lenovo – certifikovanÁ hw platforma pre sap hana 2015 lenovo internal. all rights reserved....

36
LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 [email protected]

Upload: amberlynn-cooper

Post on 13-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA

2015 Lenovo Internal. All rights reserved.

Miklos Farkas

9/25/2015 [email protected]

Page 2: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

2

• Lenovo provides Infrastructure components Technology services for SAP HANA• Continued use of IBM GPFS - key differentiator for Lenovo SAP HANA solutions• X6 Rack systems accommodate multiple generations of technology in the same server • On-going technology roadmap to drive leadership solution for SAP HANA

– On-premise, TDI, Cloud

• Continued leadership– Largest certified SAP HANA clusters (up to 112 TB main memory)

– Showcase of 100 TB SAP HANA cluster at SAPPHIRE 2012

– Investment protection (add new X6 Nodes to existing ex5 clusters)

– Large system memory support – 64GB DIMMs and technology innovations beyond

– Choice of X6 rack or Flex System blade form factor

• Consistent, integrated support coordinated with SAP

Lenovo Integrated Value Proposition

2015 LENOVO. All rights reserved.

Page 3: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

3

To support single node configurations and scale out clusters– 2 to 8 E7-8880v2 processors

(E7-8890v2 for improved performance or E7-4880v2 and E7-4890v2 only if the customer agrees to never upgrade to 8s)

– 128 GB – 6 (12) TB GB Main memory DDR3

– Sufficient persistent internal storage according to SAP‘s KPIs10k SAS HDD, Flash Cache, RAID5

– Network 4 x 10 GbitE, 4 x 1 GbitE

– GPFS

– Systems Director (Agent)

– VMware ESX 5.5 (optional)

– Novell SLES for SAP Applications or RedHat

– SAP HANA Software Stack

Building Blocks for SAP HANA “Appliance”

2015 LENOVO. All rights reserved.

HW

SW

x3850 X6

x3950 X6

Page 4: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

4

IDEA 2014 Industrial Design Competition finalist1

•Market leader

•World’s largest system

X6 Servers: High End Innovation

2014 LENOVO INTERNAL. All rights reserved.

•100+ Benchmarks Across EXA Generations

•Post-Launch, 7 Winning Benchmarks for X6 Portfolio

#1Invested in Enterprise X-Architecture

eXFlash memory- channel storage

1st joint development partner

$1B

Modular design for multiple generations of processors

1st

x3850 X6

x3950 X6

Page 5: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

5

The Modular Design Concept: X6 Adapts to Business Needs

2015 LENOVO. All rights reserved.

Storage Book 4 Compute Books

Each compute book includes one processor and 24 DIMMs

Deliver up to 6TB of memory or 12.8TB of eXFlash memory-channel storage

Each x3850 X6 contains 4 Compute books

Ability to swap out Compute books as memory or processor generations change

The Storage book delivers up to 6.4TB of eXFlash 1.8”

SSD or 12.8TB of SAS 2.5”.

Ability to host 2 storage controllers for maximum

bandwidth

Page 6: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

6

6

Create the fit-for-purpose solution, whether clients need to support typical HBAs or specialty GPGPU cards

Primary I/O Book

Up to 2 types of IO Books, Half-Length and Full-Length

Each IO Book delivers an additional 3 PCIe slots

Mezz-LOM solution gives clients the ability to select the networking technology that fits their requirements

Hosts the IMM, PCIe slots, and the dedicated Mezz-LOM solution

THE MODULAR “BOOK” DESIGN ALSO PROVIDES CLIENTS FRONT AND REAR ACCESS TO MODULAR COMPONENTS

Page 7: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

7

X3850/3950 X6 Compute Books

Intel Xeon E7-4800 v3 or E7-8800 v3 processor

12x DDR3 or DDR4 DIMM slots on right side of the Compute Book

12x DDR3 or DDR4 DIMM slots on left side of the Compute Book

X6 Haswell will offer the choice of DDR3 or DDR4 Compute Books. Each Compute Book contains the Intel processor and 24 DDR3 or DDR4 DIMM slots. All Compute Books in the server must be the same type -- DDR3 or DDR4. (Within chassis, all books need to be same processor type and same memory type.)

