Lessons Learned from International Catastrophe Pools - Financing Asia’s Exposure to Extreme Weather Professor Shaun Wang Nanyang Business School 7 August 2018 | Grand Copthorne Waterfront Hotel ICRM SYMPOSIUM 2018

Upload: others

Post on 19-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Lessons Learned from International Catastrophe Pools -

Financing Asia’s Exposure to Extreme Weather

Professor Shaun WangNanyang Business School

7 August 2018 | Grand Copthorne Waterfront Hotel

ICRM SYMPOSIUM 2018

Page 2: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Asia’s Economic Development in the next 5 - 20 years

• With a population of 4.5 billion people, Asia is on track for unprecedented economic development

• The rapid population growth and urbanisation in Asia are exacerbating an already significant insurance protection gap in the region.

• Over the past 40 years, according to Swiss Re, only 5% of economic losses from all flood disasters in Emerging Asia were insured.

2018-Aug-07 [email protected] 2

Page 3: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

ASEAN’s infrastructure investment

• Finance Minister Mr. Heng Swee Keat, in his April 5, 2018 keynote speech at the 8th World Bank-Singapore Infrastructure Finance Summit, pointed out that ASEAN’s infrastructure investment needs will total US$2.8 trillion between 2016 and 2030, or about US$184 billion annually, which would require significant private capital to fill in the shortage of public funding.

2018-Aug-07 [email protected] 3

Page 4: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Infrastructure Financing & Insurance Protection Gap

2018-Aug-07 [email protected] 4

Page 5: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

BENEFIT OF RISK POOLING(WORLD BANK, 2017)

2018-Aug-07 [email protected] 5

Page 6: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

CAT Pool: African Risk Capacity

• In 2012, African Risk Capacity (ARC) was established as a Specialized Agency of the African Union to help member states improve their capacities to better prepare for and respond to extreme weather events and natural disasters, therefore protecting the food security of their vulnerable populations.

2018-Aug-07 [email protected] 6

Page 7: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

CAT Pool: ARC (year 1 launching)

• Since 2014, ARC Ltd. enables participating African governments to insure themselves against drought and respond rapidly when their citizens experience harvest failure.

• The inaugural risk pool, which covered the 2014/2015 rainfall seasons, consisted of the 4 countries Kenya, Mauritania, Niger and Senegal.

• Innovation: insurance pay-out will be based on AfricaRiskView (ARV) model output

2018-Aug-07 [email protected] 7

Page 8: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Hypothetical Correlation Matrix

2018-Aug-07 [email protected] 8

Country-

Peril 1

Country-

Peril 2

Country-

Peril 3

Country-

Peril 4

Country-

Peril 5

Country-

Peril 6

Country-

Peril 7

Country-

Peril 8

Country-

Peril 9

Country-

Peril 10

Country-

Peril 11

Country-

Peril 12

Country-

Peril 13

Country-

Peril 14

Country-

Peril 1 1.00 0.15 0.00 -0.13 0.16 -0.13 -0.01 -0.15 -0.14 0.54 0.30 0.32 0.17 0.00Country-

Peril 2 0.15 1.00 -0.01 -0.13 -0.12 -0.01 0.02 -0.15 -0.01 0.32 0.29 0.46 -0.01 0.00Country-

Peril 3 0.00 -0.01 1.00 0.15 0.14 0.51 0.00 -0.16 -0.01 -0.15 0.01 -0.01 0.14 -0.15Country-

Peril 4 -0.13 -0.13 0.15 1.00 0.01 0.14 -0.26 0.01 0.16 -0.15 -0.13 -0.14 -0.01 0.02Country-

Peril 5 0.16 -0.12 0.14 0.01 1.00 0.15 0.02 -0.15 0.01 -0.01 0.47 0.15 0.71 0.16Country-

Peril 6 -0.13 -0.01 0.51 0.14 0.15 1.00 0.14 -0.01 0.15 -0.14 -0.01 -0.13 0.00 0.15Country-

Peril 7 -0.01 0.02 0.00 -0.26 0.02 0.14 1.00 0.15 0.14 -0.17 -0.13 -0.01 0.01 -0.13Country-

Peril 8 -0.15 -0.15 -0.16 0.01 -0.15 -0.01 0.15 1.00 0.34 -0.15 -0.15 -0.15 -0.16 0.34Country-

