About Us

• Legend Power Systems Corp.:– Founded in 2001– Completed R&D and beta trials on our globally

patented Harmonizer-AVR in January 2009 – Began formal sales and marketing in October 2009– A public company on the TSX Venture exchange (LPS-V)

and Frankfurt exchange (FSE : XLE)– AGF Financial is one of our major share holders

Page 3: Legend Power   Overview 97 2003 120410 1256 Do

Board of Directors

• Founding CEO of the Ontario Power Authority and PhD in Electric Power Systems - Dr. Jan Carr

• Former President/CEO, BC Hydro and BC Transmission Corporation - Michael Costello

• P. Eng, UBC Associate Professor, Electrical Engineering & Power Electronics - Dr. William Dunford

Page 4: Legend Power   Overview 97 2003 120410 1256 Do

Clients Include

• Sacramento Municipal Utility District• Honda • IKEA (see IKEA’s PR Manager’s testimonial on YouTube

http://www.youtube.com/watch?v=MZ4cfrO52Tk )

• The Canadian Postal Service• BC Hydro (see BCH’s VP Sustainability’s testimonial on YouTube

http://www.youtube.com/watch?v=GPysE6yM6Cg )

• Vancouver’s Science World (see Science World’s President’s testimonial on YouTube http://www.youtube.com/watch?v=J999g4t12G0 )

Page 5: Legend Power   Overview 97 2003 120410 1256 Do

What We Are NOT• Black Box• Power Factor Correction• Harmonics Filter or Transients• Capacitor Banks• Surge Suppression• Phase Balancing

We offer incremental savings to any conservation realized by these technologies

Page 6: Legend Power   Overview 97 2003 120410 1256 Do

The Problem: Forced Consumption

Line Loss Resistance:– facilities near the beginning of the grid receive voltage at a higher

level than needed and waste energy– Over $1 billion is wasted per year by commercial buildings due to

forced grid consumption

126Volts 114 Volts

Page 7: Legend Power   Overview 97 2003 120410 1256 Do

Solution: Electrical Harmonizer-AVR

• Voltage Optimization reduces electrical energy consumption by up to 12%. – Reduce Energy Cost– Reduce GHG emissions

Electrical Harmonizer - AVR

126 Volts

114 Volts

Power Generation

Power Distribution Customer

Voltage Optimization

Page 8: Legend Power   Overview 97 2003 120410 1256 Do

Building Pre-Qualification

• 1,500 MWh annual electrical energy consumption

• 60+ hours of operation per week

• High voltage; 600+ volts (480+ / 400+)

• Unregulated Loads

Page 9: Legend Power   Overview 97 2003 120410 1256 Do

EffectAdjusted to stay within normal voltage range. Minimum of 110v -114v utilization

• Power Consumption is reduced… – Incandescent & Halogen 7% - 13%

– fluorescent lights T8, T12, CFL: 5% - 10 %

– Metal Halide: 6% – 10%

– High Pressure Sodium: 7% - 12%

– Air Conditioning 2% – 6%

– Office Equipment 2% - 5% (Regulation Dependant)

– Refrigeration Equipment 2% – 6%

– Motors 2% - 6% (Duty dependent)

Voltage optimization allows the lighting output (lumens) to remain within manufacturer’s optimum specifications

Page 10: Legend Power   Overview 97 2003 120410 1256 Do

Benefits• Reduce annual energy bill up to 12%• Reduce peak power, saving penalties and

charges• No disruption to facility operations• Equipment replacement savings

– Tube/bulb life + 100%-300%– Ballast life– Maintenance cost

Page 11: Legend Power   Overview 97 2003 120410 1256 Do

Benefits• Reduce the garbage caused by replacement

bulbs etc.• Reduce the building’s carbon foot print• Aprox. 36 mth Payback on 120 mth

Maintenance Free Life• No tubes/bulbs to pay for

• No ballasts to replace

Page 12: Legend Power   Overview 97 2003 120410 1256 Do

Benefits

Device 

TempBefore

TempAfter

TempReduction

Switch Rm.#2 - T12 Lamp 33°C 30°C 9%

Switch Rm.#3 – T12 Ballast 45°C 40°C 11%

Switch Rm.#4 – Air Mover Motor 46°C 30°C 35%

Switch Rm. #2 - Transformer 65°C 55°C 15%

Mech. Rm. #8 – Ventilation Motor 49°C 43°C 12%

Corridor #5 - Compressor Motor 45°C 40°C 11%

Exhibit Area VDU Rear Vents 45°C 45°C 5%

Recorded at Science World (Science and Technology Center) June 17th, 2003, 2:45 PM, pre-Harmonizer installation (ambient temperature 200 C), and July 10th, 12:37 PM, post-Harmonizer installation (ambient temperature 220 C).