2014 LENOVO. All rights reserved.

Note: DDR3 DIMMs can not be put into DDR4 compute books or visa versa.

Page 8: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

8

Lenovo Solution for SAP HANA with X6 (for BW, Datamart and SoH) 2 processors

Size

Building Block x3850 X6 x3850 X6 x3850 X6

Part Number (Sys x - config)

Based on 3837-AC3AC32S128S

Based on 3837-AC3AC32S256S

Based on 3837-AC3AC32S512S

Intel CPU *) 2x E7-8880v2

2x E7-8880v2

2x E7-8880v2

RAM 128 GB 16x 8GB

256 GB 16x 16GB or 32 x 8GB

512 GB 32x 16GB

Storage 2x 400 GB SSD6x1.2TB HDD

2x 400 GB SSD6x1.2TB HDD

2x 400 GB SSD6x1.2TB HDD

Storage Ctrl 1x M5210 1x M5210 1x M5210

Data / Log Storage Summary

3.6 TB RAID5 3.6 TB RAID5 3.6 TB RAID5

Ethernet 4x 10GbE 4x 1GbE 4x 10GbE 4x 1GbE 4x 10GbE 4x 1GbE

Upgrade Options without replacing the Memory

128 256 256 5122S 4s

2s 4s

No T-Shirt sizes

*) Processor type alternatives: E7-8890v2 for improved performanceE7-4880v2 and E7-4890v2 only if the customer agrees to never upgrade to 8s

Certification2015 LENOVO. All rights reserved.

Page 9: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

9

Lenovo Solution for SAP HANA with X6 (for BW, Datamart and SoH)

Size

Building Block x3850 X6 x3850 X6 x3850 X6 x3950 X6 x3950 X6

Part Number (Sys x - config)

Based on 3837-AC3AC34S256S

Based on 3837-AC3AC34S512S

Based on 3837-AC3AC34S1024S

Based on 3837-AC4AC48S1024S

Based on 3837-AC4AC48S2048S

Intel CPU 4x E7-8880v2

4x E7-8880v2

4x E7-8880v2

8x E7-8880v2 8x E7-8880v2

RAM 256 GB 32 x 8GB 512 GB 32x 16GB or 64 x 8GB

1 TB 64x 16GB or 32 x 32GB

1 TB 64x 16GB

2 TB128x 16GB

Storage 2x 400GB SSD 6x 1.2 TB HDD

2x 400GB SSD6x 1.2 TB HDD

4x 400 GB SSD15x 1.2 TB HDD

12x1.2TB HDD4x400GB SSD

12x1.2TB HDD4x400GB SSD

Storage Ctrl 1x M5210 1x M5210 1x M52101x M5120

2x M5210 2x M5210

Data / Log Storage Summary

3.6 TB RAID5 3.6 TB RAID5 13.2 TB RAID5 9.6TB RAID5data/log

9.6TB RAID5data/log

Ethernet 4x 10GbE4x 1GbE

4x 10GbE4x 1GbE

4 x 10GbE4 x 1GbE

4x 10GbE4x 1GigE

4x 10GbE4x 1GigE

Upgrade Options without replacing the Memory

256 512 512 1 TB 1 TB 2 TB 1 TB 1.5 TB1 TB 2 TB

All 4s systems upgradeable to 8 socket.

