level 10, carillon city office tower t f post office box ... · 3/30/2012  · this presentation...

18
ABN 33 149 028 142 Page 1 Level 10, Carillon City Office Tower 207 Murray Street Perth, WA 6000 Post Office Box Z5736 Perth, Western Australia 6831 T 08 6460 0360 F 08 6460 0361 E [email protected] www.resdevgroup.com.au 30 March 2012 Companies Announcements Office ASX Limited 20 Bridge Street SYDNEY NSW 2000 Via e-lodgement BROKER PRESENTATION Resource Development Group Limited advises that the Managing Director, Mr Jeff Brill, will be in Sydney and Melbourne in the coming week on a roadshow to various institutional investors. The roadshow commences on Monday 2 April 2012. A copy of the presentation is attached. Your Faithfully Ben Donovan Company Secretary For personal use only

Upload: others

Post on 21-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

ABN 33 149 028 142 Page 1

Level 10, Carillon City Office Tower

207 Murray Street Perth, WA 6000

Post Office Box Z5736

Perth, Western Australia 6831

T 08 6460 0360

F 08 6460 0361

E [email protected]

www.resdevgroup.com.au

30 March 2012 Companies Announcements Office ASX Limited 20 Bridge Street SYDNEY NSW 2000 Via e-lodgement

BROKER PRESENTATION

Resource Development Group Limited advises that the Managing Director, Mr Jeff Brill, will be in Sydney and Melbourne in the coming week on a roadshow to various institutional investors. The roadshow commences on Monday 2 April 2012. A copy of the presentation is attached. Your Faithfully Ben Donovan Company Secretary

For

per

sona

l use

onl

y

Presentation Building a Vertically Integrated

Mining Services Business

For

per

sona

l use

onl

y

Disclaimer

This presentation should not be relied on as a representation of any matter that a

potential investor or their adviser should consider in evaluating the Company.

Potential investors must make their own independent assessment and

investigation of the matter contained herein and should not rely on any statement

or the adequacy or accuracy of the information provided.

The Company and its related bodies corporate or any its Directors, agents,

officers or employees do not make any representation or warranty, express or

implied, as to or endorsement of the Company, the accuracy or completeness of

any information, statements or representations contained in the presentation, and

they do not accept any liability whatsoever (including in negligence) for any

information, representation or statement made in or omitted from this

presentation.

This document contains certain forward looking statements which involve known

and unknown risks, delays and uncertainties not under the Company’s control

which may cause actual results performance or Company’s results,

achievements of the Company to be materially different from the results,

performance or expectations implied by these forward looking statements. The

Company makes no representation or warranty, express or implied, as to or

endorsement of the accuracy or completeness of any information, statements or

representations contained in this presentation with respect to the Company.

For

per

sona

l use

onl

y

Introduction

BUILDING VALUE

• Resource Development Group Limited (RDG) is building a leading vertically

integrated mining services business using a subsidiary model

• RDG owns Engenium (project delivery), Pacer (engineering construction

contractor) and Intellect Systems (specialist engineering), servicing the resource

and infrastructure sectors both domestically and internationally

• RDG has an option agreement and has completed due diligence over Ecologia,

an environmental approvals and biological sciences consultant

• RDG is headquartered in Perth with offices in Brisbane and London

• RDG is targeting a services business with $200m annual turnover at EBITDA

margins of greater than 10% For

per

sona

l use

onl

y

Capital Structure

Description Amount

Total Shares on Issue (2/3/2012) 118,130,513

Executive Shareholding (previous owners who

still hold executive roles in RDG)

82%

Market capitalisation at $0.23 $27m

For

per

sona

l use

onl

y

Overview of Directors

Mr Mel Ashton Non-Executive Chairman

Mr Ashton is a national director of the Institute of Chartered Accountants, director

of The Hawaiian Group of Companies and chairman of Cullen Wines (Australia)

Pty Ltd. He is currently the chairman for Empired Limited (ASX:EPD), Gryphon

Minerals Limited (ASX:GRY) and Venture Minerals Limited (ASX:VMS) and a

director of Barra Resources Limited (ASX:BAR).

Mr Jeff Brill Managing Director

Mr Brill has over 19 years experience in project management and engineering

and was a founding partner of Engenium. Mr Brill was Engenium’s managing

director from inception in July 2003 until June 2010.

Mr Damir Panzich Executive Director

Mr Panzich has over 19 years experience in project management and

engineering and was a founding partner of Engenium. Mr Panzich was also an

executive director of Calibre Engenium Joint Venture Pty Ltd.

Mr Chris Ryan Non-Executive Director

Mr Ryan has over 20 years experience in senior HR roles, including general

manager of human resources for Wesfarmers Limited where he was responsible

for the HR aspects of acquisitions. He currently provides corporate advisory

services and is a member of Curtin University’s School of Management Advisory

Board.