Peril 9 -0.14 -0.01 -0.01 0.16 0.01 0.15 0.14 0.34 1.00 -0.14 0.00 0.01 0.01 0.32Country-

Peril 10 0.54 0.32 -0.15 -0.15 -0.01 -0.14 -0.17 -0.15 -0.14 1.00 0.32 0.16 0.00 -0.01Country-

Peril 11 0.30 0.29 0.01 -0.13 0.47 -0.01 -0.13 -0.15 0.00 0.32 1.00 0.46 0.49 0.02Country-

Peril 12 0.32 0.46 -0.01 -0.14 0.15 -0.13 -0.01 -0.15 0.01 0.16 0.46 1.00 0.17 -0.01Country-

Peril 13 0.17 -0.01 0.14 -0.01 0.71 0.00 0.01 -0.16 0.01 0.00 0.49 0.17 1.00 0.15Country-

Peril 14 0.00 0.00 -0.15 0.02 0.16 0.15 -0.13 0.34 0.32 -0.01 0.02 -0.01 0.15 1.00

Page 9: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

CAT Pool: ARC (year 2, in and out)

• For the 2015/2016 seasons, the three additional countries of Gambia, Malawi and Mali joined ARC, bringing the total number of risk pool countries to seven.

• For the third risk pool in 2016/2017, Burkina Faso joined the pool while Kenya and Malawi left, leaving a total of six countries in the pool. The government of Kenya has citied political pressure to explain expenditures.

2018-Aug-07 [email protected] 9

Page 10: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Benchmark Risk Premium

2018-Aug-07 [email protected] 10

Layer (a, a+h]

Annual

Average

Expected Loss

Benchmark

Reinsurance

Premium

Risk Load

%

Benchmark

Reinsurance

Premium

Risk Load

%

10M XS 60M 761,108$ 1,852,994$ 143% 1,077,333$ 42%

10M XS 70M 427,442$ 1,297,440$ 204% 697,638$ 63%

10M XS 80M 222,575$ 895,395$ 302% 441,623$ 98%

10M XS 90M 107,803$ 616,570$ 472% 276,469$ 156%

10M XS 100M 53,950$ 447,624$ 730% 183,368$ 240%

10M XS 110M 23,289$ 313,642$ 1247% 115,297$ 395%

10M XS 120M 9,438$ 224,046$ 2274% 73,507$ 679%

10M XS 130M 3,201$ 155,061$ 4744% 44,540$ 1291%

10M XS 140M 1,500$ 124,731$ 8215% 32,819$ 2088%

10M XS 150M 1,389$ 121,718$ 8661% 31,731$ 2184%

10M XS 160M 473$ 61,024$ 12810% 14,920$ 3056%Combined

110M XS 60M 1,612,167$ 6 ,110,246$ 279% 2,989,243$ 85%

Hard Market; Wang

Transform (lambda=0.45,

def=5)

Soft Market; Wang

Transform (lambda=0.1 ,

def=9)

Page 11: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

CAT Pool: ARC (testing year 3)

• In 2016, ARC Ltd. paid out US$ 8.1 million to Malawi in support of approximately 810,000 people impacted by a drought.

• Initially, Malawi’s parametric drought insurance policy did not trigger a pay-out, because ARC Ltd.’s AfricaRiskView (ARV) model indicated a low number of people affected by the drought.

• However, the Government of Malawi estimated a much higher number of people impacted by the drought.

2018-Aug-07 [email protected] 11

Page 12: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

CAT Pool: ARC (testing year 3)

• It turned out that farmers had shifted to planting maize with a 90-day growing period, compared to the maize variety with a growing period of 120-140 days as assumed in the customisation of Malawi’s model.

• The rainfall pattern in 2015/16 was particularly unfavourable to the shorter cycle maize.

• ARC re-calibrated the AfricaRiskView model to correct this crop assumption, resulting in a model outcome of US$ 8.1 million pay-out under the revised policy to the Government of Malawi.