2015 LENOVO. All rights reserved.

Page 10: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

10

Lenovo Solution for SAP HANA with X6 (for BW and Datamart)Size

Building Block x3850 X6 x3850 X6 x3850 X6 x3850 X6 x3850 X6 x3850 X6

Part Number (Sys x - config)

Based on 3837-AC3AC32S256C

Based on 3837-AC3AC32S512C

Based on 3837-AC3AC34S512C

Based on 3837-AC3AC34S1024C

Based on 3837-AC4AC48S1024C

Based on 3837-AC4AC48S2048C

Intel CPU *) 2x E7-8880v2

2x E7-8880v2

4x E7-8880v2

4x E7-8880v2

8x E7-8880v2

8x E7-8880v2

RAM 256 GB 16x 16GB or 32 x 8GB

512 GB 32x 16 GB

512 GB 32x 16GB or 64 x 8 GB

1 TB 32x 32GB or64 x 16 GB

1 TB 64x 16GB or128 x 8 GB

2 TB 64x 32GB or128 x 16 GB

Storage 2x 400 GB SSD6x1.2TB HDD

4x 400 GB SSD15x1.2TB HDD

4x 400 GB SSD15x1.2TB HDD

4x 400 GB ZSD15x1.2TB HDD

12x1.2TB HDD4x400GB SSD

21x1.2TB HDD6x400GB SSD

Storage Ctrl 1x M5210 1x M52101x M5120

1x M52101x M5120

1x M52101x M5120

2x M5210 2x M52101x M5120

Data / Log Storage Summary

3.6 TB RAID5 13.2 TB RAID5 13.2 TB RAID5 13.2 TB RAID5 9.6 TB RAID5 19.2 TB RAID5

Ethernet 4x 10GbE 4x 1GbE

4x 10GbE 4x 1GbE

4x 10GbE 4x 1GbE

4x 10GbE 4x 1GbE

4x 10GbE 4x 1GbE

4x 10GbE 4x 1GbE

Upgrade Options without replacing the Memory

256 5122S 4s

2s 4s 512 1 TB 1 TB 2 TB 1 TB 2 TB 2 TB 6 TB

Scale out Up to 4 nodes Up to 4 nodes Up to 56 nodes Up to 56 nodes Up to 56 nodes Up to 56 nodes

2015 LENOVO. All rights reserved.

Page 11: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

11

Lenovo Solution for SAP HANA only for Suite on HANA with X6

Size

Building Block x3850 X6 x3950 X6 x3950 X6 x3950 X6

Part Number (Sys x - config)

Based on 3837-AC3AC34S2048S

Based on 3837-AC4AC48S4096S

Based on 3837-AC4AC48S6144S

Based on 3837-AC4

Intel CPU 4x E7-8880v2 8x E7-8880v2 8x E7-8880v2 8 socket

RAM 2 TB32 x 64GB or 64x 32GB

4 TB(128 x 32 GB)

6 TB(192 x 32 GB)

12 TB *(192 x 64 GB)

Storage 4x 400GB SSD 15x 1.2TB HDD

21x1.2TB HDD6x400GB SSD

30x1.2TB HDD6x400GB SSD

tbd

Storage Ctrl 1 x M52101 x M5120

2x M52101x M5120

2x M52101x M5120

tbd

Data / Log Storage Summary

13.2 TB RAID5 19.2TB RAID5data/log

28.8TB RAID5data/log

tbd

Ethernet 4x 10GbE 4x 1GbE

4x 10GbE4x 1GigE

4x 10GbE4x 1GigE

tbd

Upgrade Options without replacing the Memory

2 TB 4 TB 4 TB 6 TB

SAP Business Suite on HANA:Scale up recommended

* Not approved by SAP for SAP HANA, but technically feasible

2015 LENOVO. All rights reserved.

Page 12: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

12

Simple– No SAN required because of IBM’s General Parallel File System

– Expand database by adding nodes with GPFS

– One part number ordering for each node (stand-alone or scale-out)

Seamless– Highly Available through IBM GPFS (HA)

– Intelligent Cluster integrated packaging and assembly

– Installation and managed services

Scalable– Scale out to 56 nodes and larger using IBM GPFS

– Certified by SAP

Scale up

Scale o

ut

Scale out

Never lose your initial investment with Scale Up / Scale Out options !

