No.
.M.
ir.
AutoCAD SHX Text
1.NOTE: FOR THE PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS NOTE: FOR THE PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS FOR THE PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS FOR THE PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS THE PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS THE PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS AND LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS LEGIBILITY, THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS ARE ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS ESSENTIALLY DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS DIAGRAMMATIC AND ALTHOUGH SIZES AND LOCATIONS AND ALTHOUGH SIZES AND LOCATIONS AND ALTHOUGH SIZES AND LOCATIONS ALTHOUGH SIZES AND LOCATIONS ALTHOUGH SIZES AND LOCATIONS SIZES AND LOCATIONS SIZES AND LOCATIONS AND LOCATIONS AND LOCATIONS LOCATIONS LOCATIONS OF EQUIPMENT ARE DRAWN TO SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT EQUIPMENT ARE DRAWN TO SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT EQUIPMENT ARE DRAWN TO SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT ARE DRAWN TO SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT ARE DRAWN TO SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT DRAWN TO SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT DRAWN TO SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT TO SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT TO SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT SCALE WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT WHEREVER POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT POSSIBLE, THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT THE CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT CONTRACTOR SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT SHALL MAKE USE OF ALL DATA IN ALL OF THE CONTRACT MAKE USE OF ALL DATA IN ALL OF THE CONTRACT MAKE USE OF ALL DATA IN ALL OF THE CONTRACT USE OF ALL DATA IN ALL OF THE CONTRACT USE OF ALL DATA IN ALL OF THE CONTRACT OF ALL DATA IN ALL OF THE CONTRACT OF ALL DATA IN ALL OF THE CONTRACT ALL DATA IN ALL OF THE CONTRACT ALL DATA IN ALL OF THE CONTRACT DATA IN ALL OF THE CONTRACT DATA IN ALL OF THE CONTRACT IN ALL OF THE CONTRACT IN ALL OF THE CONTRACT ALL OF THE CONTRACT ALL OF THE CONTRACT OF THE CONTRACT OF THE CONTRACT THE CONTRACT THE CONTRACT CONTRACT CONTRACT DOCUMENTS AND VERIFY THIS INFORMATION PRIOR TO ORDERING, FABRICATING OR INSTALLING ANY MATERIALS. 2.THE MECHANICAL CONTRACTOR SHALL PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS THE MECHANICAL CONTRACTOR SHALL PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS MECHANICAL CONTRACTOR SHALL PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS MECHANICAL CONTRACTOR SHALL PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS CONTRACTOR SHALL PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS CONTRACTOR SHALL PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS SHALL PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS SHALL PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS PROVIDE COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS COMPLETE INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS INFORMATION AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS AND COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS COOPERATE WITH THE OTHER CONTRACTORS AND TRADES AS WITH THE OTHER CONTRACTORS AND TRADES AS WITH THE OTHER CONTRACTORS AND TRADES AS THE OTHER CONTRACTORS AND TRADES AS THE OTHER CONTRACTORS AND TRADES AS OTHER CONTRACTORS AND TRADES AS OTHER CONTRACTORS AND TRADES AS CONTRACTORS AND TRADES AS CONTRACTORS AND TRADES AS AND TRADES AS AND TRADES AS TRADES AS TRADES AS AS AS REQUIRED FOR THE COMPLETION AND COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE FOR THE COMPLETION AND COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE FOR THE COMPLETION AND COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE THE COMPLETION AND COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE THE COMPLETION AND COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE COMPLETION AND COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE COMPLETION AND COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE AND COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE AND COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE COORDINATION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE COMPLETE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE SHALL BE BROUGHT TO THE ATTENTION OF THE SHALL BE BROUGHT TO THE ATTENTION OF THE BE BROUGHT TO THE ATTENTION OF THE BE BROUGHT TO THE ATTENTION OF THE BROUGHT TO THE ATTENTION OF THE BROUGHT TO THE ATTENTION OF THE TO THE ATTENTION OF THE TO THE ATTENTION OF THE THE ATTENTION OF THE THE ATTENTION OF THE ATTENTION OF THE ATTENTION OF THE OF THE OF THE THE THE PRIME CONTRACTOR, ENGINEER AND, AS NECESSARY, THE OWNER. 3.THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ADMINISTERING ALL WARRANTIES ON EQUIPMENT WHICH THEY FURNISH AND INSTALL. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ADMINISTERING ALL WARRANTIES ON EQUIPMENT WHICH THEY FURNISH AND INSTALL. 4.PROVIDE WRITTEN WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM PROVIDE WRITTEN WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM WRITTEN WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM WRITTEN WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM ALL FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM FAULTY MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM MATERIALS AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM AND/OR LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM LABOR, AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM AT NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM NO COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM COST TO TENANT, FOR A PERIOD OF ONE YEAR FROM TO TENANT, FOR A PERIOD OF ONE YEAR FROM TO TENANT, FOR A PERIOD OF ONE YEAR FROM TENANT, FOR A PERIOD OF ONE YEAR FROM TENANT, FOR A PERIOD OF ONE YEAR FROM FOR A PERIOD OF ONE YEAR FROM FOR A PERIOD OF ONE YEAR FROM A PERIOD OF ONE YEAR FROM A PERIOD OF ONE YEAR FROM PERIOD OF ONE YEAR FROM PERIOD OF ONE YEAR FROM OF ONE YEAR FROM OF ONE YEAR FROM ONE YEAR FROM ONE YEAR FROM YEAR FROM YEAR FROM FROM FROM DATE OF ACCEPTANCE BY THE OWNER. WARRANTIES SHALL BEGIN ON THE DATE OF SUBSTANTIAL COMPLETION. 5.THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND WITH THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND THE GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND GENERAL CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND CONTRACTOR AND OTHER TRADES ALL REQUIRED OPENINGS AND AND OTHER TRADES ALL REQUIRED OPENINGS AND AND OTHER TRADES ALL REQUIRED OPENINGS AND OTHER TRADES ALL REQUIRED OPENINGS AND OTHER TRADES ALL REQUIRED OPENINGS AND TRADES ALL REQUIRED OPENINGS AND TRADES ALL REQUIRED OPENINGS AND ALL REQUIRED OPENINGS AND ALL REQUIRED OPENINGS AND REQUIRED OPENINGS AND REQUIRED OPENINGS AND OPENINGS AND OPENINGS AND AND AND PENETRATIONS. ALL REQUIRED OPENINGS IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE ALL REQUIRED OPENINGS IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE ALL REQUIRED OPENINGS IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE REQUIRED OPENINGS IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE REQUIRED OPENINGS IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE OPENINGS IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE OPENINGS IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE BE CONSTRUCTED INTO THE STRUCTURE WITH THE BE CONSTRUCTED INTO THE STRUCTURE WITH THE CONSTRUCTED INTO THE STRUCTURE WITH THE CONSTRUCTED INTO THE STRUCTURE WITH THE INTO THE STRUCTURE WITH THE INTO THE STRUCTURE WITH THE THE STRUCTURE WITH THE THE STRUCTURE WITH THE STRUCTURE WITH THE STRUCTURE WITH THE WITH THE WITH THE THE THE USE OF SLEEVES, CURBS, ETC. CUTTING AND PATCHING SHALL BE HELD TO A MINIMUM. 6.ALL ITEMS PROJECTING THROUGH THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE ALL ITEMS PROJECTING THROUGH THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE ITEMS PROJECTING THROUGH THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE ITEMS PROJECTING THROUGH THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE PROJECTING THROUGH THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE PROJECTING THROUGH THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE THROUGH THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE THROUGH THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE THE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE ROOF SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE SHALL BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE BE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE FLASHED THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE THROUGH CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE CURBS OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE OR PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE MINIMUM OF 12" ABOVE THE ROOF. THE PIPE MINIMUM OF 12" ABOVE THE ROOF. THE PIPE OF 12" ABOVE THE ROOF. THE PIPE OF 12" ABOVE THE ROOF. THE PIPE 12" ABOVE THE ROOF. THE PIPE 12" ABOVE THE ROOF. THE PIPE ABOVE THE ROOF. THE PIPE ABOVE THE ROOF. THE PIPE THE ROOF. THE PIPE THE ROOF. THE PIPE ROOF. THE PIPE ROOF. THE PIPE THE PIPE THE PIPE PIPE PIPE CURBS AND SEALS SHALL BE INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO AND SEALS SHALL BE INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO AND SEALS SHALL BE INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO SEALS SHALL BE INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO SEALS SHALL BE INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO SHALL BE INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO SHALL BE INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO BE INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO BE INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO INSTALLED BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO BY THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO THE ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO ROOFING CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO CONTRACTOR. ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO ENSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO THAT AMPLE BOOT OPENINGS ARE PROVIDED TO THAT AMPLE BOOT OPENINGS ARE PROVIDED TO AMPLE BOOT OPENINGS ARE PROVIDED TO AMPLE BOOT OPENINGS ARE PROVIDED TO BOOT OPENINGS ARE PROVIDED TO BOOT OPENINGS ARE PROVIDED TO OPENINGS ARE PROVIDED TO OPENINGS ARE PROVIDED TO ARE PROVIDED TO ARE PROVIDED TO PROVIDED TO PROVIDED TO TO TO ACCOMMODATE ANY ELECTRICAL CONDUIT PENETRATIONS REQUIRED FOR POWER. 7.ALL OUTDOOR AIR INTAKES BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY ALL OUTDOOR AIR INTAKES BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY OUTDOOR AIR INTAKES BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY OUTDOOR AIR INTAKES BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY AIR INTAKES BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY AIR INTAKES BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY INTAKES BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY INTAKES BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY BY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY EQUIPMENT SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY SHALL HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY HAVE A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY A MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY MINIMUM 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY 10'-0" HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY HORIZONTAL CLEARANCE FROM THE DISCHARGE OF ANY CLEARANCE FROM THE DISCHARGE OF ANY CLEARANCE FROM THE DISCHARGE OF ANY FROM THE DISCHARGE OF ANY FROM THE DISCHARGE OF ANY THE DISCHARGE OF ANY THE DISCHARGE OF ANY DISCHARGE OF ANY DISCHARGE OF ANY OF ANY OF ANY ANY ANY EXHAUST FAN, COMBUSTION EXHAUST OR PLUMBING VENT. 8.COORDINATE THE INSTALLATION AND FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR COORDINATE THE INSTALLATION AND FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR THE INSTALLATION AND FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR THE INSTALLATION AND FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR INSTALLATION AND FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR INSTALLATION AND FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR AND FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR AND FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR FINISH OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR OF ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR ALL SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR SUPPLY AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR AND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR DEVICES. ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR ALL INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR INTERIOR FACES OF DUCTWORK BEHIND RETURN AIR FACES OF DUCTWORK BEHIND RETURN AIR FACES OF DUCTWORK BEHIND RETURN AIR OF DUCTWORK BEHIND RETURN AIR OF DUCTWORK BEHIND RETURN AIR DUCTWORK BEHIND RETURN AIR DUCTWORK BEHIND RETURN AIR BEHIND RETURN AIR BEHIND RETURN AIR RETURN AIR RETURN AIR AIR AIR GRILLES SHALL BE PAINTED FLAT BACK FOR LINE OF SIGHT. 9.THE MECHANICAL CONTRACTOR SHALL COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING THE MECHANICAL CONTRACTOR SHALL COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING MECHANICAL CONTRACTOR SHALL COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING MECHANICAL CONTRACTOR SHALL COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING CONTRACTOR SHALL COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING CONTRACTOR SHALL COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING SHALL COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING SHALL COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING COORDINATE ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING ALL DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING DUCT AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING AND DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING DIFFUSER LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING LOCATIONS WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING WITH LIGHT FIXTURES AS WELL AS SPRINKLER PIPING LIGHT FIXTURES AS WELL AS SPRINKLER PIPING LIGHT FIXTURES AS WELL AS SPRINKLER PIPING FIXTURES AS WELL AS SPRINKLER PIPING FIXTURES AS WELL AS SPRINKLER PIPING AS WELL AS SPRINKLER PIPING AS WELL AS SPRINKLER PIPING WELL AS SPRINKLER PIPING WELL AS SPRINKLER PIPING AS SPRINKLER PIPING AS SPRINKLER PIPING SPRINKLER PIPING SPRINKLER PIPING PIPING PIPING AND HEADS (WHERE INCLUDED IN THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, HEADS (WHERE INCLUDED IN THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, HEADS (WHERE INCLUDED IN THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, (WHERE INCLUDED IN THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, (WHERE INCLUDED IN THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, INCLUDED IN THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, INCLUDED IN THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, IN THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, IN THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, THE PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, PROJECT) FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, FOR A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, A COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, COMPLETE INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, INSTALLATION. WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, WHERE THE ALTERATION OF DUCT SIZES ARE NECESSARY, THE ALTERATION OF DUCT SIZES ARE NECESSARY, THE ALTERATION OF DUCT SIZES ARE NECESSARY, ALTERATION OF DUCT SIZES ARE NECESSARY, ALTERATION OF DUCT SIZES ARE NECESSARY, OF DUCT SIZES ARE NECESSARY, OF DUCT SIZES ARE NECESSARY, DUCT SIZES ARE NECESSARY, DUCT SIZES ARE NECESSARY, SIZES ARE NECESSARY, SIZES ARE NECESSARY, ARE NECESSARY, ARE NECESSARY, NECESSARY, NECESSARY, MAINTAIN CROSS-SECTIONAL AREAS. 10.ROOFTOP UNITS SHALL BE SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP ROOFTOP UNITS SHALL BE SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP UNITS SHALL BE SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP UNITS SHALL BE SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP SHALL BE SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP SHALL BE SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP BE SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP BE SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP SET TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP TO RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP RUN IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP IN "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP "FAN CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP CONTINUOUS" MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP MODE DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP DURING OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP OCCUPIED HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP HOURS. DURING NIGHT SET-BACK HOURS, THE ROOFTOP DURING NIGHT SET-BACK HOURS, THE ROOFTOP DURING NIGHT SET-BACK HOURS, THE ROOFTOP NIGHT SET-BACK HOURS, THE ROOFTOP NIGHT SET-BACK HOURS, THE ROOFTOP SET-BACK HOURS, THE ROOFTOP SET-BACK HOURS, THE ROOFTOP HOURS, THE ROOFTOP HOURS, THE ROOFTOP THE ROOFTOP THE ROOFTOP ROOFTOP ROOFTOP UNITS SHALL RUN IN "FAN AUTO" MODE. 11.MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT CONTRACTOR SHALL FURNISH AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT CONTRACTOR SHALL FURNISH AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT SHALL FURNISH AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT SHALL FURNISH AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT FURNISH AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT FURNISH AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT AND INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT INSTALL 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT 4" HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT HIGH BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT BLACK OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT OVER WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT WHITE LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT LAMINATE NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT NAMEPLATE WITH 2" LETTERS VISIBLE ADJACENT WITH 2" LETTERS VISIBLE ADJACENT WITH 2" LETTERS VISIBLE ADJACENT 2" LETTERS VISIBLE ADJACENT 2" LETTERS VISIBLE ADJACENT LETTERS VISIBLE ADJACENT LETTERS VISIBLE ADJACENT VISIBLE ADJACENT VISIBLE ADJACENT ADJACENT ADJACENT TO DISCONNECT SWITCH FOR ALL MECHANICAL EQUIPMENT." 