Letting of January 04, 2019 Letting Call: 1901 001 Low Bid: $378,085.25 Project: HSIP 24000-202892 Engineer Estimate: $397,103.00 Local Agreement: 18-5495 Pct Over/Under Estimate: -4.79 % Start Date: May 1, 2019 Completion Date: June 7, 2019 Description: 2.39 mi of guardrail replacement on various routes, Emmet County. This is a Local Agency project. No DBE participation required Bidder As-Submittted Dale Dukes & Sons, Inc. $378,085.25 Nashville Construction Company $391,957.40 Action Traffic Maintenance, Inc. $405,385.45 G & J Site Solutions, Inc. $440,204.85 RMD Holdings, Ltd. $469,597.27 Total Number of Bidders: 5

Upload: others

Post on 28-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Letting of January 04, 2019

    Letting Call: 1901 001 Low Bid: $378,085.25

    Project: HSIP 24000-202892 Engineer Estimate: $397,103.00

    Local Agreement: 18-5495 Pct Over/Under Estimate: -4.79 %

    Start Date: May 1, 2019 Completion Date: June 7, 2019

    Description:

    2.39 mi of guardrail replacement on various routes, Emmet County. This is a Local Agency project.

    No DBE participation required

    Bidder As-SubmitttedDale Dukes & Sons, Inc. $378,085.25Nashville Construction Company $391,957.40Action Traffic Maintenance, Inc. $405,385.45G & J Site Solutions, Inc. $440,204.85RMD Holdings, Ltd. $469,597.27

    Total Number of Bidders: 5

  • Letting of January 04, 2019

    Letting Call: 1901 002 Low Bid: $11,837,630.55

    Project: M 63022-119805 , ETC Engineer Estimate: $10,373,853.26

    Local Agreement: Pct Over/Under Estimate: 14.11 %

    Start Date: April 15, 2019 Completion Date: June 1, 2020

    Description:

    10.14 mi of hot mix asphalt cold milling and resurfacing, concrete patching, detail 7 repairs, signage, pavement markings and rehabilitation of 2 structures consisting of deep overlay, barrier replacement, beam and deck replacement (one span) and substructure repairs on M-5 from 13 Mile Road south to 8 Mile Road in the cities of Novi, Farmington and Farmington Hills, Oakland County. This project includes a 5 year materials and workmanship pavement warranty and a 2 year performance warranty for the concrete surface coating.

    3.00 % DBE participation required

    Bidder As-SubmitttedCadillac Asphalt, L.L.C. $11,837,630.55Ajax Paving Industries, Inc. $12,083,888.88

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 003 Low Bid: $2,210,390.07

    Project: STG 63051-118285 Engineer Estimate: $2,390,052.16

    Local Agreement: 18-5273 Pct Over/Under Estimate: -7.52 %

    Start Date: 10 days after award Completion Date: June 1, 2020

    Description:

    Traffic signal modernization and sidewalk ramp upgrades at 7 locations along M-1 (Woodward Avenue) and US-24 (Telegraph Road) in the cities of Pleasant Ridge, Royal Oak and Birmingham, Oakland County.

    3.00 % DBE participation required

    Bidder As-SubmitttedRauhorn Electric, Inc. $2,210,390.07Dan's Excavating, Inc. $2,212,078.96J. Ranck Electric, Inc. $2,215,657.36Motor City Electric Utilities Company $2,350,198.81

    Total Number of Bidders: 4

  • Letting of January 04, 2019

    Letting Call: 1901 004 Low Bid: $495,979.62

    Project: M 13062-200395 Engineer Estimate: $599,523.90

    Local Agreement: Pct Over/Under Estimate: -17.27 %

    Start Date: September 16, 2019 Completion Date: November 29, 2019

    Description:

    2.52 mi of hot mix asphalt cold milling and overlay and pavement markings on M-96 from Eden Street to I-69 in the

    city of Marshall, Calhoun County. This project includes a 3 year materials and workmanship pavement warranty.

    No DBE participation required

    Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $495,979.62Michigan Paving and Materials Company $561,910.71

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 005 Low Bid: $72,000.00

    Project: FM 60111-205279 Engineer Estimate: $111,400.00

    Local Agreement: Pct Over/Under Estimate: -35.37 %

    Start Date: February 25, 2019 Completion Date: 14 Calendar Days

    Description:

    Tree Clearing and Building Removal, Parcel 14 Obstruction Removal at the Atlanta Municipal Airport, city of Atlanta, Montmorency County.

    No DBE participation required

    Bidder As-SubmitttedMacArthur Construction, Inc. $72,000.00Kivisto Tree Service, LLC $76,950.00Elmer's Crane and Dozer, Inc. $96,827.50Mead Bros. Excavating Inc. $106,800.00Wilson Trucking and Excavating LLC $157,389.85Homrich Wrecking, Inc. $297,950.00

    Total Number of Bidders: 6

  • Letting of January 04, 2019

    Letting Call: 1901 006 Low Bid: $17,766,995.41

    Project: NH 63041-111374 Engineer Estimate: $16,656,386.67

    Local Agreement: 18-5517 Pct Over/Under Estimate: 6.67 %

    Start Date: 10 days after award Completion Date: September 30, 2021

    Description:

    3.20 mi of hot mix asphalt cold milling, resurfacing, shared use path and reconstruction, tree removal, earthwork, shoulders, aggregate base, drainage, concrete curb, gutter, driveway, sidewalk and ramps, signing, signals and pavement markings on M-59 from Tipisco Lake Road to Milford Road, Oakland County. This project contains two 5 year material and workmanship pavement warranties.