Scale up each nodeor continueto scale out

SAP HANA Scalability

2015 LENOVO. All rights reserved.

Page 13: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

13

SAP HANA Cluster with IBM GPFS FPO

FPO - File Placement Optimizer

nsd server nsd server nsd server nsd server

node node node node node node node node node node

Eth/IB Eth/IB

client client client client client client client client client client

LocalityLocality Write AffinityWrite Affinity MetablocksMetablocks

Pipelined replicationPipelined replication Distributed recoveryDistributed recovery

FibreChannel FibreChannel FibreChannel FibreChannel

2015 LENOVO. All rights reserved.

Page 14: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

14

• Compatibility with existing clusters• Scale out with up to 50% of nodes in cluster based on new X6 systems

– Up to 50% of the nodes in the cluster based on X6 systems– Once more than 50% of the nodes are based on X6 systems, then cluster must migrate to 100% X6 systems– Older eX5 systems redeployed to other environments

Investment Protection

1TB eX5node

1TB eX5node

1TB eX5node

1TB eX5node

1TB eX5node

Ethernet

1TB eX5node

1TB eX5node

1TB eX5node

1TB eX5node

1TB eX5node

1TB X6node

1TB X6node

1TB X6node

1TB X6node

Ethernet Ethernet

Ethernet

More HANA memory capacity

5TB Total Memory

9TB Total Memory2015 LENOVO. All rights reserved.

Page 15: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

16

SAP HANA on Flex – Solution Overview

2015 LENOVO. All rights reserved.

Page 16: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

17

x880 Workload Optimized Solution for SAP HANA

2015 LENOVO. All rights reserved.

Page 17: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

18

Tailored Datacenter Integration (TDI) for SAP HANA (aka: „Bring your own storage or network components“)

2015 LENOVO. All rights reserved.

http://hana.sap.com/abouthana/hana-technology/data-center.html http://scn.sap.com/docs/DOC-60327

Page 18: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

19

Appliance Delivery Model SAP HANA TDI Approach

Hardware Selection

Little flexibility only• Customer can choose between different

appliances• No possibility to replace certain components

by HW already used in customers DC

Save IT budget and existing investments• reuse preferred storage• reuse preferred network components

Implementation Effort Low for customer• Preconfigured HW plus preinstalled SW

• Only HW is delivered • Installation to be done by customer (incl OS) • Extensive docu (guides, SAP notes) available

Safeguarding / Solution Validation

Done together by SAP and HW Partner• SAP HANA Going-Live check offered by SAP AGS• Self-managed infrastructure tests possible

- SAP HANA HW Configuration Check Tool

Support Fully provided by SAP Individual support agreement(s) with HW partner(s) required

OS Service Contract Appliance vendor is reseller of OS provider’s service contract

Customer to care for getting the OS provider’s service contract (standard with Lenovo HANA TDI)

Integrated Solution vs. TDI

2015 LENOVO. All rights reserved.

Page 19: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

20

Lenovo Solution for SAP HANA™ appliance

2015 LENOVO. All rights reserved.

Data Center Ready

• Improved reliability by helping reduce single points of failure

• Reduced risk, maintainance and administration

– Persistence in internal disks– Integrated Backup / Restore – High Availability– Monitoring– Disaster Recovery Solutions – Security and Auditing

• Technology Services provide a safe project start in the datacenter

SAP HANA®

OSSUSE Linux Enterprise Server 11 or

Red Hat 6.5 Priority Support for SAP applications

GPFS

FPO functionality

Server HW

eX5 / x6

Applications

SUSERed Hat

Page 20: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

21

• High Availability (local within one datacenter):– Scale out with stand-by node in a cluster (IBM GPFS functionality) – SAP HANA System Replication (but no automatic failover)

• Stretched HA (e.g. campus setup for single node systems):– 1+1+ quorum node (IBM GPFS functionality) – SAP HANA System Replication (but no automatic failover)

• Disaster Recovery (between two datacenters): – Storage Replication (IBM GPFS functionality) – SAP HANA System Replication

Business Continuity Options

2015 LENOVO. All rights reserved.

Page 21: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

22

SAP HANA Appliance - Single Node

x3850 X6 node

Shared file system - GPFS

DB partition 1

- Index server- Statistic server- SAP HANA® studio

- SAP HANA® DB

SAP HANA® DB

First replica

3.6 TB 9.6 TB

data + log

2015 LENOVO. All rights reserved.

Page 22: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

23

SAP HANA Appliance - Scale out

Lenovo Solution configurations are delivered with GPFS shared file system for seamless

growth

Validated by SAP

Only Lenovo Solution has 56 x 2 TB systems certified for scale out.

