November 14 | LEO Pharma research based, people driven
RIGHT-FIRST-TIME PROJECT
Topicals Bulk Business UnitLEO Pharma
Marie Hayes
OpEx Department
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 2/35
November 14 | Slide 2research based, people driven
OVERVIEW
• PROJECT BACKGROUND
• GOALS - Deliverables
• METHODS – DMAIC model, Error-proofing
• ACTIONS – Data-gathering, Analysis
• RESULTS – Implementing findings
• LEARNINGS – What went well?, What can we build on?
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 3/35
November 14 | Slide 3research based, people driven
BACKGROUND
• January 2009, a Value Stream Mapping exercise wascarried out, to identify areas to focus our improvementactivities
• 43 key priorities were identified and prioritised
• Error Reduction in Batch-Paperwork was identified as akey priority
• Project Scope: Dovobet ointment
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 4/35
November 14 | Slide 4research based, people driven
METHODOLOGY
5. CONTROL
4. IMPROVE 3. ANALYSE
2. MEASURE
1. DEFINE
TheDMAIC
Cycle
SIPOC
Process Map
Gather data
Pareto, Bar chart
Root Cause AnalysisPlan and implement
actions to improve
Sustaining the gains
Close out Actions
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 5/35
November 14 | Slide 5research based, people driven
ERROR-PROOFING METHODS
• Error-Proofing: The process of anticipating, preventing, &
detecting errors which adversely affect customers & resultin waste – developed by Shigeo Shingo - 950’s
• Error Analysis, Deviation Analysis & Error Elimination
• Error-proofing Documentation – Affordance Techniques:Simplify, Use Colours, Photographs, Symbols, ProcessFlow Diagrams, reminders, prompts, accurate work-flow
• Error-proof Processes – install fail-safe devices so that
the system user cannot overlook the required detail
• Standardisation and Consistent work methods
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 6/35
November 14 | Slide 6research based, people driven
6
Verbal: Instructions, training,
meetings,
Sound: alarms,
Siren, fire alarm.
Colour: ‘red’ = danger, ‘hot-
spots’, hi-visibility jackets
Written: SOP’s, Signs,Notices, Manuals.
Reduce: the risk (physically)
Prevent
Error-Proofing
Hierarchy
PLEASECLOSE
THE
DOOR
Leasteffectivemethods
Mosteffectivemethods
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 7/35November 14 | Slide 7research based, people driven
TEAM COMPOSITION - ESSENTIALS
• CROSS-FUNCTIONAL TEAM, drawn from key stakeholdergroups
• OPERATOR INVOLVEMENT, to gain insights into document
usability from a User viewpoint
• COMPLIANCE, For advice and support on complianceissues
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 8/35November 14 | Slide 8research based, people driven
TEAM COMPOSITION
• Bulk Supervisor Morgan Cunningham
• Bulk Operator Brian Cummins
• QA/Compliance Pamela Jones
• RFT Executive Jason Redmond
• Manufacturing Development Geraldine Doyle• QC Executive Manus Treacy
• Op Ex Facilitator Marie Hayes
• Project Sponsor: Area Manager Michael Bradley
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 9/35November 14 | Slide 9research based, people driven
PROJECT TIMELINES
ID ERROR-PROOFING PROJECT Start by: Finish by: Duration
Apr May Jun Jul Aug Sep
1 3w10/04/200923/03/2009DEFINE : Based on Data Analysis:
Identify top 3 paperwork RFT problems
3 2w12/05/200929/04/2009 ANALYSE: - Based on top 3
problems, draft a range of solutions
5 1w29/05/200925/05/2009 ANALYSE: - Present data to Ops and
draft solutions with Operators’ help
7 1w19/06/200915/06/2009CONTROL: Measure to determine
impact of changes, Adjust, if needed
Q2 09
6 1w04/06/200929/05/2009IMPLEMENT solutions - In place 3
days before wk 24 d/bet campaign
2 1w28/04/200922/04/2009MEASURE: - Define which measure
will demonstrate impact of actions
8w18/08/200924/06/2009PHASE 2: Repeat project steps above
for next round of problem-solving
Q3 09
8
8w26/10/200901/09/2009PHASE 3: Repeat project steps abovefor next round of problem-solving
Q4 09
Oct Nov Dec
4 1w29/05/200925/05/2009 ANALYSE: - Gather RFT data on the
current dovobet campaign
10
9
8w18/12/200926/10/2009PHASE 4: Repeat project steps above
for next round of problem-solving
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 10/35November 14 | Slide 10research based, people driven
DEFINE THE PROBLEM
Paperwork review process: It takes around 3 hours for each bulkpaperwork review, before it proceeds to Q.C. department forfinal batch review and release.