    6.00 % DBE participation required

    Bidder As-SubmitttedDan's Excavating, Inc. $17,766,995.41Toebe Construction LLC $18,919,420.26Angelo Iafrate Construction Company $18,935,869.14Fonson Company, Inc. $20,250,614.54Zito Construction $22,244,602.78

    Total Number of Bidders: 5

  • Letting of January 04, 2019

    Letting Call: 1901 007 Low Bid: $6,479,283.96

    Project: NH 20021-116416 Engineer Estimate: $6,140,620.25

    Local Agreement: Pct Over/Under Estimate: 5.52 %

    Start Date: April 15, 2019 Completion Date: October 4, 2019

    Description:

    6.08 mi of hot mix asphalt base crushing, shaping and resurfacing with miscellaneous safety and drainage improvements on M-72 from the Kalkaska/Crawford county line to M-93, city of Grayling, Kalkaska and Crawford Counties. This project includes two 5 year materials and workmanship pavement warranties.

    3.00 % DBE participation required

    Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $6,479,283.96Payne & Dolan Inc. $6,616,377.48

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 008 Low Bid: $6,109,966.36

    Project: ST 68012-123278 Engineer Estimate: $6,137,201.56

    Local Agreement: Pct Over/Under Estimate: -0.44 %

    Start Date: 10 days after award Completion Date: October 4, 2019

    Description:

    7.63 mi of hot mix asphalt base crushing, shaping and resurfacing, shoulder trenching, earthwork, drainage, guardrail and pavement markings on M-33 from McKinley Road to south of Popps Road and from north of Cherry Creek Road to west of Fairview schools and on M-33 north of James Drive to north of Cherry Creek Road, Oscoda County. This project includes a 3 year materials and workmanship pavement warranty and 5 year materials and workmanship pavement warranty.

    3.00 % DBE participation required

    Bidder As-SubmitttedBolen Asphalt Paving, Inc. $6,109,966.36Rieth-Riley Construction Co., Inc. $6,136,420.55Pyramid Paving and Contracting Co. $6,560,798.47

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 009 Low Bid: $1,432,442.50

    Project: NH 73073-132121 Engineer Estimate: $1,182,857.93

    Local Agreement: Pct Over/Under Estimate: 21.10 %

    Start Date: April 15, 2019 Completion Date: July 12, 2019

    Description:

    1.83 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, drainage and pavement markings on M-58 from Lawndale Road to just east of Avalon Avenue, city of Saginaw, Saginaw County. This project includes a 3 year materials and workmanship pavement warranty.

    3.00 % DBE participation required

    Bidder As-SubmitttedPyramid Paving and Contracting Co. $1,432,442.50Ace-Saginaw Paving Company $1,550,896.26

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 010 Low Bid: $426,135.54

    Project: HSIP 41043-113685 Engineer Estimate: $396,068.64

    Local Agreement: Pct Over/Under Estimate: 7.59 %

    Start Date: June 17, 2019 Completion Date: November 15, 2019

    Description:

    0.43 mi of hot mix asphalt left turn lane storage and taper, concrete curb, gutter, sidewalk, spillway, culvert, drainage, safety improvements and pavement marking on M-21 at Carl Drive, Kent County. This is a Small Business Program project. Only those approved by MDOT as a Small Business may be eligible to bid as a prime contractor.

    No DBE participation required

    Bidder As-SubmitttedWeick Bros., Inc. $426,135.54Epic Excavating, Inc. $429,782.54C L Trucking & Excavating, LLC $432,816.79Nashville Construction Company $443,947.59Wonsey Tree Service, Inc. $446,444.89Nagel Construction, Inc. $479,752.29

    Total Number of Bidders: 6

  • Letting of January 04, 2019

    Letting Call: 1901 011 Low Bid:

    Project: 41081-130935pp Engineer Estimate:

    Local Agreement: Pct Over/Under Estimate:

    Start Date: 10 days after award Completion Date: June 30, 2019

    Description:

    2.05 mi of hot mix asphalt shared use path, earthwork, restoration and pavement markings on Caledonia Trails from 84th Street to Paul Henry Trail, Kent County. This is a Local Agency project.

    5.00 % DBE participation required

    This proposal has been postponed.

  • Letting of January 04, 2019

    Letting Call: 1901 012 Low Bid: $670,327.89

    Project: TAU 63459-132568-2 Engineer Estimate: $737,789.25

    Local Agreement: 18-5182 Pct Over/Under Estimate: -9.14 %

    Start Date: February 1, 2019 Completion Date: November 2, 2019

    Description:

    Construction of a non-motorized steel prefabricated truss bridge, drainage and cofferdams on Paint Creek Trail from Dutton Road to Silverbell Road, Oakland County. This is a Local Agency project.