Larger cluster sizes can be validated on request.

node03node01 node02

Shared file system - GPFS

DB partition 1

- Index server- Statistic server- SAP HANA studio

- SAP HANA DB Worker node

DB partition 2

- Index server- Statistic server

- SAP HANA DB Worker node

SAP HANA DB

data02 +log02

DB partition 3

- Index server- Statistic server

- SAP HANA DB Worker node

data03 + log03First replica

local storage

data01 + log01

local storage local storage

2015 LENOVO. All rights reserved.

Page 23: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

24

node04node03node01 node02

Shared file system - GPFS

DB partition 1

- Index server- Statistic server- SAP HANA studio

- SAP HANA DB Worker node

DB partition 2

- Index server- Statistic server

- SAP HANA DB Worker node

DB partition 3

- Index server- Statistic server

- SAP HANA DB Worker node

- Index server- Statistic server

- SAP HANA DB Standby node

Second replica

First replica

SAP HANA DB

local storagelocal storagelocal storagelocal storage

data01 + log01 data02 + log02 data03 + log03

SAP HANA Appliance – Scale Out with High Availability

2015 LENOVO. All rights reserved.

Page 24: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

25

node04node03node01 node02

Shared file system - GPFS

DB partition 1

- Index server- Statistic server- SAP HANA studio

- SAP HANA DB Worker node

DB partition 2

- Index server- Statistic server

- SAP HANA DB Worker node

- Index server- Statistic server

- SAP HANA DBDefunct node

- Index server- Statistic server

- SAP HANA DB Worker node

Second replica

First replica

SAP HANA DB

local storagelocal storagelocal storagelocal storage

data01 + log01 data02 + log02 data03 + log03

DB partition 3

SAP HANA Appliance – Scale Out with High Availability

2015 LENOVO. All rights reserved.

Page 25: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

26

node04node03node01 node02

Shared file system - GPFS

DB partition 1

- Index server- Statistic server- SAP HANA studio

- SAP HANA DB Worker node

DB partition 2

- Index server- Statistic server

- SAP HANA DB Worker node

- Index server- Statistic server

- SAP HANA DBStandby node

- Index server- Statistic server

- SAP HANA DB Worker node

Second replica

First replica

SAP HANA DB

local storagelocal storagelocal storagelocal storage

data01 + log01 data02 + log02 data03 + log03

DB partition 3

SAP HANA Appliance – Scale Out with High Availability

2015 LENOVO. All rights reserved.

Page 26: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

272015 LENOVO. All rights reserved.

node1 node2

Shared File System A

HDD HDD

Data

Datam

eta

d

ata

seco

nd

rep

lica

first

rep

lica

sda1

OSsda2 sda1

OSsda2

FS DescFile

Sys

tem

Des

crip

tor

FS Desc

LG1FG1

LG1FG2

node3

File system B

HDD

sda1

OSsda2

FS Desc

LG1

FG1

Datafirst

rep

lica

File

Sys

tem

Des

crip

tor

me

ta

da

ta

SAP HANASystem Replication

GPFS Cluster A

GPFS Cluster B

M5120Extra file systemfor non-prod...

Metadata

Metadata

Metadata

HA using GPFS Storage Replication with DR using SAP HANA System Replication and storage expansion for additional non-production instance

1+1

/ 1

HA

and

DR

Page 27: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

28

STG Lab Services Team:

28www.ibm.com/systems/services/labservices

Global industrial company, BelgiumIBM SAP HANA on new x3850 X6 Platform

What did we do?