12.ALL CONDUITS, DISCONNECT SWITCHES AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW ALL CONDUITS, DISCONNECT SWITCHES AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW CONDUITS, DISCONNECT SWITCHES AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW CONDUITS, DISCONNECT SWITCHES AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW DISCONNECT SWITCHES AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW DISCONNECT SWITCHES AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW SWITCHES AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW SWITCHES AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW AND FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW FINAL CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW CONNECTIONS FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW FOR LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW LINE VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW VOLTAGE WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW SHALL BE BY THE ELECTRICAL CONTRACTOR. LOW BE BY THE ELECTRICAL CONTRACTOR. LOW BE BY THE ELECTRICAL CONTRACTOR. LOW BY THE ELECTRICAL CONTRACTOR. LOW BY THE ELECTRICAL CONTRACTOR. LOW THE ELECTRICAL CONTRACTOR. LOW THE ELECTRICAL CONTRACTOR. LOW ELECTRICAL CONTRACTOR. LOW ELECTRICAL CONTRACTOR. LOW CONTRACTOR. LOW CONTRACTOR. LOW LOW LOW VOLTAGE CONDUIT, WIRING AND FINAL CONNECTION BY MECHANICAL CONTRACTOR. 13.PROVIDE VIBRATION ISOLATION DEVICES AND FLEXIBLE DUCT/ PIPING CONNECTIONS TO ALL MOVING MACHINERY NOT INTERNALLY ISOLATED. PROVIDE VIBRATION ISOLATION DEVICES AND FLEXIBLE DUCT/ PIPING CONNECTIONS TO ALL MOVING MACHINERY NOT INTERNALLY ISOLATED. 14.SUPPLY, RETURN AND RESTROOM EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND SUPPLY, RETURN AND RESTROOM EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND RETURN AND RESTROOM EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND RETURN AND RESTROOM EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND AND RESTROOM EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND AND RESTROOM EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND RESTROOM EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND RESTROOM EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND EXHAUST DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND DUCT CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND CONSTRUCTION SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND SHALL BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND BE GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND GALVANIZED STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND STEEL. ANY REQUIRED GAUGES, SWAY BRACING AND ANY REQUIRED GAUGES, SWAY BRACING AND ANY REQUIRED GAUGES, SWAY BRACING AND REQUIRED GAUGES, SWAY BRACING AND REQUIRED GAUGES, SWAY BRACING AND GAUGES, SWAY BRACING AND GAUGES, SWAY BRACING AND SWAY BRACING AND SWAY BRACING AND BRACING AND BRACING AND AND AND SUSPENSION SHALL CONFORM TO SMACNA STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR SHALL CONFORM TO SMACNA STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR SHALL CONFORM TO SMACNA STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR CONFORM TO SMACNA STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR CONFORM TO SMACNA STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR TO SMACNA STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR TO SMACNA STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR SMACNA STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR SMACNA STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR STANDARDS. SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR SEAL ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR ALL SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR SEAMS AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR AND JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR JOINTS AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR AIR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR AND WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR WATERTIGHT. FLEXIBLE ALUMINUM DUCTWORK OR FLEXIBLE ALUMINUM DUCTWORK OR FLEXIBLE ALUMINUM DUCTWORK OR ALUMINUM DUCTWORK OR ALUMINUM DUCTWORK OR DUCTWORK OR DUCTWORK OR OR OR FIBERGLASS DUCTBOARD CAN BE ALLOWED WITH ENGINEER'S PRIOR APPROVAL. 15.ALL RECTANGULAR, ROUND, AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND ALL RECTANGULAR, ROUND, AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND RECTANGULAR, ROUND, AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND RECTANGULAR, ROUND, AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND ROUND, AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND ROUND, AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND FLEXIBLE DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND DUCTWORK SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND SHALL BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND BE SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND SIZED WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND WITH CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND CLEAR INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND INSIDE DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND DIMENSIONS AS SHOWN ON THESE DRAWINGS; AND AS SHOWN ON THESE DRAWINGS; AND AS SHOWN ON THESE DRAWINGS; AND SHOWN ON THESE DRAWINGS; AND SHOWN ON THESE DRAWINGS; AND ON THESE DRAWINGS; AND ON THESE DRAWINGS; AND THESE DRAWINGS; AND THESE DRAWINGS; AND DRAWINGS; AND DRAWINGS; AND AND AND SHALL BE FABRICATED AND INSTALLED ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND BE FABRICATED AND INSTALLED ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND BE FABRICATED AND INSTALLED ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND FABRICATED AND INSTALLED ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND FABRICATED AND INSTALLED ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND AND INSTALLED ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND AND INSTALLED ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND INSTALLED ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND INSTALLED ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND ACCORDING TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND TO THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND THE MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND MOST RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND RECENTLY PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND PUBLISHED SMACNA STANDARDS. ALL JOINTS, SEAMS, AND SMACNA STANDARDS. ALL JOINTS, SEAMS, AND SMACNA STANDARDS. ALL JOINTS, SEAMS, AND STANDARDS. ALL JOINTS, SEAMS, AND STANDARDS. ALL JOINTS, SEAMS, AND ALL JOINTS, SEAMS, AND ALL JOINTS, SEAMS, AND JOINTS, SEAMS, AND JOINTS, SEAMS, AND SEAMS, AND SEAMS, AND AND AND CONNECTIONS MUST BE SECURELY FASTENED & SEALED. 16.ALL HVAC SUPPLY AND RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH ALL HVAC SUPPLY AND RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH HVAC SUPPLY AND RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH HVAC SUPPLY AND RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH SUPPLY AND RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH SUPPLY AND RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH AND RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH AND RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH RETURN CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH CONCEALED DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH DUCTWORK TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH TO BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH BE EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH EXTERNALLY WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH WRAPPED AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH AND SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH SECURED WITH MINIMUM R-5.0, 2" INSULATION WITH WITH MINIMUM R-5.0, 2" INSULATION WITH WITH MINIMUM R-5.0, 2" INSULATION WITH MINIMUM R-5.0, 2" INSULATION WITH MINIMUM R-5.0, 2" INSULATION WITH R-5.0, 2" INSULATION WITH R-5.0, 2" INSULATION WITH 2" INSULATION WITH 2" INSULATION WITH INSULATION WITH INSULATION WITH WITH WITH VAPOR BARRIER PER APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS BARRIER PER APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS BARRIER PER APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS PER APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS PER APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS WITH LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS LOCAL JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS JURISDICTION CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS CODE AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS AMENDMENTS. INSULATION SHALL HAVE MAXIMUM RATINGS INSULATION SHALL HAVE MAXIMUM RATINGS INSULATION SHALL HAVE MAXIMUM RATINGS SHALL HAVE MAXIMUM RATINGS SHALL HAVE MAXIMUM RATINGS HAVE MAXIMUM RATINGS HAVE MAXIMUM RATINGS MAXIMUM RATINGS MAXIMUM RATINGS RATINGS RATINGS OF 25 FLAME SPREAD, 50 SMOKE DEVELOPED. 17.ALL PENETRATIONS IN FIRE RATED WALL ASSEMBLIES SHALL BE SEALED WITH UL LISTED FIRE STOPPING MATERIAL. ALL PENETRATIONS IN FIRE RATED WALL ASSEMBLIES SHALL BE SEALED WITH UL LISTED FIRE STOPPING MATERIAL. 