    5.00 % DBE participation required

    Bidder As-SubmitttedC. A. Hull Co., Inc. $670,327.89Z Contractors, Inc. $673,032.17Trojan Development Company, Inc. $707,499.39L.J. Construction, Inc. $739,443.00Dan's Excavating, Inc. $770,655.35Grand River Construction, Inc. $829,717.19

    Total Number of Bidders: 6

  • Letting of January 04, 2019

    Letting Call: 1901 013 Low Bid: $753,447.05

    Project: TAL 45071-200823-2 Engineer Estimate: $722,224.75

    Local Agreement: 18-5200 Pct Over/Under Estimate: 4.32 %

    Start Date: 10 days after award Completion Date: 40 Working Days

    Description:

    0.37 mi of concrete curb, gutter, sidewalks and ramps, lighting, drainage, signing and pavement markings on M-22 (St. Joseph Street) from Grove Street to Broadway/Cedar Street in the village of Suttons Bay, Leelanau County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedEpic Excavating, Inc. $753,447.05The Isabella Corporation $767,774.35Elmer's Crane and Dozer, Inc. $789,991.50

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 014 Low Bid: $612,467.10

    Project: STUL 13000-130186 Engineer Estimate: $681,418.50

    Local Agreement: 18-5501 Pct Over/Under Estimate: -10.12 %

    Start Date: June 10, 2019 Completion Date: August 23, 2019

    Description:

    2.60 mi of hot mix asphalt resurfacing with paved shoulders on North Avenue from Halbert Road northward to the north Calhoun County limits, Calhoun County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedLakeland Asphalt Corporation $612,467.10Michigan Paving and Materials Company $699,277.60Rieth-Riley Construction Co., Inc. $721,801.50

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 015 Low Bid: $576,767.46

    Project: HRRR 40000-203484 Engineer Estimate: $661,100.50

    Local Agreement: 18-5511 Pct Over/Under Estimate: -12.76 %

    Start Date: 10 days after award Completion Date: July 1, 2019

    Description:

    1.19 mi of hot mix asphalt crushing, shaping, widening and resurfacing, aggregate base and pavement markings on West Plum Valley Road from Aarwood Road to Rapid City Road, Kalkaska County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedJ & N Construction, LLC $576,767.46Elmer's Crane and Dozer, Inc. $592,718.00Payne & Dolan Inc. $620,778.00Rieth-Riley Construction Co., Inc. $637,470.50M & M Excavating Company $671,396.84

    Total Number of Bidders: 5

  • Letting of January 04, 2019

    Letting Call: 1901 016 Low Bid: $509,709.50

    Project: STUL 13025-133175 Engineer Estimate: $552,948.45

    Local Agreement: 18-5502 Pct Over/Under Estimate: -7.82 %

    Start Date: June 10, 2019 Completion Date: September 6, 2019

    Description:

    1.98 mi of hot mix asphalt crushing, shaping and resurfacing and pavement markings on West Drive from Verona Road to F Drive North and on North Drive from West Drive to US Highway 27, Calhoun County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedLakeland Asphalt Corporation $509,709.50Michigan Paving and Materials Company $568,843.20Rieth-Riley Construction Co., Inc. $604,017.40

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 017 Low Bid: $398,722.00

    Project: TAU 82457-132537-2 Engineer Estimate: $415,744.25

    Local Agreement: 18-5315 Pct Over/Under Estimate: -4.09 %

    Start Date: 10 days after award Completion Date: September 15, 2019

    Description:

    0.14 mi of hot mix asphalt shared-use path, steel prefabricated truss bridge, concrete curb, gutter, sidewalk and ramps, piles, cofferdams and pavement markings along Cherry Hill Road west of Ridge Road, Wayne County. This is a Local Agency project.

    4.00 % DBE participation required

    Bidder As-SubmitttedL.J. Construction, Inc. $398,722.00Warren Contractors & Development, Inc. $415,689.60Dan's Excavating, Inc. $417,477.42Z Contractors, Inc. $425,106.01Grand River Construction, Inc. $434,229.29C. A. Hull Co., Inc. $476,994.82

    Total Number of Bidders: 6

  • Letting of January 04, 2019

    Letting Call: 1901 018 Low Bid: $352,519.01

    Project: BHT 73000-133003-2 , ETC Engineer Estimate: $338,155.00

    Local Agreement: 18-5173 Pct Over/Under Estimate: 4.25 %

    Start Date: April 1, 2019 Completion Date: June 14, 2019

    Description:

    Bridge deck patching and epoxy healer/sealer of bridge deck on Johnson Street, Court Street, Center Street and Holland Avenue over the Saginaw River, Saginaw County. This is a Local Agency Project.

    No DBE participation required

    Bidder As-SubmitttedC. A. Hull Co., Inc. $352,519.01Anlaan Corporation $368,619.20Grand River Construction, Inc. $477,705.00Milbocker and Sons, Inc. $602,287.00

    Total Number of Bidders: 4

  • Letting of January 04, 2019

    Letting Call: 1901 019 Low Bid: $175,621.00

    Project: HSIP 60021-203272 Engineer Estimate: $201,078.00

    Local Agreement: 18-5496 Pct Over/Under Estimate: -12.66 %

    Start Date: May 1, 2019 Completion Date: June 28, 2019

    Description:

    Guardrail upgrades on various routes, Montmorency County. This is a Local Agency project.

    No DBE participation required

    Bidder As-SubmitttedDale Dukes & Sons, Inc. $175,621.00Action Traffic Maintenance, Inc. $176,655.18Nashville Construction Company $191,621.46G & J Site Solutions, Inc. $219,087.64RMD Holdings, Ltd. $255,974.60

    Total Number of Bidders: 5

  • Letting of January 04, 2019

    Letting Call: 1901 020 Low Bid: $439,722.30

    Project: STUL 58000-201833-2 Engineer Estimate: $378,852.50

    Local Agreement: 18-5294 Pct Over/Under Estimate: 16.07 %

    Start Date: 10 days after award Completion Date: June 30, 2019

    Description:

    0.22 mi of hot mix asphalt resurfacing, spot base repair, concrete curb, gutter, sidewalk, sidewalk ramps, drainage structure adjustments and pavement markings on West 1st Street from Front Street to Washington Street in the city of Monroe, Monroe County. This is a Local Agency project.