Errors in Batch Paperwork lead to:
• Reduced Quality, Increased Risk to patient safety
• Delays to product approvals, Increased Lead-time, andIncreased Costs
• Resources tied up in Non-Value-Add activities
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 11/35
November 14 | Slide 11research based, people driven
PROJECT GOALS
• Maximise accuracy of paperwork completion
• Shorten through-put time of batch paperwork
• Minimise Non-Value-Add activities
• Achieve a 36% improvement in Right-First-Time for
Dovobet batch paperwork by December 2009
• Achieve 75% R.F.T. to first-reviewer, by December 2009
DELIVERABLES
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 12/35
November 14 | Slide 12research based, people driven
MEASUREMENT PHASE
• Company RFT metric provides results on a macro level:
CORRECT PAPERWORK = 1 HIT
>1 ERROR = 1 MISS
• Batch paperwork = 500 and 700 manual entries ofSignatures/ Dates/ Data Entries, for an average 12 hourperiod
• The RFT metric is recorded by QC reviewer; Some errors
already resolved by the TBBU reviewer
• Drill-down into detailed level was required
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 13/35
November 14 | Slide 13research based, people driven
DESIGN OF METRIC
• Reporting criteria, that were already in use, did not identify and
root-cause the paperwork errors so, the following error codes weredesigned to analyse errors during this project:
DESCRIPTION OF ERROR
1 MISSING SIGNATURE
2 WRONG DATE FORMAT3 MISSING DATE4 WRONG DATE ENTERED
5 N/A NOT SIGNED AND DATED
6 OVER-WRITES7 INCORRECT DATA ENTRY
8 CALCULATION ERRORS
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 14/35
November 14 | Slide 14research based, people driven
ERRORS - APRIL DOVOBET CAMPAIGN
Breakdown of Errors in April Campaign of Dovobet Ointment in P4 facility
1%
1%
16%
1%
15%
23%
43%
Missing Signature
Missing Date
Incorrect Data Entry
N/A Not Signed & Dated
Overwrites
Wrong Date Entered
Missing Data Entry
TOP 3 ERRORS ACCOUNT FOR 81% OF RFT ISSUES
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 15/35
November 14 | Slide 15research based, people driven
INITIAL ANALYSIS
Errors, by document type
Lot Processing Record (LPR) 73%
Cleaning records 15%
Batch Reports 7%
Other 5%
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 16/35
November 14 | Slide 16research based, people driven
INITIAL ANALYSIS
Results indicated the area of focus:
Omission Errors on the Lot Processing Record
• Root Cause Analysis was carried out to:
Identify risk-increasing factors
Classify defects
Identify methods to mitigate these risk factors
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 17/35
November 14 | Slide 17research based, people driven
CATEGORIES OF HUMAN ERROR• Learning Gap errors
– E.g. New worker, or worker not familiar with operation
• Memory gap errors– People have learnt but are unable to remember or use the
information, when needed
• Inconsistency errors
– Variability in task performance or poor standardisation of workmethod
• Application errors – Person knows how to do the task but makes a mistake
• Omission errors
– Person knows how to do the task but forgets todo it
• Decision errors
– Given the relevant information, an inappropriate decision is made
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 18/35
November 14 | Slide 18research based, people driven
SOLVING OMISSION ERRORS
• Review fields and document layouts
• Use of colour, symbols, shapes, words to gain attention
• Use triggers and focusing aids to prevent Omission Errors
• Analyse & design documents for effectiveness of layout
• Documents must follow the real flow of a process
• The position of information affects processing and recall – place instructions in sequential order.