SAP-HANA installation/configuration service Preparation sessions with customer to plan system setup,

network setup and installation. SAP HANA HW configuration validation and BIOS,

firmware, RAID configuration. Installation of Operating System (SLES 11 SP3 for SAP with

HANA extensions). Configure network switches and OS network settings and

verify operation for seamless integration into customer network.

GPFS installation/configuration/verification. Install HANA DB in the DR Cluster. Skill transfer, training and documentation.

Results Successful installation of this complex IBM SAP HANA

environment Successful ‘in-time’ installation (5 days) of the IBM SAP

HANA appliance despite Networking and HW errors/corrections

Customer team was very satisfied with the level of expertise and consultant capabilities

Overview of project

A Global industrial group of companies headquartered in Stockholm, Sweden. The Group employs more than 40,000 people. The company manufactures products at about 100 production sites in more than 20 countries. Subsidiary companies develop and manufacture industrial tools worldwide.

STG Lab Services delivered a first of a kind implementation of a full redundant IBM SAP HANA Desaster Recovery (DR) appliance based on the new x3850 X6 Platform. The Disaster Recovery appliance was spread over two data centres for high availability in case of disaster in Brussels, Belgium.

The service also covered training and consulting for the installed IBM SAP HANA appliance to enable the customer on operational aspects.

Thomas Heinsch, David Rajendra

Page 28: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

29

Lenovo – EMEA Enterprise Solution Services

2015 LENOVO. All rights reserved.

Lenovo Services Team:

Food company - France

Overview of project

A France based, worldwide operating food company. Their businesses are flour mills and french bakery products served in over 50 countries.

STG Lab Services delivered an on-site installation and configuration of two AC32S512S IBM SAP HANA appliances in a High Availability setup for the company as future productive core part of a new SAP landscape of overall 6 appliances.These are distributed over two locations and will be replicated for increased availability.

The service ensures the complex configuration between OS, GPFS and SAP HANA. This Lab Service installation service allows an effective use and support of the IBM SAP HANA appliances.

Frank Kuchenbecker

What did we do?

SAP-HANA installation/configuration service Sessions with customer to plan system setup, network

setup and installation. SAP HANA HW configuration validation. BIOS, firmware, RAID configuration and verification. Install OS (SLES 11 SP3 for SAP). GPFS installation/configuration/verification Install HANA IMDB as HA cluster, ready for replication Skill transfer and post install documentation. Healthcheck for several other IBM HANA appliances,

installed by a BP

Results Successful installation of SAP-HANA appliances. Customer team was very satisfied with the level of expertise

and consultant capabilities and plans further activities with our Lab Services team for upcoming expansions of their HANA landscape.

Page 29: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

30

Lenovo – EMEA Enterprise Solution Services

2014 LENOVO. All rights reserved.

Lenovo Services Team:

Brewing and beverage companySAP HANA, Germany

Overview of project

A multinational brewing and beverage company headquartered in London, United Kingdom. It is the world's second-largest brewer. It has operations in 75 countries across Africa, Asia, Australia, Europe, North America and South America and sells around 21 billion liters of lager per year.

STG Lab Services provided further expansion of a business critical IBM SAP HANA production system. The Scale-Out cluster was expanded to increase HANA Database capacity in customer data center in Frankfurt/Main.

This service ensures the complex configuration between OS, Network, GPFS and SAP HANA Platform edition is properly installed and configured for effective use and support of the IBM SAP HANA appliance.

Thomas Heinsch

What did we do?

SAP-HANA installation/configuration service Extensive sessions with customer to plan system setup,

network setup and installation in a productive live environment.

BIOS, firmware, RAID and OS configuration and verification.

Configure network switches and OS network settings and verify operation for seamless integration into customer network.

GPFS installation/configuration/verification. Expand HANA Data Base with 2 new nodes and verified

successful implementation with additional fail over tests. Skill transfer and post install documentation.

Results Successful installation of SAP-HANA appliance in the

customer’s data centre environment Customer team was very satisfied with the level of expertise

and consultant capabilities and plans further activities with our Lab Services team.