2018-Aug-07 [email protected] 12

Page 13: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Lessons Learned from the CAT Pool - Africa Risk Capacity

• Affordability Gap

• Parametric trigger and “basis” risk

• Need to measure “expectation gap” to avoid disappointment

• Communicate about “Basis risk” in parametric modeling

2018-Aug-07 [email protected] 13

Page 14: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Florida Hurricane Catastrophe Fund (formation)

• With Hurricane Andrew in 1992 as a catalyst for its establishment, the initial motivation behind the creation of the FHCF was provision of catastrophe reinsurance cover.

• Right from the beginning, the objective of the FHCF was to keep premiums affordable across the board and to have policyholders in low-risk areas cross-subsidize those at higher risk.

2018-Aug-07 [email protected] 14

Page 15: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

FHCF in 2004-5 (testing times)

• In 2004 and 2005, Florida was hit by four and three hurricanes, respectively. As of December 31, 2015, the FHCF had paid over US$ 9.3 billion in loss reimbursements to its participating insurers.

• The losses associated with the 2005 hurricanes produced pay-outs that exceeded the FHCF’s available cash. To address the cash shortfall, FHCF issued US$ 1.35 billion in tax-exempt post-event revenue bonds with a maturity date of 2012. This was the first time that the FHCF had to issue bonds.

2018-Aug-07 [email protected] 15

Page 16: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

FHCF in 2016 (proven success)

• In 2016, the maximum statutory single season capacity of the FHCF was US$ 17 billion. With an accumulated cash balance of US$ 13.8 billion.

• The FHCF has low operating expenses and a relatively small staff of 13 full time employees.

2018-Aug-07 [email protected] 16

Page 17: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Lessons Learned from FHCF

• Statewide political support – essential for Florida’s economic prosperity

• Political homogeneity (single state, rather than multi-state pool with AL and LA)

• Lower capital requirements than commercial insurers

• Resulted in significant savings for residents

• Ability to impose post-event assessment (time diversification) added operational flexibility

2018-Aug-07 [email protected] 17

Page 18: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Research Findings of the NTU-MASCyber Risk Management Project

Tripartite Collaboration

• Monetary Authority of

Singapore

• Cyber Security Agency

• Nanyang Technological

University

• SCOR; Aon; MSIG; Lloyd’s;

TransRe;

• (Geneva Association; Verizon) Launched in May 2016 (to be completed in 2019)

182018-Aug-07 [email protected]

Page 19: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Attack surface“vulnerability”

Knowledge Set a relative concept:

1) WHO

2) What

• actually knows

• should know but not know

• Unknown unknown

2018-Aug-07 [email protected] 19

Page 20: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Security Investment: 1) “y” in knowledge, 2) “z” in risk reduction

2018-Aug-07 [email protected] 20

Page 21: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Optimal Security Investments

• Invest amount “y” in knowledge, and amount “z” in risk reduction measures, the data breach probability

𝑣 𝑧 𝑦 = 𝑣(𝑧0|𝑦0)(𝑦𝑦0

)( 𝑧𝑧0)

• Optimal investment is proportional: 𝒚∗

𝒛∗=𝜶

𝜷

Reference: Wang, Shaun, “Knowledge Set of Attack Surface and Cybersecurity Rating for Firms in a Supply Chain” (November 3, 2017). Available at SSRN: https://ssrn.com/abstract=3064533

2018-Aug-07 [email protected] 21

Page 22: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Economics of Catastrophe Pool for Asian Countries

• Risk Knowledge and Risk Awareness

• Risk Reduction (adaptation, prevention and emergency response)

• Risk Pooling and Transfer

2018-Aug-07 [email protected] 22

Asset Growth

Income Generation

Wealth Creation

Risk Reduction

Risk Transfer

Wealth protection

Page 23: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

Use CAT Pool as Catalyst for Achieving Multiple Economic Development Goals

1. Adapting to Climate Change2. Assisting Infrastructure Development3. Reducing Poverty

• The Role of International Aid (G7, Development banks)➢To create the right incentives on the recipients ➢To embed “financial aid” with “catastrophe pooling

experience”

• To work with finance ministries and the global insurance industry

2018-Aug-07 [email protected] 23

Page 24: Lessons Learned from International Catastrophe Poolsicrm.ntu.edu.sg/NewsnEvents/Doc/ICRM_Sym/Documents/9thICRM/P… · Lessons Learned from International Catastrophe Pools - Financing

The Speaker Acknowledges Collaborators and Supporters of Catastrophe Risk Pool Research

Contact:

[email protected]