18.THE WALL MOUNTED TYPE-1 KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR THE WALL MOUNTED TYPE-1 KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR WALL MOUNTED TYPE-1 KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR WALL MOUNTED TYPE-1 KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR MOUNTED TYPE-1 KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR MOUNTED TYPE-1 KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR TYPE-1 KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR TYPE-1 KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR KITCHEN EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR EXHAUST HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR HOODS SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR SHALL BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR BE INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR INSTALLED WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR WITH TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR TOP OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR OF HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR HOOD HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR HEIGHTS AS NOTED IN THE HOOD SCHEDULE OR AS NOTED IN THE HOOD SCHEDULE OR AS NOTED IN THE HOOD SCHEDULE OR NOTED IN THE HOOD SCHEDULE OR NOTED IN THE HOOD SCHEDULE OR IN THE HOOD SCHEDULE OR IN THE HOOD SCHEDULE OR THE HOOD SCHEDULE OR THE HOOD SCHEDULE OR HOOD SCHEDULE OR HOOD SCHEDULE OR SCHEDULE OR SCHEDULE OR OR OR AS PER MANUFACTURERS INSTRUCTIONS. COORDINATE THEIR COMPLETE INSTALLATION AND PLACEMENT IN THE FIELD. 19.REFER TO MANUFACTURER SHEETS FOR THE HOOD CONTROL WIRING DIAGRAM, FOR OPERATION OF THE KITCHEN HOOD EQUIPMENT. REFER TO MANUFACTURER SHEETS FOR THE HOOD CONTROL WIRING DIAGRAM, FOR OPERATION OF THE KITCHEN HOOD EQUIPMENT. 20.PITCH ALL HORIZONTAL GREASE DUCTWORK UNIFORMLY BACK TOWARDS THE RESPECTIVE HOOD AT A MINIMUM 1/4" PER FOOT. PITCH ALL HORIZONTAL GREASE DUCTWORK UNIFORMLY BACK TOWARDS THE RESPECTIVE HOOD AT A MINIMUM 1/4" PER FOOT. 21.ROOF CURBS FOR EXHAUST FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE ROOF CURBS FOR EXHAUST FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE CURBS FOR EXHAUST FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE CURBS FOR EXHAUST FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE FOR EXHAUST FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE FOR EXHAUST FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE EXHAUST FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE EXHAUST FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE FANS SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE SHALL BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE BE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE PER DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE DETAILS SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE SECTION, AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE AND FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE FURNISHED WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE WITH THE FAN BASE, HOOD, AND FAN PACKAGE. THE THE FAN BASE, HOOD, AND FAN PACKAGE. THE THE FAN BASE, HOOD, AND FAN PACKAGE. THE FAN BASE, HOOD, AND FAN PACKAGE. THE FAN BASE, HOOD, AND FAN PACKAGE. THE BASE, HOOD, AND FAN PACKAGE. THE BASE, HOOD, AND FAN PACKAGE. THE HOOD, AND FAN PACKAGE. THE HOOD, AND FAN PACKAGE. THE AND FAN PACKAGE. THE AND FAN PACKAGE. THE FAN PACKAGE. THE FAN PACKAGE. THE PACKAGE. THE PACKAGE. THE THE THE GENERAL CONTRACTOR SHALL FLASH ROOF CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE CONTRACTOR SHALL FLASH ROOF CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE CONTRACTOR SHALL FLASH ROOF CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE SHALL FLASH ROOF CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE SHALL FLASH ROOF CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE FLASH ROOF CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE FLASH ROOF CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE ROOF CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE ROOF CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE CURBS AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE SIZE AND LOCATION OF ROOF OPENINGS WITH THE SIZE AND LOCATION OF ROOF OPENINGS WITH THE AND LOCATION OF ROOF OPENINGS WITH THE AND LOCATION OF ROOF OPENINGS WITH THE LOCATION OF ROOF OPENINGS WITH THE LOCATION OF ROOF OPENINGS WITH THE OF ROOF OPENINGS WITH THE OF ROOF OPENINGS WITH THE ROOF OPENINGS WITH THE ROOF OPENINGS WITH THE OPENINGS WITH THE OPENINGS WITH THE WITH THE WITH THE THE THE STRUCTURAL FRAMING. CUTTING OF STRUCTURAL MEMBERS IS NOT PERMITTED. 22.ROOF CURBS FOR ROOFTOP UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED ROOF CURBS FOR ROOFTOP UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED CURBS FOR ROOFTOP UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED CURBS FOR ROOFTOP UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED FOR ROOFTOP UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED FOR ROOFTOP UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED ROOFTOP UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED ROOFTOP UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED UNITS SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED SHALL BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED BE FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED FACTORY FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED FABRICATED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED OF GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED GALVANIZED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED STEEL CONSTRUCTION WITH WOOD NAILER, AND FURNISHED CONSTRUCTION WITH WOOD NAILER, AND FURNISHED CONSTRUCTION WITH WOOD NAILER, AND FURNISHED WITH WOOD NAILER, AND FURNISHED WITH WOOD NAILER, AND FURNISHED WOOD NAILER, AND FURNISHED WOOD NAILER, AND FURNISHED NAILER, AND FURNISHED NAILER, AND FURNISHED AND FURNISHED AND FURNISHED FURNISHED FURNISHED WITH THE HVAC EQUIPMENT PACKAGE. VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR THE HVAC EQUIPMENT PACKAGE. VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR THE HVAC EQUIPMENT PACKAGE. VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR HVAC EQUIPMENT PACKAGE. VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR HVAC EQUIPMENT PACKAGE. VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR EQUIPMENT PACKAGE. VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR EQUIPMENT PACKAGE. VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR PACKAGE. VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR PACKAGE. VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR VERIFY REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR REQUIREMENTS FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR FOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR THE ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR ROOF CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR CURBS WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR WITH THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR THE EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR EQUIPMENT SUPPLIER. THE GENERAL CONTRACTOR SUPPLIER. THE GENERAL CONTRACTOR SUPPLIER. THE GENERAL CONTRACTOR THE GENERAL CONTRACTOR THE GENERAL CONTRACTOR GENERAL CONTRACTOR GENERAL CONTRACTOR CONTRACTOR CONTRACTOR SHALL FIELD ASSEMBLE THE ROOF CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE FIELD ASSEMBLE THE ROOF CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE FIELD ASSEMBLE THE ROOF CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE ASSEMBLE THE ROOF CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE ASSEMBLE THE ROOF CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE THE ROOF CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE THE ROOF CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE ROOF CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE ROOF CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE CURBS, FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE FLASH AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE AND SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE SHIM DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE DEAD LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE LEVEL. COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE COORDINATE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE EXACT SIZE AND LOCATION OF ROOF OPENINGS WITH THE SIZE AND LOCATION OF ROOF OPENINGS WITH THE SIZE AND LOCATION OF ROOF OPENINGS WITH THE AND LOCATION OF ROOF OPENINGS WITH THE AND LOCATION OF ROOF OPENINGS WITH THE LOCATION OF ROOF OPENINGS WITH THE LOCATION OF ROOF OPENINGS WITH THE OF ROOF OPENINGS WITH THE OF ROOF OPENINGS WITH THE ROOF OPENINGS WITH THE ROOF OPENINGS WITH THE OPENINGS WITH THE OPENINGS WITH THE WITH THE WITH THE THE THE STRUCTURAL FRAMING. CUTTING OF STRUCTURAL MEMBERS IS NOT PERMITTED. 