    4.00 % DBE participation required

    Bidder As-SubmitttedC & D Hughes, Inc. $439,722.30Gibraltar Construction Company $441,840.20Florence Cement Company $502,085.62

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 021 Low Bid: $147,978.00

    Project: HRRR 30000-200261 Engineer Estimate: $199,087.00

    Local Agreement: 18-5507 Pct Over/Under Estimate: -25.67 %

    Start Date: 10 days after award Completion Date: November 15, 2019

    Description:

    3.01 mi of tree removal and clearing along Lake Pleasant Road between Peterson Road and Mauck Road, Hillsdale County. This is a Local Agency project.

    No DBE participation required

    Bidder As-SubmitttedKivisto Tree Service, LLC $147,978.00Heinz Tree Service, Inc. $175,020.00Wonsey Tree Service, Inc. $181,423.41Treeworks, Inc. $195,843.00J. Ranck Electric, Inc. $243,991.50Homer Tree Service, Inc. $255,988.75

    Total Number of Bidders: 6

  • Letting of January 04, 2019

    Letting Call: 1901 022 Low Bid: $3,101,357.35

    Project: STL 21000-129707 , ETC Engineer Estimate: $3,396,175.10

    Local Agreement: 18-5508 Pct Over/Under Estimate: -8.68 %

    Start Date: 10 days after award Completion Date: August 2, 2019

    Description:

    17.40 mi of hot mix asphalt base crushing, shaping and resurfacing, guardrail and pavement markings on Forest Highway 13 north of US-2, Delta County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedBacco Construction Company $3,101,357.35Payne & Dolan Inc. $3,212,495.45

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 023 Low Bid: $263,109.70

    Project: STL 11141-120015 Engineer Estimate: $313,807.00

    Local Agreement: 18-5505 Pct Over/Under Estimate: -16.16 %

    Start Date: 10 days after award Completion Date: June 28, 2019

    Description:

    0.30 mi of hot mix asphalt base crushing, shaping and resurfacing, aggregate shoulders, concrete driveway, curb and gutter, drainage and pavement markings on Lemon Creek Road from First Street to Ruggles Road in the village of Baroda, Berrien County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $263,109.70Michigan Paving and Materials Company $287,208.10Kamminga & Roodvoets, Inc. $319,273.00

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 024 Low Bid: $2,177,845.00

    Project: STUL 73000-130430 Engineer Estimate: $2,399,890.60

    Local Agreement: 18-5514 Pct Over/Under Estimate: -9.25 %

    Start Date: May 1, 2019 Completion Date: October 5, 2019

    Description:

    0.58 mi of hot mix asphalt reconstruction, concrete driveway, curb, gutter, sidewalk and ramps, aggregate base, water main, drainage and pavement markings on Mackinaw Street from Congress Avenue to State Street (M-58) in the city of Saginaw, Saginaw County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedRohde Bros. Excavating, Inc. $2,177,845.00Angelo Iafrate Construction Company $2,266,454.56Champagne and Marx Excavating, Inc. $2,319,333.30Crawford Contracting, Inc. $2,327,993.61Malley Construction, Inc. $2,351,667.67Tri-City Groundbreakers, Inc. $2,373,329.00McGuirk Sand-Gravel, Inc. $2,374,463.50L. D'Agostini & Sons, Inc. $2,383,110.24Zito Construction $2,497,928.86

    Total Number of Bidders: 9

  • Letting of January 04, 2019

    Letting Call: 1901 025 Low Bid: $795,652.65

    Project: STU 41000-130697 Engineer Estimate: $871,562.95

    Local Agreement: 18-5510 Pct Over/Under Estimate: -8.71 %

    Start Date: April 15, 2019 Completion Date: June 14, 2019

    Description:

    0.89 mi of hot mix asphalt cold milling and resurfacing, concrete bridge approach, guardrail and pavement

    markings on Kraft Avenue SE from 36th Street to 28th Street, Kent County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $795,652.65Superior Asphalt, Inc. $850,550.00Michigan Paving and Materials Company $901,651.95

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 026 Low Bid: $926,730.56

    Project: MCS 14000-129338 Engineer Estimate: $850,096.00

    Local Agreement: 18-5516 Pct Over/Under Estimate: 9.01 %

    Start Date: 10 days after award Completion Date: September 27, 2019

    Description:

    Bridge reconstruction with 33 inch prestressed concrete box beams, concrete deck, curb, gutter, approach, cofferdams, piling, guardrail and pavement markings on Sink Road over the Dowagiac River, Cass County. This is a Local Agency project.

