great Workplace

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    35/36

    2010 Government of Singapore

    A Great Workforce A Great Workplace

    35

    Some Proposed Changes to Legislation

    Proposed mandatory training &competency certification for Lorry Crane

    Operators

    Lifting Supervisor to supervise lifting

    operation in accordance to Lifting Plan Effected through review of Factories

    OOC Regulations by Sep 2011

    Development of Training Curriculum for

    Lorry Crane Operators is on way

    Development of ACOP for Lifting

    Operation under way

    A Great Workforce A Great Workplace

    Final thought

  • 7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010

    36/36

    A Great Workforce A Great Workplace

    ThankYou