23.THE GREASE EXHAUST DUCT RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD THE GREASE EXHAUST DUCT RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD GREASE EXHAUST DUCT RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD GREASE EXHAUST DUCT RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD EXHAUST DUCT RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD EXHAUST DUCT RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD DUCT RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD DUCT RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD RISERS BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD BETWEEN THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD THE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD COLLARS AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD AND EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD EXHAUST FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD FANS SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD SHALL BE OF THE SAME SIZE AS THE RESPECTIVE HOOD BE OF THE SAME SIZE AS THE RESPECTIVE HOOD BE OF THE SAME SIZE AS THE RESPECTIVE HOOD OF THE SAME SIZE AS THE RESPECTIVE HOOD OF THE SAME SIZE AS THE RESPECTIVE HOOD THE SAME SIZE AS THE RESPECTIVE HOOD THE SAME SIZE AS THE RESPECTIVE HOOD SAME SIZE AS THE RESPECTIVE HOOD SAME SIZE AS THE RESPECTIVE HOOD SIZE AS THE RESPECTIVE HOOD SIZE AS THE RESPECTIVE HOOD AS THE RESPECTIVE HOOD AS THE RESPECTIVE HOOD THE RESPECTIVE HOOD THE RESPECTIVE HOOD RESPECTIVE HOOD RESPECTIVE HOOD HOOD HOOD COLLAR SIZE. REFER TO THE HOOD SHEETS FOR THE HOOD COLLAR SIZES AS PROVIDED BY THE HOOD MANUFACTURER. 24.PER APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING PER APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING APPLICABLE MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING MECHANICAL CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING CODES, WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING WITH LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING LOCAL JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING JURISDICTION CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING CODE AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING AMENDMENTS WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING WHEN REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING REQUIRED, EACH SINGLE SYSTEM PROVIDING HEATING EACH SINGLE SYSTEM PROVIDING HEATING EACH SINGLE SYSTEM PROVIDING HEATING SINGLE SYSTEM PROVIDING HEATING SINGLE SYSTEM PROVIDING HEATING SYSTEM PROVIDING HEATING SYSTEM PROVIDING HEATING PROVIDING HEATING PROVIDING HEATING HEATING HEATING OR COOLING AIR IN EXCESS OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL COOLING AIR IN EXCESS OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL COOLING AIR IN EXCESS OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL AIR IN EXCESS OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL AIR IN EXCESS OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL IN EXCESS OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL IN EXCESS OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL EXCESS OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL EXCESS OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL OF 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL 2000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL EQUIPPED WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL WITH AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL AN AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL AUTOMATIC SHUTOFF. AUTOMATIC SHUTOFF SHALL SHUTOFF. AUTOMATIC SHUTOFF SHALL SHUTOFF. AUTOMATIC SHUTOFF SHALL AUTOMATIC SHUTOFF SHALL AUTOMATIC SHUTOFF SHALL SHUTOFF SHALL SHUTOFF SHALL SHALL SHALL BE ACCOMPLISHED BY INTERRUPTING THE POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF ACCOMPLISHED BY INTERRUPTING THE POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF ACCOMPLISHED BY INTERRUPTING THE POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF BY INTERRUPTING THE POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF BY INTERRUPTING THE POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF INTERRUPTING THE POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF INTERRUPTING THE POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF THE POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF THE POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF POWER SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF SOURCE OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF THE AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF AIR MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF MOVING EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF EQUIPMENT DEVICES WHICH WILL DETECT PRODUCTS OF DEVICES WHICH WILL DETECT PRODUCTS OF DEVICES WHICH WILL DETECT PRODUCTS OF WHICH WILL DETECT PRODUCTS OF WHICH WILL DETECT PRODUCTS OF WILL DETECT PRODUCTS OF WILL DETECT PRODUCTS OF DETECT PRODUCTS OF DETECT PRODUCTS OF PRODUCTS OF PRODUCTS OF OF OF COMBUSTION OTHER THAN HEAT, AND WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION OTHER THAN HEAT, AND WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION OTHER THAN HEAT, AND WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION THAN HEAT, AND WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION THAN HEAT, AND WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION HEAT, AND WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION HEAT, AND WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION AND WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION AND WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION WHICH COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION COMPLY WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION WITH THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION THE IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION IBC, SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION SHALL BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION BE LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION LABELED BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION BY AN APPROVED AGENCY FOR AIR DUCT INSTALLATION AN APPROVED AGENCY FOR AIR DUCT INSTALLATION AN APPROVED AGENCY FOR AIR DUCT INSTALLATION APPROVED AGENCY FOR AIR DUCT INSTALLATION APPROVED AGENCY FOR AIR DUCT INSTALLATION AGENCY FOR AIR DUCT INSTALLATION AGENCY FOR AIR DUCT INSTALLATION FOR AIR DUCT INSTALLATION FOR AIR DUCT INSTALLATION AIR DUCT INSTALLATION AIR DUCT INSTALLATION DUCT INSTALLATION DUCT INSTALLATION INSTALLATION INSTALLATION AND SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH INSTALLATION INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH INSTRUCTIONS. SUCH DEVICES SHALL BE COMPATIBLE WITH SUCH DEVICES SHALL BE COMPATIBLE WITH SUCH DEVICES SHALL BE COMPATIBLE WITH DEVICES SHALL BE COMPATIBLE WITH DEVICES SHALL BE COMPATIBLE WITH SHALL BE COMPATIBLE WITH SHALL BE COMPATIBLE WITH BE COMPATIBLE WITH BE COMPATIBLE WITH COMPATIBLE WITH COMPATIBLE WITH WITH WITH THE OPERATING VELOCITIES, PRESSURES, TEMPERATURES AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE OPERATING VELOCITIES, PRESSURES, TEMPERATURES AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE OPERATING VELOCITIES, PRESSURES, TEMPERATURES AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE VELOCITIES, PRESSURES, TEMPERATURES AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE VELOCITIES, PRESSURES, TEMPERATURES AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE PRESSURES, TEMPERATURES AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE PRESSURES, TEMPERATURES AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE TEMPERATURES AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE TEMPERATURES AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE AND HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE HUMIDITIES OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE OF THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE THE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE SYSTEM WHERE FIRE DETECTION OR ALARM SYSTEMS ARE WHERE FIRE DETECTION OR ALARM SYSTEMS ARE WHERE FIRE DETECTION OR ALARM SYSTEMS ARE FIRE DETECTION OR ALARM SYSTEMS ARE FIRE DETECTION OR ALARM SYSTEMS ARE DETECTION OR ALARM SYSTEMS ARE DETECTION OR ALARM SYSTEMS ARE OR ALARM SYSTEMS ARE OR ALARM SYSTEMS ARE ALARM SYSTEMS ARE ALARM SYSTEMS ARE SYSTEMS ARE SYSTEMS ARE ARE ARE PROVIDED FOR THE BUILDING, SMOKE DETECTORS SHALL BE SUPERVISED BY SUCH SYSTEMS. 25.OWNER SHALL HAVE A THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE OWNER SHALL HAVE A THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE SHALL HAVE A THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE SHALL HAVE A THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE HAVE A THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE HAVE A THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE A THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE A THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE THIRD PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE PARTY CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE CERTIFIED AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE AIR BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE BALANCE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE PERFORMED AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE AT COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE COMPLETION OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE OF PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE PROJECT BY CONTRACTOR. ANY DIFFERENCES ARE BY CONTRACTOR. ANY DIFFERENCES ARE BY CONTRACTOR. ANY DIFFERENCES ARE CONTRACTOR. ANY DIFFERENCES ARE CONTRACTOR. ANY DIFFERENCES ARE ANY DIFFERENCES ARE ANY DIFFERENCES ARE ANY DIFFERENCES ARE DIFFERENCES ARE DIFFERENCES ARE ARE ARE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR. 26.THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER SHALL BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER SHALL BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER BE RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER RESPONSIBLE FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER FOR REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER REPLACING THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER THE AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER AIR FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER FILTERS AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER AT THE ROOFTOP UNITS WITH AS PER MANUFACTURER THE ROOFTOP UNITS WITH AS PER MANUFACTURER THE ROOFTOP UNITS WITH AS PER MANUFACTURER ROOFTOP UNITS WITH AS PER MANUFACTURER ROOFTOP UNITS WITH AS PER MANUFACTURER UNITS WITH AS PER MANUFACTURER UNITS WITH AS PER MANUFACTURER WITH AS PER MANUFACTURER WITH AS PER MANUFACTURER AS PER MANUFACTURER AS PER MANUFACTURER PER MANUFACTURER PER MANUFACTURER MANUFACTURER MANUFACTURER RECOMMNDATIONS AT THE COMPLETION OF CONSTRUCTION AND PRIOR TO AIR BALANCE. 