    No DBE participation required

    Bidder As-SubmitttedJ. E. Kloote Contracting, Inc. $926,730.56Grand River Construction, Inc. $943,390.53Hardman Construction, Inc. $977,958.07Milbocker and Sons, Inc. $1,039,511.80

    Total Number of Bidders: 4

  • Letting of January 04, 2019

    Letting Call: 1901 027 Low Bid: $567,092.22

    Project: STUL 56000-129763-2 Engineer Estimate: $535,475.37

    Local Agreement: 18-5513 Pct Over/Under Estimate: 5.90 %

    Start Date: May 28, 2019 Completion Date: September 20, 2019

    Description:

    1.16 mi of hot mix asphalt cold milling and resurfacing, shoulder widening, concrete curb, gutter, sidewalk and ramps, drainage and pavement markings on Saginaw Road from Oak Street to Pinesboro Drive in the village of Sanford, Midland County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedCentral Asphalt, Inc. $567,092.22Pyramid Paving and Contracting Co. $614,176.63Ace-Saginaw Paving Company $697,617.86

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 028 Low Bid: $219,134.57

    Project: EDA 82000-200545 Engineer Estimate: $212,251.00

    Local Agreement: 18-5499 Pct Over/Under Estimate: 3.24 %

    Start Date: April 15, 2019 Completion Date: June 28, 2019

    Description:

    0.01 mi of intersection improvement including traffic signal, sidewalk ramps and pavement markings on Sheldon Road at Goldsmith Road in the city of Plymouth, Wayne County. This is a Local Agency project.

    No DBE participation required

    Bidder As-SubmitttedJ. Ranck Electric, Inc. $219,134.57Dan's Excavating, Inc. $219,809.27Wright Electric Company, Inc. $241,897.55Motor City Electric Utilities Company $243,444.07Rauhorn Electric, Inc. $245,789.56

    Total Number of Bidders: 5

  • Letting of January 04, 2019

    Letting Call: 1901 029 Low Bid: $301,381.76

    Project: TA 70000-200804 Engineer Estimate: $307,532.50

    Local Agreement: 18-5503 Pct Over/Under Estimate: -2.00 %

    Start Date: April 1, 2019 Completion Date: June 28, 2019

    Description:

    0.60 mi of hot mix asphalt shared use path, concrete curb, gutter, culverts, drainage and pavement markings along 42nd Avenue from Pierce Street to the Grand Ravines Park Trailhead, Ottawa County. This is a Local Agency project. This is a Small Business Program project. Only those approved by MDOT as a Small Business may be eligible to bid as a prime contractor.

    No DBE participation required

    Bidder As-SubmitttedStein Construction Company $301,381.76Weick Bros., Inc. $319,890.50Wonsey Tree Service, Inc. $333,294.50Epic Excavating, Inc. $334,750.00C L Trucking & Excavating, LLC $363,251.75

    Total Number of Bidders: 5

  • Letting of January 04, 2019

    Letting Call: 1901 030 Low Bid: $2,697,438.42

    Project: M 79062-201404 , ETC Engineer Estimate: $2,743,143.74

    Local Agreement: Pct Over/Under Estimate: -1.67 %

    Start Date: July 8, 2019 Completion Date: August 30, 2019

    Description:

    12.33 mi of hot mix asphalt cold milling and single course resurfacing with joint repairs, concrete curb, gutter, sidewalk ramp and pavement markings on M-81 from Cass City Road to the village of Cass City and on M-81 from Deckerville Road to Cass City Road in the village of Cass City, Tuscola County. This project includes a 3 year materials and workmanship pavement warranty.

    3.00 % DBE participation required

    Bidder As-SubmitttedPyramid Paving and Contracting Co. $2,697,438.42Ace-Saginaw Paving Company $2,705,909.09

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 031 Low Bid: $790,707.83

    Project: ST 78054-126093 Engineer Estimate: $819,735.74

    Local Agreement: Pct Over/Under Estimate: -3.54 %

    Start Date: March 4, 2019 Completion Date: September 25, 2021

    Description:

    0.08 mi of bridge removal, placement of embankment, steel sheet piling and roadway construction on M-66 over New York Central Railroad (abandoned), St. Joseph County.

    3.00 % DBE participation required

    Bidder As-SubmitttedNashville Construction Company $790,707.83E.T. MacKenzie Company $825,388.08Hoffman Bros., Inc. $855,481.49Milbocker and Sons, Inc. $900,464.80Kalin Construction Co., Inc. $926,064.95J. E. Kloote Contracting, Inc. $939,603.54

    Total Number of Bidders: 6

  • Letting of January 04, 2019

    Letting Call: 1901 032 Low Bid: $877,242.10

    Project: ST 52011-130229 Engineer Estimate: $762,127.18

    Local Agreement: Pct Over/Under Estimate: 15.10 %

    Start Date: 10 days after award Completion Date: October 25, 2019

    Description:

    Bridge rehabilitation including replacement of expansion joint, drain replacement, super and substructure repairs and pier overcasting on M-95 over Trout Creek Falls and Michigamme River, Marquette County.

    No DBE participation required

    Bidder As-SubmitttedAssociated Constructors, LLC $877,242.10Zenith Tech, Inc. $1,223,244.20Hebert Construction Co. $1,497,793.39Grand River Construction, Inc. $1,499,789.33C. A. Hull Co., Inc. $1,689,404.20

    Total Number of Bidders: 5

  • Letting of January 04, 2019

    Letting Call: 1901 033 Low Bid: $681,130.33

    Project: NH 02041-128724 Engineer Estimate: $619,697.01

    Local Agreement: Pct Over/Under Estimate: 9.91 %

    Start Date: May 29, 2019 Completion Date: October 31, 2019

    Description:

    Bridge rehabilitation including shallow overlay, concrete deck, railing, patching, curb, gutter and approach, joints, riprap and pavement markings on M-28 over the Sand River, Alger County.