Page 13: Legend Power   Overview 97 2003 120410 1256 Do

System• Systems Size (amps @ 600V):

– 400, 500, 600, 700, 800, 900, 1000

• Remote monitoring– Live wireless monitoring options are available

• Lead times– 6-8 weeks from PO to install & commissioning

• Extended services• 2 year extended service warranty: $4,000• 4 year extended service warranty: $6,500• 7 year extended service warranty: $10,000

Page 14: Legend Power   Overview 97 2003 120410 1256 Do

Facility Audit• Legend Power can Audit all prequalified buildings to

help reduce energy waste• First receive & Review:

– 24 Months of Billing History – Single Line Drawings

• Then the on-site visit:– Voltage optimization analyzer – lighting test box– Hioki power quality analysis for one week– Load Inventory

Page 15: Legend Power   Overview 97 2003 120410 1256 Do

Proposal

• Within 3 weeks of the audit a detailed five page audit report and proposal are delivered:

• Energy savings and peak power reduction• GHG reduction• Annual dollar savings based on their current invoices• Available incentive funding for the project• Net payback period for their project• Net Present Value for their investment• A complete review of the data gathered and savings

calculation methodology

Page 16: Legend Power   Overview 97 2003 120410 1256 Do

Installation

• Completed by certified electricians

• Process

– 4 day rough in

– 40 min – 4 hr cut over

• Hot swap service – no down time

Page 17: Legend Power   Overview 97 2003 120410 1256 Do

Installation

1) Floor Mount 2) Ceiling Mount

3a) Main Panel –Before Top Mount 3b) Seismic Frame & Main Panel Extension 3c) Top Mount Installation

Page 18: Legend Power   Overview 97 2003 120410 1256 Do

InstallationLocation A – Directly on the secondary side of the transformerLocation B – Immediately after the main breaker Location C – After the utility metering (the ideal method) Location D – On distribution loads

Page 19: Legend Power   Overview 97 2003 120410 1256 Do

Commercial Building Installation

600, 480, 400 VAC Utility

The Harmonizer-AVR unit can be spliced into several different locations within the electrical distribution system

Utility Meter

Typically 600, 480 or 400 V distribution

Page 20: Legend Power   Overview 97 2003 120410 1256 Do

Measurement & Verification

• Measurement and Verification procedure conducted in conjunction with the incentive funding body’s and/or utility’s auditors

• A final report will be delivered to the client within three weeks documenting the actual savings results with an accuracy of + 4%, 95% of the time

Page 21: Legend Power   Overview 97 2003 120410 1256 Do

Measurement & Verification

Measurements of Instantaneous Kilowatts on 10 Minute Intervals for One Week

Page 22: Legend Power   Overview 97 2003 120410 1256 Do

Performance Guarantee

• Within 30 days of the completed installation, Legend Power will conduct a Measurement and Verification procedure (M&V) and deliver a detailed report to the customer, comparing the projected savings summarized below with the actual savings observed after the installation.

• If the M&V report reveals a savings discrepancy greater than 15% from the projected savings in the Audit Report, the customer will have the option of requesting Legend Power remove the system from their facility(s) at Legend Power’s cost, and receive a full refund on the project

Page 23: Legend Power   Overview 97 2003 120410 1256 Do

Major Accounts

“Based on results observed, it has been concluded that the Harmonizer made significant energy savings…..”

Page 24: Legend Power   Overview 97 2003 120410 1256 Do

Major Accounts

“…our electrical bills dropped in excess of 10%”

“Based on the strong savings results, we were enthusiastic in purchasing your device…. Through the use of the electrical Harmonizer we have reduced our annual energy consumption by more than 330,000-kilowatt hours.”

Page 25: Legend Power   Overview 97 2003 120410 1256 Do

Front Views Hot Swap AVR

Photographs Electrical Harmonizer-AVR

Page 26: Legend Power   Overview 97 2003 120410 1256 Do

Summary of Harmonizer-AVR Benefits

• Reduce annual energy bill by up to12% • Reduce the building’s carbon footprint• Reduce peak power, saving penalties and charges• Minimal disruption to facility operations• Approx 3 year ROI on 20 year life device• Lighting replacement savings (less voltage, less heat)

– Tube /bulb life– Ballast life

• Less periodic maintenance & related labor costs

Page 27: Legend Power   Overview 97 2003 120410 1256 Do

Recommendations

1. Book complimentary audits in selected facilities

2. Complete installations3. Review Installation results and define role

out plan for large scale project

Page 28: Legend Power   Overview 97 2003 120410 1256 Do

Legend Power Systems Inc.