27.MECHANICAL CONTRACTOR SHALL BE ON SITE AND PRESENT AT THE DATE OF PROJECT TURNOVER. MECHANICAL CONTRACTOR SHALL BE ON SITE AND PRESENT AT THE DATE OF PROJECT TURNOVER. 28.AIR DEVICE SIZES SHOWN ON SCHEDULES ARE NECK SIZES. AIR DEVICE SIZES SHOWN ON SCHEDULES ARE NECK SIZES. 29.BOTTOM OF DUCT ELEVATION INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE BOTTOM OF DUCT ELEVATION INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE OF DUCT ELEVATION INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE OF DUCT ELEVATION INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE DUCT ELEVATION INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE DUCT ELEVATION INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE ELEVATION INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE ELEVATION INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE INDICATED ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE ON THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE THE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE DRAWING INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE INDICATES THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE THE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE APPROXIMATE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE HEIGHT ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE ABOVE FINISHED FLOOR LEVEL TO THE UNDERSIDE FINISHED FLOOR LEVEL TO THE UNDERSIDE FINISHED FLOOR LEVEL TO THE UNDERSIDE FLOOR LEVEL TO THE UNDERSIDE FLOOR LEVEL TO THE UNDERSIDE LEVEL TO THE UNDERSIDE LEVEL TO THE UNDERSIDE TO THE UNDERSIDE TO THE UNDERSIDE THE UNDERSIDE THE UNDERSIDE UNDERSIDE UNDERSIDE OF THE DUCT. THIS INFORMATION IS PROVIDED AS AN AID TO COORDINATION. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE. 30.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND IN ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND ACCORDANCE WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND WITH APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND APPLICABLE LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND LOCAL STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND STATE AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND FEDERAL CODES AND STANDARDS. CRAFTSMANSHIP AND CODES AND STANDARDS. CRAFTSMANSHIP AND CODES AND STANDARDS. CRAFTSMANSHIP AND AND STANDARDS. CRAFTSMANSHIP AND AND STANDARDS. CRAFTSMANSHIP AND STANDARDS. CRAFTSMANSHIP AND STANDARDS. CRAFTSMANSHIP AND CRAFTSMANSHIP AND CRAFTSMANSHIP AND AND AND MATERIAL SHALL BE OF THE FINEST QUALITY. 31.UNLESS NOTED OTHERWISE, ALL CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED UNLESS NOTED OTHERWISE, ALL CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED NOTED OTHERWISE, ALL CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED NOTED OTHERWISE, ALL CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED OTHERWISE, ALL CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED OTHERWISE, ALL CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED ALL CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED ALL CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED CAPACITIES INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED INDICATED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED ARE AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED AT SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED SITE CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED CONDITIONS. ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED ALL EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED EQUIPMENT SHALL BE ADJUSTED, MODIFIED AND ORDERED SHALL BE ADJUSTED, MODIFIED AND ORDERED SHALL BE ADJUSTED, MODIFIED AND ORDERED BE ADJUSTED, MODIFIED AND ORDERED BE ADJUSTED, MODIFIED AND ORDERED ADJUSTED, MODIFIED AND ORDERED ADJUSTED, MODIFIED AND ORDERED MODIFIED AND ORDERED MODIFIED AND ORDERED AND ORDERED AND ORDERED ORDERED ORDERED TO ACCOMMODATE SITE CONDITIONS 32.THE CONTRACTOR SHALL REVIEW THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND THE CONTRACTOR SHALL REVIEW THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND CONTRACTOR SHALL REVIEW THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND CONTRACTOR SHALL REVIEW THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND SHALL REVIEW THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND SHALL REVIEW THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND REVIEW THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND REVIEW THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND THE CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND CONTRACT DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND DOCUMENTS FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND FULLY PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND PRIOR TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND TO THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND THE SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND SUBMITTAL PHASE OF THE PROJECT. CONFLICTS WITHIN AND PHASE OF THE PROJECT. CONFLICTS WITHIN AND PHASE OF THE PROJECT. CONFLICTS WITHIN AND OF THE PROJECT. CONFLICTS WITHIN AND OF THE PROJECT. CONFLICTS WITHIN AND THE PROJECT. CONFLICTS WITHIN AND THE PROJECT. CONFLICTS WITHIN AND PROJECT. CONFLICTS WITHIN AND PROJECT. CONFLICTS WITHIN AND CONFLICTS WITHIN AND CONFLICTS WITHIN AND WITHIN AND WITHIN AND AND AND BETWEEN THE CONTRACTOR DOCUMENTS SHALL BE NOTED IN WRITING TO THE ENGINEER PRIOR TO SUBMITTING DATA SHEETS FOR REVIEW. 33.REFRIGERANT LINES & DUCTS IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING REFRIGERANT LINES & DUCTS IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING LINES & DUCTS IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING LINES & DUCTS IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING & DUCTS IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING & DUCTS IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING DUCTS IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING DUCTS IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING IN FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING FINISH ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING SPACES SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING SHALL BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING BE CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING CONCEALED IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING IN FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING FURRED CHASES OR INSTALLED ABOVE SUSPENDED CEILING CHASES OR INSTALLED ABOVE SUSPENDED CEILING CHASES OR INSTALLED ABOVE SUSPENDED CEILING OR INSTALLED ABOVE SUSPENDED CEILING OR INSTALLED ABOVE SUSPENDED CEILING INSTALLED ABOVE SUSPENDED CEILING INSTALLED ABOVE SUSPENDED CEILING ABOVE SUSPENDED CEILING ABOVE SUSPENDED CEILING SUSPENDED CEILING SUSPENDED CEILING CEILING CEILING UNLESS NOTED DIFFERENT. 34.INSTALL EQUIPMENT TO AVOID SOUND OR NOISE TRANSMISSION TO OCCUPIED SPACES. INSTALL EQUIPMENT TO AVOID SOUND OR NOISE TRANSMISSION TO OCCUPIED SPACES. 35.CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE SHALL COMPLY WITH ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE SHALL COMPLY WITH ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE COMPLY WITH ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE COMPLY WITH ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE WITH ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE WITH ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE ALL REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE REQUIREMENTS LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE LISTED ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE ON THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE DRAWINGS AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE AND SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE SPECIFICATIONS INCLUDING THOSE LISTED UNDER THE INCLUDING THOSE LISTED UNDER THE INCLUDING THOSE LISTED UNDER THE THOSE LISTED UNDER THE THOSE LISTED UNDER THE LISTED UNDER THE LISTED UNDER THE UNDER THE UNDER THE THE THE ENERGY COMPLIANCE REPORT. ALL EQUIPMENT INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND COMPLIANCE REPORT. ALL EQUIPMENT INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND COMPLIANCE REPORT. ALL EQUIPMENT INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND REPORT. ALL EQUIPMENT INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND REPORT. ALL EQUIPMENT INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND ALL EQUIPMENT INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND ALL EQUIPMENT INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND EQUIPMENT INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND EQUIPMENT INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND INSTALLED SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND SHALL BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND BE PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND PROVIDED WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND THE MANUFACTURER'S RECOMMENDED MAINTENANCE AND MANUFACTURER'S RECOMMENDED MAINTENANCE AND MANUFACTURER'S RECOMMENDED MAINTENANCE AND RECOMMENDED MAINTENANCE AND RECOMMENDED MAINTENANCE AND MAINTENANCE AND MAINTENANCE AND AND AND OPERATING CLEARANCES. 