www. Talsico.com
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 19/35
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 20/35
November 14 | Slide 20research based, people driven
COUNTER-MEASURES
• QUICK FEEDBACK ON ERRORS - Detect errors before
they turn into defects
• DOCUMENT DESIGN – Reduce complexity, Standardisedocuments
• OWNERSHIP FOR QUALITY – Hold RFT awarenesssessions with Operators, Seek Operator involvement
• CULTURE - Foster a supportive reporting culture
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 21/35
November 14 | Slide 21research based, people driven
IMPLEMENTATION – 3 KEY AREAS
• 1. QUICK FEEDBACK ON ERRORS: Perform a trial of
100% source inspection, Goal: to eliminate errors beforethey turn into paperwork defects.
• 2. DOCUMENT RE-DESIGN - Perform an Operator-drivenreview of paperwork design to identify opportunities for
improvements to the content, sequencing, layout orprocess of paperwork review.
• 3. COMMUNICATION: Hold RFT sessions with TBBUteams, to present RFT results, build awareness of cost-of-
quality defects, and ask for input to improvement process
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 22/35
November 14 | Slide 22research based, people driven
QUICK FEEDBACK ON ERRORS
• We had been using a final inspection model to attempt to
catch paperwork defects, after the batch is completed.
• If these errors and omissions can be removed, at source,it reduces lead-time and frees up to valuable resources towork on value-add activities.
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 23/35
November 14 | Slide 23research based, people driven
QUICK FEEDBACK ON ERRORS
• Proposed Solution - “Real-time review” - Self-check of
paperwork while it is in progress, at regular intervals
• Operator self-inspection - On-line review offers animmediate way to check for errors as they crop up, ratherthan letting the defect get through to the end and
inspecting it out.
• Carried out Trial of Self-Inspection in July…..
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 24/35
November 14 | Slide 24research based, people driven
RESULTS SELF-CHECK TRIAL, JULY 2009
No. of Errors in 3 Campaigns of Dovobet
Ointment in P4
01020
304050607080
M i s s i n g
S i g n
a t u r e
M i s s i n g
D a t e
I n c o r r e c t D a
t a E n
t r y
N / A N o t
S i g n e
d & D a t e
d
O v e r w r i t e
s
W r o n g D
a t e E n t e
r e d
M i s s i n
g D a t a
E n t r
y
N o . o f E r r o r Before Self-check
Self-check trial
After Self-check
Comments: 31% reduction overall in error-rate in P4 Dovobet campaign; and aknock-on paperwork improvement is also being seen in P1 and P3 bulk facilities
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 25/35
November 14 | Slide 25research based, people driven
DOCUMENT RE-DESIGN
Carried out in collaboration with Operator to
isolate the problem areas:
• Do users have persistent difficulty with certain sections ofLPR?