Page 30: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

31

STG Lab Services Team:

31www.ibm.com/systems/services/labservices

Multinational document management corporation – IBM SAP HANA - UK

Overview of projectAn American multinational document management corporation that produces and sells a range of color and black-and-white printers, multifunction systems, photocopiers, digital production printing presses, and related consulting services and supplies. This company also offers managed IT services and runs own data centres.

STG Lab Services delivered consulting and technical assistance for the implementation of a Disaster Tolerant IBM SAP HANA Appliance. Th company is running the Disaster Tolerant environment in two data centres near Telford as a managed service in the UK.

The service ensured the complex Disaster Recovery configuration between Operating System, GPFS, Network switches and SAP HANA application spanned over two data centres.

Thomas Heinsch, Frank Kuchenbecker, David Rajendra

What did we do?

SAP-HANA installation/configuration service Extensive sessions with customer to plan system

setup, network setup and installation in two data centres.

Design, plan and implementation of a GPFS based Disaster Tolerance setup and supporting migration from an existing customer environment.

Replacement of a failed node in an existing Disaster Tolerance setup.

BIOS, firmware, RAID and OS and network configuration and verification for seamless integration into customer network and existing HANA environment.

Skill transfer and post install documentation.

Results Successful installation of SAP-HANA appliance in

the customer’s data centre environment Customer team was very satisfied with the level of

expertise and consultant.

Page 31: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

32

Reference Customers

Fragrance Companyowns several European fashion brands

Link 

Link

Link

Link

Link  Link

Link

Link

Major Electric Utility Provider Link

Link

2015 LENOVO. All rights reserved.

Major Retailer Link

Link

Link

Link

Link

Page 32: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

33

More Information

2015 LENOVO. All rights reserved.

Lenovo Solution for SAP HANA Documentation: Quickstartguide, Implementationguide and Operationsguide

Page 33: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

34

Numerous #1 Benchmark results since X6 roll-out #1 TPC-E* – as of Feb 16, 20141

#1 SPECvirt_sc2013** – as of Feb 20, 20142

#1 SAP® Applications Sales & Distribution 2-Tier 4-S*** – as of Feb 18, 20143

#1 @1000GB non-clustered TPC-H* – as of Apr 15, 20144

#1 SAP Applications Sales & Distribution 2-Tier 8-S – as of June 16, 20146

#1 SPECvirt_sc2013** – as of May 20145

#1 SPECvirt_sc2013** – as of Nov 20147

#1 TPC-E – as of Nov 25, 20148

#1 SAP BW-EML – as of Mar 16, 201510

#1 @10,000GB non-clustered TPC-H* – as of Apr 6, 201511

1, 2, 3, 4, 5, 6, 7, 8, 9, 10,11 Detailed information about all of these benchmarks and their respective company trademarks can be found in the Backup section of this presentation.

7 Winning Performance Measures in STAC-M3 -- as of Jan 20159

2015 LENOVO. All rights reserved.

Page 34: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com

35

SAP HANA BW-EML Scale out  @10 Billion records 4-processor world record18

Continued innovation: 7 new world records as of 5/5/15 SAP HANA BW-EML Scale out @1 Billion records 4-processor world record12

TPC-H* @ 3000 GB 4-processor world record13

SPECvirt_sc2013** 4-processor world record14

SAP SD 2-Tier*** (Windows) 4-processor world record15

ANSYS FLUENT x86 4-processor world record for single x86 server on the fluidized_bed_2m compared to a baseline as tested by Intel 17

TPC-E* 4-processor world record16

2015 LENOVO. All rights reserved.

12, 13, 14, 15, 16, 17, 18 Detailed information about all of these benchmarks and their respective company trademarks can be found in the backup section of this presentation.All results listed on this page are as of May 5 2015.

Page 35: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com
Page 36: LENOVO – CERTIFIKOVANÁ HW PLATFORMA PRE SAP HANA 2015 Lenovo Internal. All rights reserved. Miklos Farkas 9/25/2015 mfarkas@lenovo.com