    No DBE participation required

    Bidder As-SubmitttedAssociated Constructors, LLC $681,130.33Grand River Construction, Inc. $839,953.44Anlaan Corporation $1,099,254.30C. A. Hull Co., Inc. $1,144,771.30

    Total Number of Bidders: 4

  • Letting of January 04, 2019

    Letting Call: 1901 034 Low Bid: $4,543,769.55

    Project: NH 03112-200589 Engineer Estimate: $4,434,907.08

    Local Agreement: Pct Over/Under Estimate: 2.45 %

    Start Date: May 1, 2019 Completion Date: August 30, 2019

    Description:

    7.63 mi of hot mix asphalt cold milling and hot mix asphalt overlay, concrete pavement repairs, guardrail and pavement markings on US-131 from south of 133rd Avenue north to the Allegan/Kent county line including ramps at the 135th Avenue and 142nd Avenue interchanges in the city of Wayland, Allegan County. This project includes a 3 year materials and workmanship pavement warranty.

    3.00 % DBE participation required

    Bidder As-SubmitttedMichigan Paving and Materials Company $4,543,769.55Rieth-Riley Construction Co., Inc. $4,835,340.00

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 035 Low Bid: $3,864,862.38

    Project: M 74073-201338 , ETC Engineer Estimate: $3,272,000.61

    Local Agreement: Pct Over/Under Estimate: 18.12 %

    Start Date: April 15, 2019 Completion Date: June 29, 2019

    Description:

    15.69 mi of hot mix asphalt cold milling and resurfacing and Cherry Creek bridge waterproofing, joint repairs and overlay on M-25 from Lynn Boulevard north to French Line Road and from the north village limits of Port Sanilac north to Deckerville Road, Sanilac County. This project includes a 3 year materials and workmanship pavement warranty.

    No DBE participation required

    Bidder As-SubmitttedAce-Saginaw Paving Company $3,864,862.38

    Total Number of Bidders: 1

  • Letting of January 04, 2019

    Letting Call: 1901 036 Low Bid: $3,191,923.85

    Project: M 71021-131749 Engineer Estimate: $3,092,340.27

    Local Agreement: Pct Over/Under Estimate: 3.22 %

    Start Date: July 8, 2019 Completion Date: September 20, 2019

    Description:

    18.96 mi of hot mix asphalt cold milling and single course overlay on M-68 from Glasier Road to Curtis Road and on M-211 from Cedar Street to Bonz Beach Highway, Presque Isle County. This project includes a 3 year materials and workmanship pavement warranty.

    No DBE participation required

    Bidder As-SubmitttedBolen Asphalt Paving, Inc. $3,191,923.85Rieth-Riley Construction Co., Inc. $3,355,219.81Payne & Dolan Inc. $3,492,050.36

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 037 Low Bid: $2,574,620.96

    Project: M 49041-132036 Engineer Estimate: $2,447,201.48

    Local Agreement: Pct Over/Under Estimate: 5.21 %

    Start Date: 10 days after award Completion Date: September 15, 2019

    Description:

    12.27 mi of hot mix asphalt cold milling, resurfacing and shoulder widening, shoulder aggregate and pavement markings on M-134 from Hilltop Road to the east Mackinac/Chippewa county line, Mackinac and Chippewa Counties. This project includes a 3 year materials and workmanship pavement warranty.

    No DBE participation required

    Bidder As-SubmitttedBacco Construction Company $2,574,620.96Payne & Dolan Inc. $2,615,748.81Rieth-Riley Construction Co., Inc. $3,275,000.00

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 038 Low Bid: $2,459,497.11

    Project: CM 11052-127448 , ETC Engineer Estimate: $2,380,598.75

    Local Agreement: Pct Over/Under Estimate: 3.31 %

    Start Date: April 15, 2019 Completion Date: June 14, 2019

    Description:

    7.25 mi of hot mix asphalt cold milling and resurfacing, pavement markings, signing, passing flares installation including concrete curb and gutter and drainage on M-139 from south of Hinchman Road to north of the St. Joseph River and on M-43 from west of the westerly 16th Avenue approach to east of the easterly 16th Avenue approach, Berrien and Van Buren Counties. This project includes a 3 year materials and workmanship pavement warranty.

    4.00 % DBE participation required

    Bidder As-SubmitttedMichigan Paving and Materials Company $2,459,497.11Rieth-Riley Construction Co., Inc. $2,499,961.85

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 039 Low Bid: $2,270,883.35

    Project: ST 80041-200632 Engineer Estimate: $2,271,007.02

    Local Agreement: Pct Over/Under Estimate: -0.01 %

    Start Date: May 20, 2019 Completion Date: June 28, 2019

    Description:

    13.65 mi of paver placed surface seal, concrete curb, gutter, sidewalk and ramp upgrades, shoulder aggregate and pavement markings on M-43 from the west city limits of Bangor to east of M-40 in the city of Bangor, Van Buren County. This project includes a 3 year pavement performance warranty.

    3.00 % DBE participation required

    Bidder As-SubmitttedMichigan Paving and Materials Company $2,270,883.35Rieth-Riley Construction Co., Inc. $2,349,558.72

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 040 Low Bid: $1,646,782.68

    Project: ST 42012-201151 Engineer Estimate: $1,675,726.38

    Local Agreement: Pct Over/Under Estimate: -1.73 %

    Start Date: June 17, 2019 Completion Date: 35 Working Days

    Description:

    17.23 mi of chip seal, double, warranty, overband crackfill, lane, gravel shoulders, berm grading and pavement markings on US-41 from north of 1st Street to north of Lac Labelle Road, Keweenaw County. This project includes a 2 year pavement performance warranty.