36.TEST, ADJUST AND BALANCE ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND TEST, ADJUST AND BALANCE ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND ADJUST AND BALANCE ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND ADJUST AND BALANCE ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND AND BALANCE ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND AND BALANCE ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND BALANCE ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND BALANCE ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND ALL AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND AIR AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND WATER SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND SYSTEMS AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND AFTER INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND INSTALLATION IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND IS COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND COMPLETE. SUBMIT REPORTS TO ENGINEER FOR REVIEW AND SUBMIT REPORTS TO ENGINEER FOR REVIEW AND SUBMIT REPORTS TO ENGINEER FOR REVIEW AND REPORTS TO ENGINEER FOR REVIEW AND REPORTS TO ENGINEER FOR REVIEW AND TO ENGINEER FOR REVIEW AND TO ENGINEER FOR REVIEW AND ENGINEER FOR REVIEW AND ENGINEER FOR REVIEW AND FOR REVIEW AND FOR REVIEW AND REVIEW AND REVIEW AND AND AND APPROVAL. 37.TURNOVER ALL EQUIPMENT AND MATERIAL OWNING, OPERATING AND MAINTENANCE (OM) MANUALS TO OWNER AFTER INSTALLATION IS COMPLETE. TURNOVER ALL EQUIPMENT AND MATERIAL OWNING, OPERATING AND MAINTENANCE (OM) MANUALS TO OWNER AFTER INSTALLATION IS COMPLETE. 38.KEEP DUCTWORK AND PIPING INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO KEEP DUCTWORK AND PIPING INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO DUCTWORK AND PIPING INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO DUCTWORK AND PIPING INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO AND PIPING INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO AND PIPING INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO PIPING INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO PIPING INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO INTERIOR CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO CLEAN AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO AND FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO FREE OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO OF DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO DEBRIS THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO THROUGHOUT THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO THE PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO PROJECT. CAP ALL PIPING AND DUCTWORK EXPOSED TO CAP ALL PIPING AND DUCTWORK EXPOSED TO CAP ALL PIPING AND DUCTWORK EXPOSED TO ALL PIPING AND DUCTWORK EXPOSED TO ALL PIPING AND DUCTWORK EXPOSED TO PIPING AND DUCTWORK EXPOSED TO PIPING AND DUCTWORK EXPOSED TO AND DUCTWORK EXPOSED TO AND DUCTWORK EXPOSED TO DUCTWORK EXPOSED TO DUCTWORK EXPOSED TO EXPOSED TO EXPOSED TO TO TO THE ELEMENTS. DO NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY ELEMENTS. DO NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY ELEMENTS. DO NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY DO NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY DO NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY ETC. PRIOR TO REQUESTING OBSERVATION BY ETC. PRIOR TO REQUESTING OBSERVATION BY PRIOR TO REQUESTING OBSERVATION BY PRIOR TO REQUESTING OBSERVATION BY TO REQUESTING OBSERVATION BY TO REQUESTING OBSERVATION BY REQUESTING OBSERVATION BY REQUESTING OBSERVATION BY OBSERVATION BY OBSERVATION BY BY BY THE ENGINEER. ALL WORK COVERED WITHOUT OBSERVATION BY THE ENGINEER SHALL BE UNCOVERED FOR OBSERVATION. 39.DO NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. DO NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. NOT COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. COVER ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. ANY MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. MECHANICAL OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. OR PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. PLUMBING WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. WORK IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. IN WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. WALLS, ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. ABOVE CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. CEILINGS, ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. ETC. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. PRIOR TO REQUESTING OBSERVATION BY THE ENGINEER. TO REQUESTING OBSERVATION BY THE ENGINEER. TO REQUESTING OBSERVATION BY THE ENGINEER. REQUESTING OBSERVATION BY THE ENGINEER. REQUESTING OBSERVATION BY THE ENGINEER. OBSERVATION BY THE ENGINEER. OBSERVATION BY THE ENGINEER. BY THE ENGINEER. BY THE ENGINEER. THE ENGINEER. THE ENGINEER. ENGINEER. ENGINEER. ALL WORK COVERED WITHOUT OBSERVATION BY THE ENGINEER SHALL BE UNCOVERED FOR OBSERVATION. 40.MAINTAIN MINIMUM CLEARANCES IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN MAINTAIN MINIMUM CLEARANCES IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN MINIMUM CLEARANCES IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN MINIMUM CLEARANCES IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN CLEARANCES IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN CLEARANCES IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN FRONT OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN OF ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN ALL CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN CONTROL AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN AND ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN ELECTRIC PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN PANELS ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN ON EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN EQUIPMENT SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN SUCH AS FANS, AIR TERMINAL UNITS, ETC. IN AS FANS, AIR TERMINAL UNITS, ETC. IN AS FANS, AIR TERMINAL UNITS, ETC. IN FANS, AIR TERMINAL UNITS, ETC. IN FANS, AIR TERMINAL UNITS, ETC. IN AIR TERMINAL UNITS, ETC. IN AIR TERMINAL UNITS, ETC. IN TERMINAL UNITS, ETC. IN TERMINAL UNITS, ETC. IN UNITS, ETC. IN UNITS, ETC. IN ETC. IN ETC. IN IN IN ACCORDANCE WITH THE FOLLOWING: 120 V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING WITH THE FOLLOWING: 120 V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING WITH THE FOLLOWING: 120 V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING THE FOLLOWING: 120 V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING THE FOLLOWING: 120 V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING FOLLOWING: 120 V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING FOLLOWING: 120 V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 120 V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 120 V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING V = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING = 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 36", 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 208 V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING V = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING = 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 42", 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 460 V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING V = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING = 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING 48". CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING CLEARANCE MAY BE MEASURED THROUGH REMOVABLE CEILING MAY BE MEASURED THROUGH REMOVABLE CEILING MAY BE MEASURED THROUGH REMOVABLE CEILING BE MEASURED THROUGH REMOVABLE CEILING BE MEASURED THROUGH REMOVABLE CEILING MEASURED THROUGH REMOVABLE CEILING MEASURED THROUGH REMOVABLE CEILING THROUGH REMOVABLE CEILING THROUGH REMOVABLE CEILING REMOVABLE CEILING REMOVABLE CEILING CEILING CEILING CEILING GRID OR ACCESS PANEL. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. OR ACCESS PANEL. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. OR ACCESS PANEL. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. ACCESS PANEL. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. ACCESS PANEL. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. PANEL. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. PANEL. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. WHERE FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. FACTORY MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. MOUNTED PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. PANELS DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. DO NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. NOT ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. ALLOW ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. ADEQUATE CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. CLEARANCE, RELOCATE AND REMOUNT AS REQUIRED. RELOCATE AND REMOUNT AS REQUIRED. RELOCATE AND REMOUNT AS REQUIRED. AND REMOUNT AS REQUIRED. AND REMOUNT AS REQUIRED. REMOUNT AS REQUIRED. REMOUNT AS REQUIRED. AS REQUIRED. AS REQUIRED. AS REQUIRED. REQUIRED. REQUIRED. ALL FACTORY WARRANTIES SHALL BE MAINTAINED. 41.GENERAL CONTRACTOR SHALL MAINTAIN ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE GENERAL CONTRACTOR SHALL MAINTAIN ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE CONTRACTOR SHALL MAINTAIN ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE CONTRACTOR SHALL MAINTAIN ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE SHALL MAINTAIN ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE SHALL MAINTAIN ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE MAINTAIN ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE MAINTAIN ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE ON A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE A DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE DAILY BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE BASIS AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE AT THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE PROJECT SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE SITE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE A COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE COMPLETE SET OF RECORD DRAWINGS, REFLECTING THE SET OF RECORD DRAWINGS, REFLECTING THE SET OF RECORD DRAWINGS, REFLECTING THE OF RECORD DRAWINGS, REFLECTING THE OF RECORD DRAWINGS, REFLECTING THE RECORD DRAWINGS, REFLECTING THE RECORD DRAWINGS, REFLECTING THE DRAWINGS, REFLECTING THE DRAWINGS, REFLECTING THE REFLECTING THE REFLECTING THE THE THE PRECISE LOCATION OF CONCEALED EQUIPMENT, EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE LOCATION OF CONCEALED EQUIPMENT, EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE LOCATION OF CONCEALED EQUIPMENT, EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE OF CONCEALED EQUIPMENT, EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE OF CONCEALED EQUIPMENT, EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE CONCEALED EQUIPMENT, EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE CONCEALED EQUIPMENT, EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE EQUIPMENT, EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE EQUIPMENT, EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE EMBEDDED PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE PIPING, VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE VALVES, PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE PIPE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE RE-ROUTES, AND ALL CHANGES OR DEVIATIONS IN THE AND ALL CHANGES OR DEVIATIONS IN THE AND ALL CHANGES OR DEVIATIONS IN THE ALL CHANGES OR DEVIATIONS IN THE ALL CHANGES OR DEVIATIONS IN THE CHANGES OR DEVIATIONS IN THE CHANGES OR DEVIATIONS IN THE OR DEVIATIONS IN THE OR DEVIATIONS IN THE DEVIATIONS IN THE DEVIATIONS IN THE IN THE IN THE THE THE MECHANICAL WORK FROM THAT SHOWN ON THE CONTRACT DRAWINGS. 42.ALL MEDIUM PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW ALL MEDIUM PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW MEDIUM PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW MEDIUM PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW DUCT LEAKAGE TEST MANUAL. 10% OF LOW DUCT LEAKAGE TEST MANUAL. 10% OF LOW LEAKAGE TEST MANUAL. 10% OF LOW LEAKAGE TEST MANUAL. 10% OF LOW TEST MANUAL. 10% OF LOW TEST MANUAL. 10% OF LOW MANUAL. 10% OF LOW MANUAL. 10% OF LOW 10% OF LOW 10% OF LOW 10% OF LOW OF LOW OF LOW LOW LOW PRESSURE DUCT SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL DUCT SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL DUCT SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL RATE, THE ENTIRE DUCT SYSTEMS SHALL RATE, THE ENTIRE DUCT SYSTEMS SHALL THE ENTIRE DUCT SYSTEMS SHALL THE ENTIRE DUCT SYSTEMS SHALL ENTIRE DUCT SYSTEMS SHALL ENTIRE DUCT SYSTEMS SHALL DUCT SYSTEMS SHALL DUCT SYSTEMS SHALL SYSTEMS SHALL SYSTEMS SHALL SHALL SHALL BE TESTED AND DUCT LEAKAGE SHALL BE CORRECTED UNTIL SATISFACTORY RATES ARE OBTAINED. 43.ALL MEDIUM PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW ALL MEDIUM PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW MEDIUM PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW MEDIUM PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW PRESSURE DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW DUCTWORK SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW SHALL BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW BE TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW TESTED IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW HVAC AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW AIR DUCT LEAKAGE TEST MANUAL. 10% OF LOW DUCT LEAKAGE TEST MANUAL. 10% OF LOW DUCT LEAKAGE TEST MANUAL. 10% OF LOW LEAKAGE TEST MANUAL. 10% OF LOW LEAKAGE TEST MANUAL. 10% OF LOW TEST MANUAL. 10% OF LOW TEST MANUAL. 10% OF LOW MANUAL. 10% OF LOW MANUAL. 10% OF LOW 10% OF LOW 10% OF LOW 10% OF LOW OF LOW OF LOW LOW LOW PRESSURE DUCT SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL DUCT SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL DUCT SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL SYSTEM SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL BE TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL TESTED. IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL IF LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL LEAKAGE TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL TEST RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL RESULTS EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL EXCEED THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL THE MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL MAX. ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL ALLOWABLE RATE, THE ENTIRE DUCT SYSTEMS SHALL RATE, THE ENTIRE DUCT SYSTEMS SHALL RATE, THE ENTIRE DUCT SYSTEMS SHALL THE ENTIRE DUCT SYSTEMS SHALL THE ENTIRE DUCT SYSTEMS SHALL ENTIRE DUCT SYSTEMS SHALL ENTIRE DUCT SYSTEMS SHALL DUCT SYSTEMS SHALL DUCT SYSTEMS SHALL SYSTEMS SHALL SYSTEMS SHALL SHALL SHALL BE TESTED AND DUCT LEAKAGE SHALL BE CORRECTED UNTIL SATISFACTORY RATES ARE OBTAINED. 44.GUARDS SHALL BE PROVIDED WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING GUARDS SHALL BE PROVIDED WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING SHALL BE PROVIDED WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING SHALL BE PROVIDED WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING BE PROVIDED WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING BE PROVIDED WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING PROVIDED WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING PROVIDED WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING WHERE APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING APPLIANCES, EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING EQUIPMENT, FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING FANS OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING OR OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING OTHER COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING COMPONENTS THAT REQUIRE SERVICE AND ROOF HATCH OPENING THAT REQUIRE SERVICE AND ROOF HATCH OPENING THAT REQUIRE SERVICE AND ROOF HATCH OPENING REQUIRE SERVICE AND ROOF HATCH OPENING REQUIRE SERVICE AND ROOF HATCH OPENING SERVICE AND ROOF HATCH OPENING SERVICE AND ROOF HATCH OPENING AND ROOF HATCH OPENING AND ROOF HATCH OPENING ROOF HATCH OPENING ROOF HATCH OPENING HATCH OPENING HATCH OPENING OPENING OPENING ARE LOCATED WITHIN 10' OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 LOCATED WITHIN 10' OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 LOCATED WITHIN 10' OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 WITHIN 10' OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 WITHIN 10' OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 10' OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 10' OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 OR OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 OPEN SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 SIDE OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 OF A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 A WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 WALKING SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 SURFACE AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 OR OPEN SIDE IS LOCATED MORE THAN 30 OR OPEN SIDE IS LOCATED MORE THAN 30 OPEN SIDE IS LOCATED MORE THAN 30 OPEN SIDE IS LOCATED MORE THAN 30 SIDE IS LOCATED MORE THAN 30 SIDE IS LOCATED MORE THAN 30 IS LOCATED MORE THAN 30 IS LOCATED MORE THAN 30 LOCATED MORE THAN 30 LOCATED MORE THAN 30 MORE THAN 30 MORE THAN 30 THAN 30 THAN 30 30 30 INCHES ABOVE THE FLOOR, ROOF OR GRADE BELOW.