• Are certain forms hard to fill in? Team posted the LPR in acommon area – asked Operators to highlight areas ofdifficulty & make remarks
• Colour-coding was introduced to improve readability andprovide better visual prompts
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 26/35
November 14 | Slide 26research based, people driven
TRIAL RESULTS – COLOUR-CODED LPR
Comparison of Daivobet Errors - Trial of colour-coded LPR
0
5
10
1520
25
30
35
40
45
50
M i s s i n
g S i g
n a t u r e
M i s s
i n g D a
t e
I n c o
r r e c t D a t a E n
t r y
N / A
N o t S
i g n e d
& D a t e d
O v e r w r
i t e s
W r o n g D a
t e E n t e r e d
M i s s i n g
D a t a E n
t r y
Error Category
E
r r o r s
5 batches (Black& White LPR)
5 Batches (Colour-coded LPR)
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 27/35
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 28/35
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 29/35
November 14 | Slide 29research based, people driven
OVERALL RESULTS
AVERAGE NO. OF ERRORS (per batch) 2009
0
10
20
30
40
50
60
70
2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 4 6 4 7
Week
E r r r o r C o
u n t
Average Error-count, (perbatch)
Trendline
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 30/35
November 14 | Slide 30research based, people driven
OVERALL RESULTS
NUMBER OF ERRORS - BULK BATCH
PAPERWORK WEEKLY 2009
0
10
20
30
40
50
60
70
80
90
100
2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 3 1 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 4 6 4 7
Week number
ERROR-PROOFING PROJECT
N o
o f e r r o r s
MISSING SIGNATURE
MISSING DATE
INCORRECT DATA ENTRY
N/A NOT SIGNED AND DATED
OVER-WRITES
WRONG DATE ENTERED
WRONG DATE FORMAT
MISSING DATA ENTRY
CALCULATION ERRORS
Trendline
REMARKS: Week 43 and 44: Decline in RFT to TBBU reviewer: Last dovobet campaign was week 41/42, usingthe colour-coded LPR. There were no Daivobet campaigns in week 43/44, so TBBU reverted to LPR with no colourcoding
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 31/35
November 14 | Slide 31research based, people driven
OVERALL RESULTS
Errors in Dovobet Paperwork7 consecutive campaigns - April to Oct 2009
0
10
20
30
40
50
1 2 3 4 5 6 7
7 Dovobet Campaigns
N o
o f E r r o
r s Missing Signature
Missing Date
Incorrect Data Entry
N/A Not Signed & DatedOverwrites
Wrong Date Entered
Missing Data Entry
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 32/35
November 14 | Slide 32research based, people driven
OVERALL RESULTSRIGHT FIRST TIME TO TBBU REVIEWER -
WEEKLY RESULTS 2009
0% 0%
8% 9%
0%
14%
0%
15%
38%
64%
88%
80%
75%
55%
44%
0%
10%
20%
30%
40%50%
60%
70%
80%
90%
100%
18 19 20 21 22 23 24 25 26 27 28 29 30 31 35 36 37 38 39 40 41 42 43 44 45 46 47
Right-First-Time
TREND-LINE
Target 75%
REMARKS: Week 43 and 44: Decline in RFT to TBBU reviewer: Last dovobet campaign was week 41/42, using the colour-coded LPR.There were no Daivobet campaigns in week 43/44. We will review the results of week 46 daivobet campaign data, to reviewwhether colour-coding makes it easier to get sign-offs correct.
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 33/35
November 14 | Slide 33research based, people driven
WHAT WORKED WELL?
• RFT is over 75% since week 45
• Life is now easier for document reviewers – less errorsand less review time
• DMAIC model, Structured problem-solving model
• Operator Empowerment – Getting involvement from
process operators is invaluable
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 34/35
November 14 | Slide 34research based, people driven
KEY CHALLENGES
• At early stages of this project, much useful debate was
generated about the sources of human error
• Diagnosis of the underlying issues is challenging;Team avoided extra secondary checks; We did not appealto people to try harder to achieve RFT.
• Project due to finish in December 2009. Team will quantify
the benefits, prepare Close-out Reports
NEXT STEPS
8/10/2019 Leo Human Error Network Event Dec 2nd 2009
http://slidepdf.com/reader/full/leo-human-error-network-event-dec-2nd-2009 35/35
IN CONCLUSION...
• In many cases, the system can be improved to reducepropensity for human error
• There is considerable scope for addressing usability issuesin our document design
• We need to evaluate design, from each user’s Perspective,across the entire document life-cycle