    No DBE participation required

    Bidder As-SubmitttedFahrner Asphalt Sealers, L.L.C. $1,646,782.68Pitlik & Wick, Inc. $1,711,301.68Pavement Maintenance Systems, LLC $2,083,034.20

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 041 Low Bid: $1,548,759.26

    Project: M 08071-202999 Engineer Estimate: $1,481,720.42

    Local Agreement: Pct Over/Under Estimate: 4.52 %

    Start Date: June 17, 2019 Completion Date: August 2, 2019

    Description:

    7.03 mi of hot mix asphalt cold milling, single course resurfacing and detail 8 joints and pavement markings on M- 89 from Doster Road to the south Barry county line and on M-78 from M-66 to west Pease Road, Calhoun, Barry and Eaton Counties. This project includes two 3 year materials and workmanship pavement warranties.

    No DBE participation required

    Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $1,548,759.26Michigan Paving and Materials Company $1,555,059.75

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 042 Low Bid: $1,324,513.82

    Project: ST 68042-203951 Engineer Estimate: $1,391,237.10

    Local Agreement: Pct Over/Under Estimate: -4.80 %

    Start Date: July 8, 2019 Completion Date: September 30, 2019

    Description:

    22.29 mi of overband crack fill, single course chip seal and fog seal and pavement markings on M-72 from east of Maple Drive to east of Crooked Lake Road, on M-65 from south of Bamfield Road to north of the M-72 east leg and on M-33 from north of Island Lake Road to south of County Road 612, Montmorency County. This project includes a 2 year pavement performance warranty.

    No DBE participation required

    Bidder As-SubmitttedFahrner Asphalt Sealers, L.L.C. $1,324,513.82Pavement Maintenance Systems, LLC $1,368,181.86Highway Maintenance and Construction Company $1,439,077.29

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 043 Low Bid: $1,076,392.00

    Project: GF19 72023-204225 Engineer Estimate: $1,337,182.08

    Local Agreement: Pct Over/Under Estimate: -19.50 %

    Start Date: September 3, 2019 Completion Date: October 18, 2019

    Description:

    5.65 mi of hot mix asphalt cold milling and resurfacing, guardrail and pavement markings on M-55 from east of Kelly Street to west of Old M-55, Roscommon County. This project includes a 3 year materials and workmanship pavement warranty.

    No DBE participation required

    Bidder As-SubmitttedPyramid Paving and Contracting Co. $1,076,392.00Rieth-Riley Construction Co., Inc. $1,097,727.75Bolen Asphalt Paving, Inc. $1,399,493.75

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 044 Low Bid: $398,348.93

    Project: M 80041-131563 Engineer Estimate: $392,017.96

    Local Agreement: 18-5387 Pct Over/Under Estimate: 1.61 %

    Start Date: June 3, 2019 Completion Date: June 26, 2019

    Description:

    0.76 mi of full depth concrete pavement repairs and pavement markings on M-43 from La Grange Street (I-196BL) easterly to Blue Star Highway in the city of South Haven, Van Buren County.

    No DBE participation required

    Bidder As-SubmitttedFlorence Cement Company $398,348.93Causie Contracting, Inc. $407,233.18Milbocker and Sons, Inc. $409,785.82C & D Hughes, Inc. $418,866.88Kamminga & Roodvoets, Inc. $427,353.32Major Cement Co. $428,452.20Cipparrone Contracting, Inc. $435,610.03Rigid Pavement Construction LLC $480,693.13

    Total Number of Bidders: 8

  • Letting of January 04, 2019

    Letting Call: 1901 045 Low Bid: $379,183.85

    Project: NH 82192-201368 Engineer Estimate: $498,238.13

    Local Agreement: Pct Over/Under Estimate: -23.90 %

    Start Date: July 8, 2019 Completion Date: August 23, 2019

    Description:

    0.44 mi of full depth concrete pavement repair on M-39 from Porter Avenue to Lafayette Boulevard in the city of Lincoln Park, Wayne County.

    3.00 % DBE participation required

    Bidder As-SubmitttedCipparrone Contracting, Inc. $379,183.85Florence Cement Company $479,377.25Great Lakes Contracting Solutions, LLC $479,536.82Causie Contracting, Inc. $480,427.82Major Cement Co. $524,650.43C & D Hughes, Inc. $679,799.89

    Total Number of Bidders: 6

  • Letting of January 04, 2019

    Letting Call: 1901 046 Low Bid: $199,705.27

    Project: NH 36021-130204 Engineer Estimate: $186,087.43

    Local Agreement: Pct Over/Under Estimate: 7.32 %

    Start Date: 10 days after award Completion Date: August 30, 2019

    Description:

    Bridge rehabilitation including railing replacement, end header repair, deck patching, guardrail, concrete approach, curb and gutter and pavement markings on US-2 over the south branch of Iron River, Iron County.

    No DBE participation required

    Bidder As-SubmitttedHebert Construction Co. $199,705.27FA Industrial Services, Inc. $329,012.65Grand River Construction, Inc. $354,999.04

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 047 Low Bid: $853,451.74

    Project: NH 22021-201212 Engineer Estimate: $744,540.31

    Local Agreement: Pct Over/Under Estimate: 14.63 %

    Start Date: July 8, 2019 Completion Date: August 30, 2019

    Description:

    2.85 mi of micro-surface, chip seal, overband crack fill, micro cold milling, joint repairs and pavement markings on US-2 from Kent Street to east of the north junction of M-95 in the city of Iron Mountain, Dickinson County. This project includes a 2 year pavement performance warranty.