For

per

sona

l use

onl

y

Business Overview (continued)

Resource Project Development Life Cycle

Identification

approvals

exploration

drilling

Definition Assessment Development Production

approvals

mett. test work

process design

studies

design &

specialist eng.

financial

modelling

construction

commissioning

operations

maintenance

sustaining works

Engenium Pacer

Company Acquisition (Stage 1) Company Acquisition (Stage 2)

Project Development Partnerships

Intellect Systems

Ecologia

For

per

sona

l use

onl

y

RDG Breakdown - Turnover

FY12 Breakdown of Revenue by Turnover ($m)

47%

26%

14%

14%

Engenium

Pacer

Intellect Systems

Ecologia

Note : based on a full year run rate

For

per

sona

l use

onl

y

RDG Breakdown - Commodity

FY12 Breakdown of Revenue by Commodity

57.86%

0.20%

0.34%

10.47%

10.82%

6.29%

3.74%

5.81%

0.09%

2.49% 1.88%

Iron ore

Manganese

Coal

Mineral Sands

Gold

Rail

Oil & Gas

Vanadium/ Rare Earths

Uranium

Alt Energy

Misc

For

per

sona

l use

onl

y

RDG Financial History

1.3 6.3

14.5

24.1

37.0

68.8

37.0

13.910.9

0.2 1.4 2.44.5

8.512.4

4.82.0 1.4

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

Turnover ($m)

EBITDA ($m)

Engenium Engenium including CEJV RDGEngenium

For

per

sona

l use

onl

y

Engenium Overview

Engenium : Smart Project Delivery

• Engenium is a progressive project delivery company servicing the domestic and

international resource and rail sectors

• Key clients include BHPBIO, RioTinto, FMG, Atlas Iron

• Scope of services include:

– metallurgical testwork management

– development of process solutions

– project assessment (scoping, pre-feasibility and feasibility studies)

– Project delivery (EPCM, integrated team, owners engineer)

– heavy haul rail

For

per

sona

l use

onl

y

Engenium Rail Overview

Engenium Rail : Rebuilding a Rail Business

• In 2005, Engenium formed an incorporated 50:50 joint venture (Calibre Engenium

JV) to pursue rail infrastructure opportunities, which grew to dominate the rail

infrastructure EPCM space in WA and entered the QLD market with 2 significant

clients. At the time of Engenium’s divestment of its joint venture interest in Feb

2010, the JV had over 300 personnel and was turning over in excess of $100

million dollars in annual revenue

• The non-compete for Engenium in rail ended early Feb 2012 and Engenium has

restarted its rail service offering with key personnel hires

• Engenium Rail is working for a QLD client and is now tendering WA and QLD

based work for the majors in their sustaining works and expansion projects

divisions

For

per

sona

l use

onl

y

Pacer Overview

Pacer: Engineering Construction Contractor

• Pacer is an engineering construction contractor servicing the domestic and

international resource sectors, with a clear focus on process plants, materials

handling systems and supporting non-process infrastructure

• Key clients include Silver Lake Resources, Iluka, Shark Bay Resources, Doral

• Key project is Silver Lake Resources Murchison project which is a $35m cost

plus EPC contract for the design, procurement, refurbishment and construction of

a new CIL processing plant to be delivered over the 2012 calendar year

• Scope of services include:

– Engineering design

– Procurement (including 2nd hand and refurbishment)

– Construction management

– EPC (design & construct) lump sum contracting (up to $50m packages)

For

per

sona

l use

onl

y

Intellect Systems Overview

Intellect Systems: Specialist Engineering Services

• Intellect Systems is a specialist control systems, industrial IT and electrical

engineering company servicing the domestic resources sector plus energy,

utilities, oil and gas and industrial clients

• Key clients include FMG, BHPBIO, Rio Tinto, TyssenKrupp, Sandvick, Banlaw,

Sandfire Resources, St Barbara Resources and Arafura Resources

• Scope of services include:

– Control systems and electrical engineering, instrumentation

– Industrial IT

– Control systems support and maintenance

For

per

sona

l use

onl

y

Ecologia Overview

Ecologia: Environmental Consultancy

• Ecologia is an environmental consultancy firm servicing the domestic resource

sector plus oil and gas, construction, local and federal government, utilities and

infrastructure clients

• Key clients include FMG, BHPBIO, Rio Tinto, Woodside and Tier 1 EPCM’s

• Scope of services include:

– Environmental management (approvals, impact assessments, auditing,

training, management plans, due diligence)

– Biological science consultancy services (zoology, botany, flora and fauna

surveys, groundwater, environmentally sensitive areas)

For

per

sona

l use

onl

y

Some of our Clients

AN ESTABLISHED CLIENT BASE

For

per

sona

l use

onl

y

The Future

GROWTH STRATEGY

• Organic growth opportunities

– Existing RDG clients have well developed expansion plans which provides

an excellent future pipeline of work

– Synergies between subsidiaries are being exploited to expand opportunities

and support step changes in scale of projects being undertaken

– Pacer has moved into delivery of larger projects via the Silver Lake

Resources Murchison project which is a $35m cost plus EPC contract

– Engenium is restarting rail capability

• Growth by acquisition

– Option agreement over Ecologia in place with targeted completion in FY12

– Other potential acquisitions identified and progressing

• Combining Capabilities to Fast Track Projects

– RDG is pursuing opportunities to fast track projects for clients by combining

capabilities of subsidiaries

For

per

sona

l use

onl

y

Any questions?

Resource Development Group Limited L10, Carillion City Office Towers, 207 Murray St, Perth, WA www.resdevgroup.com.au

[email protected] (08) 6460 0360

For

per

sona

l use

onl

y