    No DBE participation required

    Bidder As-SubmitttedPavement Maintenance Systems, LLC $853,451.74Strawser Construction Inc. $1,044,076.84American Pavements, Inc. $1,087,343.66

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 048 Low Bid: $722,735.84

    Project: M 31052-131821 Engineer Estimate: $662,415.13

    Local Agreement: Pct Over/Under Estimate: 9.11 %

    Start Date: August 19, 2019 Completion Date: 16 Working Days

    Description:

    1.42 mi of hot mix asphalt overlay, gravel shoulders, centerline and shoulder corrugations and pavement markings on US-41 from Airpark Boulevard to north of Oneco Road, Houghton County. This project includes a 3 year materials and workmanship pavement warranty.

    No DBE participation required

    Bidder As-SubmitttedBacco Construction Company $722,735.84Payne & Dolan Inc. $727,944.06

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 049 Low Bid: $495,805.26

    Project: ST 58041-132582 Engineer Estimate: $542,609.35

    Local Agreement: Pct Over/Under Estimate: -8.63 %

    Start Date: July 8, 2019 Completion Date: September 8, 2019

    Description:

    4.40 mi of micro-surface with warranty, overband crack sealing and pavement repairs on M-50 from the Lenawee county line to west of Wilcox Road, Monroe County. This project includes a 2 year pavement performance warranty.

    No DBE participation required

    Bidder As-SubmitttedPavement Maintenance Systems, LLC $495,805.26Strawser Construction Inc. $647,091.47Microsurfacing Contractors, LLC $661,138.72American Pavements, Inc. $709,817.52

    Total Number of Bidders: 4

  • Letting of January 04, 2019

    Letting Call: 1901 050 Low Bid: $1,794,172.43

    Project: NH 64015-126486 Engineer Estimate: $1,644,793.60

    Local Agreement: Pct Over/Under Estimate: 9.08 %

    Start Date: July 9, 2019 Completion Date: June 1, 2020

    Description:

    3.96 mi of hot mix asphalt cold milling and resurfacing, concrete pavement repairs and pavement markings on US- 31 from M-20 northerly to north of West Shelby Road, Oceana County. This project includes a 3 year materials and workmanship pavement warranty.

    4.00 % DBE participation required

    Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $1,794,172.43Michigan Paving and Materials Company $2,031,418.11

    Total Number of Bidders: 2

  • Letting of January 04, 2019

    Letting Call: 1901 051 Low Bid: $2,189,982.80

    Project: BRT 59609-130959 , ETC Engineer Estimate: $2,471,166.60

    Local Agreement: 18-5525 Pct Over/Under Estimate: -11.38 %

    Start Date: 10 days after award Completion Date: October 12, 2019

    Description:

    1.48 mi of hot mix asphalt resurfacing, concrete pavement, curb and gutter, drainage, guardrail, bridge reconstruction with a 60 inch pre stressed concrete bulb-tee beam, piling, cofferdam, riprap and pavement markings on Wise Road from Youngman Road to M-91 over the Flat River, Montcalm County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedGrand River Construction, Inc. $2,189,982.80Nashville Construction Company $2,227,932.36Hardman Construction, Inc. $2,417,300.49Miller Development, Inc. $2,424,490.60J. E. Kloote Contracting, Inc. $2,487,730.09Milbocker and Sons, Inc. $2,524,005.87Anlaan Corporation $2,713,766.06C. A. Hull Co., Inc. $2,741,605.64

    Total Number of Bidders: 8

  • Letting of January 04, 2019

    Letting Call: 1901 052 Low Bid: $1,612,747.36

    Project: M 67051-201196 Engineer Estimate: $1,843,772.59

    Local Agreement: Pct Over/Under Estimate: -12.53 %

    Start Date: August 19, 2019 Completion Date: October 1, 2019

    Description:

    6.43 mi of hot mix asphalt cold milling, resurfacing and pavement markings on M-115 from northwest of 20 Mile Road to the north Osceola county line, Osceola County. This project includes a 3 year materials and workmanship pavement warranty.

    No DBE participation required

    Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $1,612,747.36Elmer's Crane and Dozer, Inc. $1,738,297.79Central Asphalt, Inc. $2,393,812.53

    Total Number of Bidders: 3

  • Letting of January 04, 2019

    Letting Call: 1901 053 Low Bid: $1,346,544.60

    Project: STUL 78000-132962 Engineer Estimate: $1,278,952.00

    Local Agreement: 18-5504 Pct Over/Under Estimate: 5.28 %

    Start Date: March 18, 2019 Completion Date: September 19, 2021

    Description:

    0.39 mi of hot mix asphalt surfacing, concrete curb, gutter and sidewalk, storm sewer and water main on North Lakeview Avenue from US-12 (East Chicago Road) to the railroad tracks in the city of Sturgis, St. Joseph County. This is a Local Agency project.

    3.00 % DBE participation required

    Bidder As-SubmitttedKalin Construction Co., Inc. $1,346,544.60Mead Bros. Excavating Inc. $1,395,744.40Hoffman Bros., Inc. $1,399,025.77Peters Construction Co. $1,404,775.50Milbocker and Sons, Inc. $1,565,831.16Kamminga & Roodvoets, Inc. $1,636,185.65

    Total Number of Bidders: 6